Building work price list: Mosaic Tiling
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Wall and floor tiling cost | ||||
| Mosaic tiling | m² | €65.00 / m² | m² | enter quantity- |
| Standard wall/floor tiling up to 60 cm | m² | €39.00 / m² | m² | enter quantity- |
| Porcelain tiling over 60 cm | m² | €49.00 / m² | m² | enter quantity- |
| XL format wall/floor tiling 60×120 | m² | m² | - | |
| XXL format wall/floor tiling 120×260 | m² | m² | - | |
| Natural/artificial stone / clinker tiling | m² | €59.00 / m² | m² | enter quantity- |
| Split face stone cladding (fences, plinth) | m² | m² | - | |
| Decorative strip / Listello tiling | lm | €2.50 / lm | lm | enter quantity- |
| Diagonal floor tiling up to 600 mm | m² | €45.00 / m² | m² | enter quantity- |
| Grouting | m² | €1.90 / m² | m² | enter quantity- |
| Silicone grouting | m² | €3.60 / m² | m² | enter quantity- |
| Siliconing internal corners and edges | lm | €1.90 / lm | lm | enter quantity- |
| Microcement decorative coating 2-3 mm | m² | €80.00 / m² | m² | enter quantity- |
| Waterjet cutting 60×60 (mitred edge) | lm | €5.90 / lm | lm | enter quantity- |
| Waterjet cutting 120×120 (mitred edge) | lm | €7.90 / lm | lm | enter quantity- |
| Waterjet cutting - tile cut-out | lm | €10.50 / lm | lm | enter quantity- |
| Mitred edge (installation and fitting) | lm | €59.00 / lm | lm | enter quantity- |
| Skirting from tiles | lm | €6.50 / lm | lm | enter quantity- |
| Cutting holes in tiles | pcs | €12.00 / pcs | pcs | enter quantity- |
| Core drilling holes in floor and porcelain tiles | pcs | €12.50 / pcs | pcs | enter quantity- |
What mosaic is and when it makes sense
Mosaic pieces usually come bonded to mesh or paper in sheets of roughly 30 × 30 cm. The tiler does not fix each piece separately but lays a whole sheet at once. People choose mosaic for shower enclosures, the wall behind a bath, a kitchen splashback or a decorative strip within other tiling. You will find the wider context in the overview of tiling services.
Mosaic adapts easily to curves, recesses, niches and the fall of a shower floor. A large tile would have to be cut into small pieces in such places. The downside is the number of grout joints. With mosaic, accurate workmanship and the right adhesive, grout and waterproofing matter even more than usual.
What to decide before the tiler starts
A change after fixing usually means stripping the tiles off. Before work begins, make the following clear:
- Type of mosaic for the location: ceramic is enough for a dry kitchen wall. A shower floor needs harder porcelain mosaic. Glass and stone have their own requirements for adhesive and treatment.
- Whole area or just a strip: mosaic can cover the entire shower, or only one wall, a niche or a border. Less mosaic means less work, but the transition to other tiles has to be planned.
- Pattern: single-colour sheets, a random blend of shades, a colour gradient or a picture. A more complex pattern needs a setting-out plan in advance.
- Grout colour: with so many joints, the grout colour changes the overall look considerably. Light grout in a shower shows dirt sooner, while a contrasting grout highlights every inaccuracy.
- Position of outlets: taps, shower riser rail, waste, sockets and shelves should be fixed before tiling. Cuts then come out clean and there is no need to drill through finished mosaic later.
- Edge finishing: whether tile trims will be used or the edges will be finished another way.
- Order of bath and tiling: the bath can be fitted before or after tiling. Agree this in advance, because it determines how the joint between bath and wall is sealed.
Types of mosaic and when to choose each
- ceramic mosaic: the usual choice indoors, easy to cut and lay, suitable for bathroom and kitchen walls,
- porcelain mosaic: harder and less absorbent, so also suitable for shower floors and outdoors if the manufacturer states it is frost-resistant,
- glass mosaic: water-resistant, used in showers and swimming pools. It is mostly translucent, so the adhesive colour and every imperfection beneath it show through. Opaque and back-painted versions are also available,
- stone mosaic: natural appearance, but absorbent and sensitive to acids, so it must be sealed.
