Tiling and Paving Installation up to 60 cm

Tiling up to 60 cm means fixing standard wall and floor tiles from 20×20 to 60×60 cm, including cuts and grouting. It costs roughly €39.00 per m², depending mainly on the substrate, the cuts and the laying pattern.

Updated 09/2026·12 min read·20 price list items
Standard labour price
€39.00/ m²
Indicative range
€31.20 - €50.70
60 m² flat
€5850.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Tiling and Paving Installation up to 60 cm

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Tiling20 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Wall and floor tiling cost

Standard wall/floor tiling up to 60 cmm²€39.00 / m²m²enter quantity-
Porcelain tiling over 60 cmm²€49.00 / m²m²enter quantity-
XL format wall/floor tiling 60×120m²m²-
XXL format wall/floor tiling 120×260m²m²-
Mosaic tilingm²m²-
Natural/artificial stone / clinker tilingm²€59.00 / m²m²enter quantity-
Split face stone cladding (fences, plinth)m²m²-
Decorative strip / Listello tilinglm€2.50 / lmlmenter quantity-
Diagonal floor tiling up to 600 mmm²€45.00 / m²m²enter quantity-
Groutingm²€1.90 / m²m²enter quantity-
Silicone groutingm²€3.60 / m²m²enter quantity-
Siliconing internal corners and edgeslm€1.90 / lmlmenter quantity-
Microcement decorative coating 2-3 mmm²€80.00 / m²m²enter quantity-
Waterjet cutting 60×60 (mitred edge)lm€5.90 / lmlmenter quantity-
Waterjet cutting 120×120 (mitred edge)lm€7.90 / lmlmenter quantity-
Waterjet cutting - tile cut-outlm€10.50 / lmlmenter quantity-
Mitred edge (installation and fitting)lm€59.00 / lmlmenter quantity-
Skirting from tileslm€6.50 / lmlmenter quantity-
Cutting holes in tilespcs€12.00 / pcspcsenter quantity-
Core drilling holes in floor and porcelain tilespcs€12.50 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What standard wall and floor tiling includes

This item covers standard fixing of wall tiles or floor tiles where the longer side does not exceed about 60 cm. Typical sizes are 20×20, 30×30, 30×60 and 60×60 cm. This work comes up in bathroom, kitchen, hallway and WC refurbishments as well as in new builds. Most tiles in ordinary homes fall into this category. For an overview of the whole trade, see tiling services.

Standard tiling means fixing tiles in adhesive to a prepared, flat substrate, with even joints and grouting afterwards. The tiler cuts tiles around corners, switches, pipes and the waste outlet, and makes sure the surface is flat and the joints line up neatly. Wall tiling should follow the BS 5385 code of practice, with the background prepared and the adhesive chosen to suit the tile size and weight.

Standard tiling does not usually include extensive levelling of uneven walls, removing old tiles, tanking, complex patterns, diagonal laying, mosaic tiling or large-format tiles such as XL wall and floor tiles 60×120 and large-format slabs of 120 x 260 cm. These are normally priced as separate items. Before agreeing terms with the tiler, clarify exactly what the price per square metre includes.

What to decide before the tiler starts

Many things cannot be changed once tiling is under way. When a tile has been fixed, any change means chiselling it off. It pays to have these questions settled in advance:

  • Type of tile: for bathroom and hallway floors, choose tiles with an anti-slip finish. Whether a tile is rectified also determines the joint width (more detail in the materials section below).
  • Laying pattern: grid, offset or diagonal. With 30×60 cm rectangular tiles, a half offset is often requested. However, many tiles are slightly bowed, and with a half offset the highest point of one tile meets the lowest point of the next, creating lipping. Manufacturers therefore usually recommend an offset of no more than one third of the length.
  • Tiling height: whether the tiles go up to the ceiling or only to a certain height, and where they finish. Finishing halfway through a tile looks worse than finishing on a full row.
  • Corners and edges: plastic or metal trims, or mitred 45-degree cuts. A mitred edge without a trim looks more refined, but takes more work and the edge is more vulnerable to knocks.
  • Position of sanitaryware and outlets: basin, WC, taps, switches and sockets. In a well set-out layout, an outlet sits in the middle of a tile or in a joint, not right at a tile edge.
  • Shower with or without a tray: a level-access shower or wet room needs a fall to the drain, usually around 1 to 2 %, and the position of the drain or linear channel must be decided before the screed is laid.
  • Underfloor heating: a heated screed must be dry and must have gone through a proper heating-up cycle. A flexible adhesive should be used over underfloor heating.
  • Colour of grout and silicone: materials are ordered accordingly. The silicone should match or closely match the grout colour.

A sketch, or at least a conversation with the tiler on site, also helps. An experienced tiler can tell you where the first row will start and how the cuts will fall at the bath, door and window.

