Large Format Tile and Slab Installation (120 x 260 cm)

Large format tile and slab installation (120 x 260 cm) means fixing slabs of over 3 m² to walls or floors. Labour costs roughly €102.00 per m². The price depends mainly on substrate flatness, getting the slabs on site and the number of cut-outs.

Updated 09/2026·11 min read·20 price list items
Standard labour price
€102.00/ m²
Indicative range
€81.60 - €132.60
60 m² flat
€15300.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Large Format Tile and Slab Installation (120 x 260 cm)

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Tiling20 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Wall and floor tiling cost

XXL format wall/floor tiling 120×260m²€102.00 / m²m²enter quantity-
Standard wall/floor tiling up to 60 cmm²€39.00 / m²m²enter quantity-
Porcelain tiling over 60 cmm²€49.00 / m²m²enter quantity-
XL format wall/floor tiling 60×120m²m²-
Mosaic tilingm²m²-
Natural/artificial stone / clinker tilingm²€59.00 / m²m²enter quantity-
Split face stone cladding (fences, plinth)m²m²-
Decorative strip / Listello tilinglm€2.50 / lmlmenter quantity-
Diagonal floor tiling up to 600 mmm²€45.00 / m²m²enter quantity-
Groutingm²€1.90 / m²m²enter quantity-
Silicone groutingm²€3.60 / m²m²enter quantity-
Siliconing internal corners and edgeslm€1.90 / lmlmenter quantity-
Microcement decorative coating 2-3 mmm²€80.00 / m²m²enter quantity-
Waterjet cutting 60×60 (mitred edge)lm€5.90 / lmlmenter quantity-
Waterjet cutting 120×120 (mitred edge)lm€7.90 / lmlmenter quantity-
Waterjet cutting - tile cut-outlm€10.50 / lmlmenter quantity-
Mitred edge (installation and fitting)lm€59.00 / lmlmenter quantity-
Skirting from tileslm€6.50 / lmlmenter quantity-
Cutting holes in tilespcs€12.00 / pcspcsenter quantity-
Core drilling holes in floor and porcelain tilespcs€12.50 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What XXL slabs are and why people choose them

Tiles or slabs in a 120 x 260 cm format are among the largest panels commonly installed today. A single slab covers more than 3 m², so a large section of wall or floor is covered with very few joints and the surface looks almost seamless. This format is popular in modern bathrooms, as kitchen splashbacks, in living areas and in large hallways. The work is very different from ordinary tiling services. The slabs are heavy, fragile when bent, and do not tolerate an uneven substrate or an inaccurate cut.

The main reason is appearance. On a wall around 2.6 metres high, one slab can run from floor to ceiling without a single horizontal joint. With a marble or concrete effect, the wall looks like one piece of stone.

  • Fewer joints: fewer places for dirt and limescale to collect, and easier cleaning.
  • A calm surface: the room feels larger and more open because there is no grid of grout lines.
  • Wide range of uses: walls and floors, bathrooms, kitchens and living spaces, as well as worktops, furniture panels or cladding for a kitchen island.

For outdoor use, always check whether the manufacturer approves the specific slab for external use and under what conditions. Not every large format slab is frost resistant, and external substrate build-ups are more demanding.

What needs deciding before you place an order

With standard tiles, many details can be adjusted as the job progresses. With a slab 260 cm long, that is not possible. Most decisions have to be made in advance, ideally together with the tiler before the slabs are bought.

  • Will the slabs fit into the property? A 260 cm slab may not fit in a lift or get round a turning staircase, a narrow corridor or a bathroom doorway. It is carried on edge in a transport frame, so measure the whole route from the vehicle to the room, including every corner. If it will not fit in the lift, it has to be carried up the stairs, which needs more people and wide enough flights. If even that is not possible, the slabs can be cut to a smaller size before they are brought in, or a different format can be chosen.
  • Where the outlets will be: once the joint layout is drawn up, water or electrical outlets are often moved so they do not fall on the edge of a slab. Such changes must be made before tiling, not during it.
  • What happens to the substrate: whether old tiles will be removed, whether walls will be skimmed or a plasterboard stud wall built, and whether the floor needs levelling with self-levelling compound.
  • Pattern matching: whether the marble veining should flow continuously from slab to slab, or whether standard laying is enough. This affects how many slabs need to be bought.
  • Electrics and plumbing: moving sockets and switches is a job for a qualified electrician, not the tiler. A new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. A plumber moves water outlets before waterproofing.