Adhesive and grout for glass mosaic
Translucent glass mosaic is almost always fixed with a white flexible adhesive recommended by the manufacturer for glass. White adhesive keeps the colour of the glass clean. Grey adhesive would turn the glass greyish and cause patches. The adhesive must give full coverage. After combing with a notched trowel it is flattened again, otherwise trowel ridges and voids show through the glass.
For grouting glass, white or epoxy grout is often recommended, or a grout the mosaic manufacturer lists as suitable for glass. The glossy surface can be scratched while grout is worked in. Grouting is therefore done with a soft rubber float and without pressing on the edges of the pieces.
Cement-based or epoxy grout
Cement-based grout is easier to work with and is fine for ordinary walls. Epoxy grout resists water, grease and mould better, so it is worth using in showers and behind kitchen worktops. It is harder to work with, however, sets quickly and residue must be washed off the surface straight away before it hardens. Choose a tile adhesive classified to BS EN 12004 (e.g. C2 for demanding substrates) and a grout classified to BS EN 13888 (e.g. CG2).
Mosaic in showers
Mosaic is popular on shower floors because the small pieces follow the fall to the waste well, and the many joints make it less slippery. Porcelain mosaic with epoxy grout suits this use. The mosaic does not create the fall, though. The screed or the substrate under the tanking must already have it, and the mosaic simply follows it. If the fall in the substrate is wrong, the mosaic will not correct it.
Continuous waterproofing is essential under mosaic in a shower. Most often this is a liquid tanking system, one- or two-component, applied in two coats. Some systems use a waterproof membrane bedded in adhesive instead. In every case, internal corners, the area around the waste and pipe penetrations are sealed with tapes and collars.
How much mosaic to buy
An allowance of roughly 10 to 15 % for cuts and waste is usually added to the measured area in m². A complicated area with many corners and recesses tends to need a larger allowance. It is worth buying the full quantity at once from a single batch, because mosaic from another batch may differ slightly in shade. Keep a few sheets for future repairs.
Permissions and consents for tiling in a flat
In a flat it is sensible to inform the managing agent or freeholder in advance about noisy work and the removal of debris, and to check what the lease says about alterations. Tiling an existing wall does not normally need any approval. If larger changes are involved, such as moving a partition or services, check with the local authority building control what applies. Moving sockets on a kitchen splashback is a job for a qualified electrician. Risers and communal services in the building may only be altered with the consent of the freeholder or managing agent.
How mosaic tiling is done, step by step
- Checking the substrate: the tiler checks the flatness of the wall with a long straightedge and makes sure it is sound and dry. Small pieces follow every irregularity, and in raking light every undulation then shows. Wall tiling should follow the BS 5385 code of practice, with the background prepared and the adhesive chosen to suit the tile size and weight.
- Levelling: loose plaster or hollow-sounding old tiles are removed. Irregularities are levelled with a skim or levelling compound, left to dry as the manufacturer specifies.
- Priming: the substrate is primed with a primer suitable for the chosen adhesive. A bonding primer is applied to sound existing tiles.
- Waterproofing wet areas: in the shower and around the bath, liquid tanking is applied, usually in two coats, or a waterproof membrane is bonded on. Sealing tapes and collars go into corners, around the waste and at pipe penetrations. If the bath is already fitted, the joint between bath and wall is sealed as well. If the bath will be fitted after tiling, the waterproofing must extend below the level of its rim.
- Setting out: the mosaic is dry-laid and set out so that cuts fall in less visible places and around tap outlets. A horizontal line is marked as the starting point.
- Fixing: adhesive is applied with a small-notch trowel so that it does not squeeze into the joints. Mesh-backed mosaic is fixed mesh side into the adhesive, paper-faced mosaic with the paper facing out. The sheets are pressed and aligned so that the gaps between sheets match the joints within each sheet. Otherwise a visible grid appears.
- Cleaning joints while fresh: adhesive squeezed into the joints is removed before it hardens. With paper-faced mosaic, the paper is dampened and peeled off once the adhesive has partly set.
- Adhesive curing: this takes as long as stated on the packaging, usually at least one day.
- Sealing before grouting: with stone mosaic, or absorbent unglazed mosaic, a first coat of sealer is applied so that the surface does not absorb the grout colour.