How tiling is done step by step

  1. Checking the substrate. The tiler checks flatness with a straightedge, as well as the strength and dryness of the surface. Dust, grease and old adhesive residue are removed.
  2. Priming. Primer evens out the absorbency of the substrate and improves adhesion. Without it, an absorbent background can draw water out of the adhesive too quickly.
  3. Tanking in wet areas. A liquid tanking membrane is applied in the shower, around the bath and on the bathroom floor. Sealing tapes go into corners and sealing collars around pipe penetrations.
  4. Setting out. Before fixing, the tiler plans where the first row starts, so there are no thin slivers at the edges and the wall and floor joints line up. On walls, tiling often starts from the second row on a batten, and the bottom row is fixed last, once the floor level is known.
  5. Fixing. Adhesive is spread with a notched trowel over small areas at a time. With larger tiles, adhesive is also applied to the back of the tile (back-buttering) so no voids remain underneath. Flatness is checked continuously, and a tile levelling system helps with larger formats.
  6. Grouting. Once the adhesive has set, usually after one day depending on the manufacturer, the joints are filled with grout and the surface is cleaned.
  7. Silicone. Internal corners, the wall-to-floor junction and the edges around the bath and shower tray are not grouted but sealed with flexible sanitary silicone.

Substrate, adhesive and joints: what to choose

Tile adhesives are classified under BS EN 12004-1, the standard for tile adhesives. C1 means a standard cementitious adhesive, C2 an adhesive with improved adhesion. S1 indicates that the adhesive is flexible, meaning it can tolerate small movements in the substrate. Over underfloor heating, plasterboard, existing tiles or with 60×60 cm tiles, a flexible C2 S1 adhesive is normally chosen.

The trowel notch size depends on the tile format. Smaller wall tiles need only a small notch, while tiles around 60 cm usually call for a notch of roughly 8 to 10 mm. The aim is for the adhesive to cover almost the entire back of the tile, especially on floors and in showers. With an 8 to 10 mm notch, consumption is roughly 3 to 4 kg of dry adhesive powder per m², slightly more with back-buttering. The exact consumption is stated by the manufacturer on the bag.

Joint width depends on the tile. Rectified tiles with ground edges allow narrow joints of around 2 mm, non-rectified tiles need wider ones. Bathroom grout should be water and mould resistant, ideally a grout classified to BS EN 13888 as CG2, and epoxy grout is sometimes chosen for showers. Grout consumption is low with narrow joints and larger formats, in the order of a few hundred grams per m², and increases with wider joints and smaller formats.

Floor tiling also needs movement joints. A gap is left around the perimeter of the room at the walls, later covered by skirting or silicone. Larger areas are divided into bays by movement joints, roughly for areas over about 20 to 25 m² or lengths over 5 to 6 m, and always wherever the screed has a movement joint, typically under a door threshold.

Not every floor needs a sealer after laying. Glazed tiles and standard porcelain normally do not. Sealing makes sense for absorbent materials such as natural stone, or for the grout joints themselves.

What affects the price

The guide price for labour is €39.00 per m². The simplest job is a large, flat area with no obstacles, square tiles and a grid pattern. The further the actual job departs from this, the higher the final cost:

  • Condition of the substrate: uneven or mixed walls that need levelling first are charged as separate work. Even with smaller irregularities, the tiler makes up the difference in the adhesive bed, which slows the work and increases adhesive consumption.
  • Number of cuts: many cuts around the bath, bathroom furniture, pipes and switches add considerably to the time. A small room with lots of corners, where much is cut and little is laid, can cost noticeably more per m² than a large hallway.
  • Size of the area: with a small WC or a few metres of splashback behind kitchen units, preparation and clean-up time is spread over very few metres, so tilers often charge a higher rate or a minimum call-out charge.
  • Laying pattern: an offset pattern takes slightly more work than a grid, while herringbone or diagonal laying takes considerably more and also increases cutting waste.
  • Edges and details: trims, corner profiles and mitred 45-degree cuts instead of trims. Mitred cuts are among the most labour-intensive details.
  • Material: hard material that is difficult to cut and drill, such as thick porcelain, slows the work. Larger tiles around 60×60 cm take longer to bed flat and require back-buttering.
  • Walls versus floors: tiling to full height, above a bath or in a tight space behind a WC takes longer than a flat floor.
  • Related work: removing old tiles, tanking, levelling the substrate, forming a fall to a drain or channel and silicone sealing may be quoted separately. When comparing quotes, it is important to know what each one includes. In homes built before 2000, have suspect materials tested before you drill or demolish, as asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.