How XXL slabs are installed step by step

This is not a DIY job. A 120 x 260 cm slab weighs around 45 kg at 6 mm thick and around 90 kg at 12 mm. Lifted incorrectly, it breaks easily. A tiler's process typically looks like this:

  1. Checking and preparing the substrate. Walls and floors must be flat, sound, dry and clean. Flatness is checked with a long straightedge, not just a spirit level. For large formats, the deviation under a 2 m straightedge is commonly required to be no more than about 2 mm. The exact tolerance is given by the slab manufacturer. Irregularities are corrected with a levelling compound or self-levelling screed, then a primer suited to the substrate is applied.
  2. Waterproofing. In the shower and around the bath, a liquid waterproofing membrane goes under the tiles, with reinforcing tape in the corners and sealing collars around pipe penetrations.
  3. Setting-out plan. Before the first cut, the joint positions are drawn up, including how they fall around doors, windows, recesses and switches. With slabs this size, there is no way to simply make up the difference at the end.
  4. Inspecting the slabs. Before cutting, the slabs are checked for damaged edges or hairline cracks from transport, and to confirm they all come from the same batch.
  5. Handling and cutting. Slabs are moved on a transport frame with vacuum suction lifters. Straight cuts are made on a long rail cutter, and holes for taps and sockets with diamond core bits, ideally wet.
  6. Fixing. A flexible cement-based adhesive suitable for large formats and classified to BS EN 12004 is used, usually class C2 with deformability classification S1 or S2. The adhesive is applied both to the substrate and to the back of the slab, known as back-buttering, so no voids remain underneath. On the substrate it is spread with a notched trowel, for large formats often with notches of around 10 to 12 mm, and a thinner layer goes on the back of the slab.
  7. Bedding and levelling. Once placed, the slab is pressed firmly into the adhesive. For XXL formats a vibrating suction tool or other vibration device is normally used to spread the adhesive evenly and push out trapped air. A levelling clip and wedge system keeps neighbouring edges flush.
  8. Grouting and flexible sealing. Once the adhesive has cured, usually the next day at the earliest and later with slower-setting adhesives, the joints are grouted with a grout classified to BS EN 13888, such as CG2. Internal corners, the floor-to-wall junction and the area around the bath are sealed with flexible silicone, not grout.
  9. Cleaning. Adhesive and grout residues are removed during the work. Later they are hard to get off, and the surface is easily damaged in the process.

Cost of large format slab installation 120 x 260 cm per m²

The guide labour price is €102.00 per m². However, the difficulty can vary greatly for the same square metre. The final price depends mainly on:

  • Condition of the substrate: a flat, new wall needs far less work than an old bathroom in an ageing block of flats or original plaster in an older house. Stripping old tiles, skimming or levelling floors are usually charged as separate items and can increase the total considerably where the substrate is poor.
  • Carrying the slabs: using the stairs instead of a lift means more people and more time. On upper floors without a lift, this adds noticeably to the cost.
  • Number of holes and cut-outs: every socket, water outlet, window reveal or recess means a precise cut and a risk of breaking the slab. A bathroom with many cut-outs costs more per m² than a plain living room wall.
  • Shape and size of the area: a large flat wall goes quickly, a small bathroom with many corners and slopes is slow. On small areas, the time for preparation, transport and setting up the cutter is spread over only a few square metres.
  • Wall or floor: floors need thorough back-buttering with no voids and often a fall towards the drain, which slows the work.
  • Pattern matching: both laying and cutting take longer, and wastage increases.
  • Underfloor heating: the screed must be dry and put through a documented heating-up cycle before tiling, otherwise cracks may appear. If the screed needs correcting, there is extra work.
  • Additional work: waterproofing, trims, 45° mitred edges, tiling a niche or a kitchen island are usually priced separately.

When comparing quotes, check exactly what the price per m² covers: fixing only, or also substrate preparation, waterproofing, grouting, silicone and carrying the slabs into the property. For smaller formats, see tiling and paving installation up to 60 cm or large format tiles 60 x 120 cm.