- Grouting: grout is worked in with a rubber float diagonally across the joints. After a short time the surface is washed with a damp sponge, and once dry the haze is removed.
- Silicone: internal corners, joints with the bath, shower tray or worktop, and transitions to other materials are filled with silicone sealant, not rigid grout.
- Final sealing: stone mosaic is sealed again. With cement-based grout, the joints can also be sealed if agreed.
Mosaic tiling price per m² and what affects it
The guide labour price is €65.00 per m². Mosaic takes longer than laying standard tiles up to 60 cm, because the same area has far more joints and cuts. The final price mainly depends on:
- condition of the substrate: a flat, sound and dry wall saves time. Old flaking plaster or existing tiles have to be dealt with separately, and levelling is usually a separate item,
- size and complexity of the area: a small shower with many corners, a shelf and a niche needs relatively more work than a flat wall. Small areas often carry a minimum charge or a higher rate per m²,
- pattern: single-colour sheets go up quickly. Colour gradients, ornaments or pictures need a plan and patience and extend the job considerably,
- material: glass and stone are slower to cut, glass needs special nippers or a wet saw and stone also needs sealing,
- shower floor: fixing to a substrate falling towards the waste is slower than fixing to a flat wall. If the fall still has to be formed in the screed, that is extra work,
- details: trims, external corners, tap outlets and sockets that need cutting around,
- type of grout: epoxy grout costs more than cement-based grout and is slower to apply,
- waterproofing: essential in a shower and normally priced as a separate item.
When comparing quotes, check whether they include substrate preparation, priming, tanking, grouting, silicone and sealing, or only the fixing itself.
What makes the job easier and what slows it down
- All material is on site: mosaic, adhesive and grout are bought in advance and in sufficient quantity. Buying more during the job causes delays.
- The pattern is agreed in writing or drawn: with gradients and pictures this saves discussion on site and rearranging of sheets.
- Outlets and tray are ready: the water supply has been pressure-tested, the shower tray or channel drain is fitted. The bath is in place, or it is clearly agreed that it will be fitted after tiling and the tiler knows where its rim will be.
- Access and space: the area is cleared, the route for materials is free and there is room for cutting and mixing, ideally with access to water.
- Warmth and time to dry: adhesive, tanking and grout need normal room temperature. In the cold every stage takes longer.
- The shower is not used too early: the time before first use is given by the grout and silicone manufacturers. Showering too soon damages fresh joints.
Typical mistakes and how they show later
Fixing to an uneven substrate. The surface looks wavy over time. In raking light from a window or a light fitting every undulation shows and individual pieces stick out.
Missing or broken waterproofing in the shower. Water seeps through the joints into the wall. It shows as damp patches on the other side of the wall, mould or tiles coming away, often only after years.
Unsealed joint between bath and wall. Water runs behind the bath even though the silicone looks fine from outside. It shows as damp under the bath and mould in the corner.
Too much adhesive. It squeezes into the joints, later shows through or prevents proper grouting. The grout is then shallow and crumbles easily.
Unsuitable or poorly flattened adhesive under glass. Glass mosaic turns grey, has patches, or trowel ridges and voids show through. The repair means replacing the pieces.
Glass scratched during grouting. Hard tools or heavy pressure leave fine scratches on the glossy surface that cannot be removed.
Uneven gaps between sheets. They create a visible grid that shows where the sheets meet.
Unsealed stone. It absorbs coloured grout and is left with stains that cannot be cleaned off.
Grout washed off too late. The haze on glass is then very hard to remove, and with epoxy grout sometimes impossible.
Rigid grout in corners instead of silicone. Corners and bath edges move, so cracks form there and let water in.
Wrong fall in the shower substrate. Water does not run to the waste and stands in puddles. Dirt and mould then collect in the joints.
How to check the finished tiling
Inspect the tiling in raking light, for example with a torch held close to the wall. In a shower, run the water.