What makes the work easier and what slows it down

Apart from the area itself, organisation makes a big difference. The work goes faster when:

  • all materials are on site before the start, in full quantity and from a single batch, so there is no waiting for a top-up order in a different shade,
  • sanitaryware has been chosen and ideally bought, meaning the bath, shower tray, drain, WC and taps, so the tiler knows the exact dimensions,
  • water, waste and electrical first fix is complete and outlets are set at the correct height,
  • the room has been cleared and there is access to water and electricity in the property,
  • the room temperature is suitable for cementitious adhesives, usually between 5 and 25 °C, with no draughts or direct sunlight on fresh adhesive,
  • it has been agreed where materials are stored and where cutting can take place, because cutting creates dust and wet cutting uses water.

The work takes longer when the tile choice, tap positions or tiling height change during the job, when there is a wait for the plumber, or when a new screed or plaster has not yet dried. Tanking and adhesive both need time to cure, so a bathroom is rarely finished in one or two days, even when the area is small.

In a block of flats, it is worth informing the managing agent or residents in advance about noisy work. Replacing tiles on its own is not usually a building alteration. However, if pipework is being moved, risers are affected or load-bearing walls are involved, check the procedure with the managing agent or freeholder and with building control. A new circuit, a consumer unit replacement or electrical work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start.

Common mistakes and how they show up later

  • Dot-and-dab fixing on a few blobs of adhesive: voids remain under the tile, which can crack over time, especially on floors under load or when something heavy is dropped. It sounds hollow when tapped.
  • No tanking in the shower: water penetrates the grout joints into the wall. It only shows months later as damp patches, mould or flaking plaster on the other side of the wall or in the ceiling of the flat below.
  • Grout in corners instead of silicone: cracks then form in the corner, letting in water and dirt.
  • Missing movement joints on larger areas, around the perimeter and under door thresholds: when the substrate moves or the heating is on, tiles can debond, lift or crack.
  • Grouting before the adhesive has set: tiles can shift and the grout often ends up patchy in colour or crumbles.
  • Poor fall in a level-access shower: water ponds instead of draining, and limescale and mould build up in the joints.
  • Half offset with bowed tiles: lipping forms on the floor, catching the foot and clearly visible in side light.
  • Poor setting out: wall joints do not line up with the floor, or cut pieces end up in a visible corner or by the door. This is not a defect, but the appearance cannot be corrected without retiling.
  • Unsuitable adhesive over underfloor heating or plasterboard: without a flexible adhesive, tiles can come loose as the substrate moves.

Laying floor tiles yourself: a guide for DIYers

A smaller floor without a shower is within reach of a patient DIYer with basic tools. You will need a notched trowel, a spirit level, a straightedge, spacers or levelling clips, a tile cutter and a rubber grout float.

  1. Check the flatness of the substrate with a two-metre straightedge and level out any unevenness.
  2. Vacuum the substrate and apply primer according to the manufacturer's instructions.
  3. Lay the tiles out dry and choose the starting point so there are no thin slivers at the edges.
  4. Stretch a string line or mark a line for the first row.
  5. Mix the adhesive according to the instructions, leave it to stand briefly and mix again.
  6. Spread adhesive with the notched trowel over an area for one or two tiles. Only spread as much as can be laid within the adhesive's open time stated by the manufacturer. If a skin has formed on the adhesive, scrape it off and apply fresh adhesive.
  7. With larger tiles, also spread a thin layer of adhesive on the back of the tile.
  8. Place the tile, slide it slightly and press it down, then insert spacers or clips.
  9. Keep checking flatness with the spirit level and remove adhesive from the joints.
  10. Once the adhesive has set, remove the clips and grout the area.
  11. Wipe off grout residue with a damp sponge and, once dry, buff with a dry cloth.
  12. Seal the wall-to-floor junction with silicone.

Shower tanking and tiling to a fall into a drain are better left to an experienced tiler. Wear safety glasses and a dust mask when cutting and grinding tiles.

How to check the finished work

The handover is best done in daylight, with a torch shone at a low angle across the surface. This makes unevenness and lipping easier to see. Check that:

  • the surface is flat, with no gap under a two-metre straightedge larger than roughly 2 to 3 mm as a rule,
  • adjacent tiles have no lipping you can feel with a finger,
  • the joints are of equal width, straight and fully filled,
  • the setting out matches what was agreed, wall and floor joints line up, and cut pieces are in less visible places,
  • there is no hollow sound when tapping, which would indicate voids under the tile,
  • edges and cuts around pipes and switches are clean, without chips,
  • corners, trims or mitred edges are straight and the edges are not chipped,
  • corners and junctions with the bath or shower tray are sealed with silicone,
  • a perimeter movement gap has been left around the floor and larger areas have movement joints,
  • water in the shower drains to the outlet and does not pond anywhere,
  • doors open without catching on the new floor,
  • the surface has been cleaned, with no grout haze,
  • you have a few tiles left from the same batch for future repairs.

Frequently asked questions

The guide price is roughly €39.00 per m². The final cost is driven mainly by substrate levelling, a large number of cuts, a small area, offset or diagonal laying and mitred 45-degree cuts. Tanking and removing old tiles are usually charged separately.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.