What you can prepare

A smooth job depends largely on organisation on site. It helps if:

  • in a block of flats, the date and method of carrying the slabs have been agreed in advance with the managing agent or building management, along with a place to park near the entrance,
  • the slabs are delivered only once the substrate is ready, and are stored upright on edge in a rack or leaned against a flat wall, not laid flat on an uneven floor,
  • there is a clear cutting area where a whole slab and the cutter can be laid out, meaning a space longer than 2.6 m, such as a living room or hallway,
  • water and electricity are available for wet cutting and mixing adhesive,
  • the electrician and plumber have finished and tested their work before the tiler starts,
  • the bath, shower tray, concealed WC frames and concealed valves are fitted, or you have accurate drawings of their positions,
  • the room is kept at a steady temperature, free from draughts and frost, because adhesive cures slowly in the cold.

On the other hand, the job takes longer if the choice of slabs changes during installation, if decisions about the position of taps or the basin are still open, or if slabs arrive from different batches.

Common mistakes with large formats

Several problems come up again and again in practice, and years later they show as a cracked slab or a hollow sound when tapped.

Adhesive on the substrate only

With a surface this large, air pockets remain under the slab. On a floor, the slab then cracks under load, for example beneath a bath foot or when something heavy is dropped.

Underestimating flatness

A slight undulation in a wall disappears with a standard tile, but with a 260 cm slab it creates a visible lip at the edges. Under side lighting from a window or downlights, every irregularity shows.

Missing movement joints

Large areas and junctions with other materials need flexible movement joints. Without them, stresses transfer into the slabs, which eventually crack or come loose.

Joints too narrow

Manufacturers usually recommend a minimum joint width, often around 2 mm. A butt joint may look striking, but it leaves no room for movement and the edges can chip.

Incorrect lifting

A slab carried flat without a frame bends and cracks before it is even laid. The hairline crack is sometimes not visible straight away and only appears after fixing.

Cut-out too close to the edge

A hole for a tap or socket right next to the edge weakens the slab. A crack often appears weeks later with a change in temperature.

Rushed grouting

Grouting should be done only after the adhesive has cured according to the manufacturer's instructions, not straight after laying. Otherwise the joints may vary in colour or crack.

Poor waterproofing

If the shower is missing the membrane, corner tape or a collar around the outlet, water gets behind the tiles. The result is damp walls, mould or leaks into the flat below, and the repair means removing large, expensive slabs.

What to look out for when choosing slabs

Large format slabs are made in various thicknesses. Thinner slabs are lighter and suit walls or furniture cladding in particular, while thicker ones are more often recommended for floors. For fine detail in shower niches or feature areas, mosaic tiling can be combined with large slabs. When choosing, it is worth checking:

  • whether the manufacturer approves the slab for floors, walls or external use,
  • the slip resistance of the surface, if it is for a bathroom floor,
  • with polished surfaces, that every irregularity and scratch will show,
  • the allowance for cutting and possible breakage, which should be somewhat larger than for standard tiles, and larger still with pattern matching,
  • whether all slabs come from the same batch, so there is no difference in shade,
  • whether the supplier will still stock the slabs later, in case one needs replacing.

How to check the finished work at handover

Inspect the finished tiling in daylight and also with a lamp held to the side, which reveals irregularities. At handover, it is worth going through this list:

  • edges of neighbouring slabs are flush, with no noticeable lips,
  • slabs do not sound hollow when tapped, especially on the floor and in corners,
  • joints are an even width and filled along their whole length,
  • joints are positioned according to the agreed plan and the pattern continues as agreed,
  • internal corners, the junction with the shower tray and the area around the bath are sealed with flexible silicone,
  • movement joints are where they were agreed and are not filled with rigid grout,
  • cut-outs for taps, sockets and outlets are clean, with no chipped edges,
  • water on the shower floor runs to the drain and does not pool anywhere,
  • the surface is clean of adhesive and grout residues,
  • there are no visible cracks or scratches,
  • you have been told which adhesive and grout were used, when the surface can take load and when underfloor heating can be switched on.

Frequently asked questions

The price list gives €102.00 per m² for installation alone. The final total rises with a poor substrate, carrying slabs up stairs, many cut-outs and corners, and additional work such as waterproofing or levelling.