- the surface is flat in raking light, with no protruding pieces,
- joints are the same width within sheets and between them, with no visible grid,
- joints are full, with no pinholes or sunken areas,
- no grout haze or stains are left on glass or stone,
- the glass is not scratched and no adhesive, ridges or voids show through glass mosaic,
- no hollow spots can be heard when tapped,
- cuts around tap outlets, the waste and sockets are clean and covered by cover plates or escutcheons,
- corners and joints with the bath, shower tray or worktop are filled with silicone,
- in the shower, water runs to the waste and does not stand anywhere,
- stone mosaic is sealed and you have been told which cleaning products are suitable,
- you know when the shower can be used and you have spare sheets from the same batch.
DIY guide: mosaic kitchen splashback
A smaller dry area, such as a splashback between the worktop and wall units, can be tackled by a capable DIYer. A shower with tanking and a falling floor is better left to a tiler. Before starting, switch off the circuit for the sockets in the wall at the consumer unit. Have a qualified electrician remove and refit the sockets themselves.
Tools: spirit level and straightedge, small-notch trowel, flat trowel, rubber grout float, bucket and mixing paddle, sponge, sharp knife or scissors for the mesh, tile nippers. For glass mosaic, nippers designed for glass, or a hired wet saw. Wear safety glasses when cutting glass or stone, as fragments fly off and have sharp edges.
- Cover the worktop with masking tape and sheeting so it is not scratched or soiled.
- Degrease, level and prime the wall as described above.
- Rest the first row on the worktop on thin wedges or spacers. The gap is filled with silicone at the end, not grout.
- Where a full sheet does not fit, first cut the mesh between pieces with a knife. Only when whole pieces will not do, cut individual pieces with nippers.
- Around a socket, mark the opening on the sheet first, cut whole pieces out of the mesh and trim only the edge pieces. The socket faceplate then covers the opening.
- Mix adhesive in small batches and spread it over only two or three sheets at a time, so it does not skin over before the mosaic goes on.
- Press each sheet with your palm or tap it with the rubber float and check the gaps to neighbouring sheets straight away. Later it can no longer be moved.
- Once the adhesive has set, grout a small area, wash it and only then move on. This way the haze does not have time to harden. On glass, use a soft float and no pressure.
- When dry, polish off the haze with a dry cloth and fill the joint with the worktop with silicone.
Frequently asked questions
The guide labour price is €65.00 per m² of tiled area. When comparing quotes, look mainly at what the price includes. Tanking, wall levelling, removing old tiles and sealing are often charged separately. The factors in more detail are described in the price section above.
Often yes, if the old tiles are sound, flat and do not sound hollow when tapped. The surface is degreased and coated with a bonding primer. If the original tiles are coming loose or sit in a shower without waterproofing, it is better to remove them.
Stone does, otherwise it absorbs colour and dirt. Glazed ceramic and glass mosaic usually do not need sealing. Unglazed porcelain mosaic, especially matt mosaic on a shower floor, is often sealed if the manufacturer recommends it. With cement-based grout, sealing the joints makes later cleaning easier.
It depends on the area, the substrate and the pattern. Besides the laying itself, allow time for the levelling compound, tanking and adhesive to dry, so even a small shower usually takes several days.
Behind the hob and sink, yes, because epoxy resists grease better and is easier to keep clean. For parts of the splashback further from the cooker, cement-based grout is usually enough, possibly with a sealer. Where a seamless look is preferred, large format 60 × 120 cm tiles or even slabs of 120 × 260 cm are an alternative with far fewer joints.
Yes, but with care. Drill without hammer action, using a bit designed for tiles or glass, ideally into a joint. It is safer, however, to know the positions of shelves and brackets in advance so the holes can be planned before tiling.
Related work
How wall and floor tiles up to 60 cm are laid, what the substrate needs, which adhesive to choose, common mistakes and how to check the work.
How 60×120 wall and floor tiles are laid: preparing the substrate, adhesive, levelling clips, cutting, typical mistakes and checking the finished work.
How 120 x 260 cm tiles and slabs are laid, what the wall or floor underneath must be like, which tools are used and what to check at handover.
How wall and floor tiles are grouted, which grout to choose, the mistakes to avoid and how to check finished grout lines.
Where silicone belongs instead of grout, which type to choose, how to apply it neatly and how to check finished joints in bathrooms and kitchens.
How floor tiles are laid at 45°, when a diagonal layout is worth it, what makes the job harder and how to check the finished floor.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.