Building work price list: Installation of PVC Corner Beads
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Insulation cost | ||||
| Install PVC corner bead | lm | €1.90 / lm | lm | enter quantity- |
| External wall insulation with polystyrene (full adhesive bond and anchoring) | m² | €25.00 / m² | m² | enter quantity- |
| External wall insulation with mineral wool (inc. fixings) | m² | €28.00 / m² | m² | enter quantity- |
| Install ETICS system up to 20 cm | m² | €13.00 / m² | m² | enter quantity- |
| Window reveal insulation (XPS) | lm | €3.00 / lm | lm | enter quantity- |
| Ceiling/loft insulation | m² | €10.00 / m² | m² | enter quantity- |
| Vapour barrier installation | m² | €4.00 / m² | m² | enter quantity- |
| Thin-coat external render (scraped 2 mm) | m² | m² | - | |
| Apply fibreglass mesh to walls + adhesive | m² | m² | - | |
| Install APU bead with mesh | lm | €0.90 / lm | lm | enter quantity- |
| Window head drip bead | lm | €2.50 / lm | lm | enter quantity- |
| Sprayed foam insulation (closed cell) | m² | m² | - | |
| Sprayed foam insulation (open cell up to 25 cm) | m² | m² | - | |
What a PVC corner bead does and when it is needed
Corner beads are most often fitted during building insulation work. On external wall insulation they are set into the reinforcing basecoat over the insulation boards. They are also used with new render inside or outside, and on window and door reveals.
A wall corner takes more knocks than any other part of the wall: bags, bicycles, lawnmowers, ladders. Render or basecoat alone would soon break away on a sharp arris. The bead reinforces and protects the edge.
The second job is less visible. Two surfaces meet at a corner, and stress builds up in the render there, for example as the wall heats up and freezes. A bead with mesh spreads this stress into the surrounding area, so the corner does not crack.
The third reason is appearance. A long, straight, crisp arris is very hard to form by hand. The bead defines it, and the plasterer uses it as a screed guide.
PVC does not rust and copes well with moisture. That is why it is used on façades and in insulation systems more often than metal angle beads. Outside, metal beads can eventually cause rust stains that bleed through the render.
Which beads to choose and what to decide before starting
The bead is chosen according to where it goes and how much wear the corner will take. Two or three types of profile are commonly used on one house.
- PVC corner bead with glass fibre mesh has a strip of mesh bonded to both wings. It is the usual standard for ETICS (external thermal insulation composite systems), whether the system uses fully bonded polystyrene boards or mineral wool slabs bonded and mechanically fixed. The mesh is lapped into the mesh across the whole façade, so the corner becomes part of the reinforcing layer.
- PVC corner bead without mesh has perforated wings only. It protects the arris and helps keep it straight, but does not reinforce the area around the corner. It suits internal plastering and corners that take little wear. It is not suitable for insulation systems.
- Adjustable angle bead is used on corners that are not at a right angle, for example splayed reveals or bay windows.
- Drip bead is fitted on underside edges, such as above windows or on balcony soffits. Water drips off it instead of running down the wall.
- Movement joint profiles are not fitted on every corner. They belong where different materials meet or where the design specifies them, so that structural movement is not transferred into the render.
On an insulation system, use the profiles listed in the system manufacturer's technical documentation. The system is tested as a whole, and randomly combined components can weaken its durability. If your external wall insulation is grant-funded, the installer must be certified to PAS 2030:2023 and registered with TrustMark, and the system should hold a third-party certificate (e.g. BBA).
Before ordering, it is worth deciding the following:
- Which edges get a bead. Usually all external corners of the house, the vertical edges of window and door reveals and the edges of recessed balconies. Above windows and on balcony soffits, decide whether a drip bead will be used.
- How it will be measured. Installation is priced per running metre, meaning the length of the edge. Add up the height of all corners and the perimeter of the reveals that get a bead. When comparing quotes, ask whether the beads are included in the insulation price per m² or charged separately.
- Who supplies the materials. If buying the profiles yourself, check that they belong to the same insulation system as the adhesive, mesh and render.
- Flats. In a block of flats, the external walls are usually a shared part of the building. Decisions about them are made by the freeholder, the management company or the residents' association, depending on the lease. If the whole building is being insulated, check the Planning Portal before work starts: residential permitted development rights only apply to houses, so a block of flats will usually need planning permission for an external alteration, and building regulations approval may still be required.
How to fit a corner bead step by step
The method differs depending on whether the bead goes into an insulation system or into traditional render. In every case, it needs a straight, sound substrate, accurate fixing and enough time to cure.
On external wall insulation (ETICS)
- The insulation boards must be bonded, fixed and rasped flush at the corner. There should be no steps or gaps along the edge.
- At windows and doors, the window connection profile is first bonded to the frame. The corner bead on the outer edge of the reveal then ties in with it.
- A layer of adhesive basecoat is applied to the corner, as wide as the bead wings.
- The bead is pressed into the basecoat. The nose of the profile must follow the line of the corner exactly. At the bottom, the bead meets the starter track, and its mesh laps over the mesh of the starter track.
- Each length is checked with a spirit level or straightedge, and long corners also with a plumb line.
- The mesh on the bead is trowelled into the basecoat with no air pockets or creases.
- Diagonal mesh patches are placed at the corners of window and door openings to take the stress from the corner of the opening.
- The main façade mesh laps over the bead mesh by the overlap stated by the system manufacturer, usually around 10 cm.
- The whole surface is skimmed with basecoat and left to cure before primer and render are applied. More detail on the full build-up is in the guide to installing an ETICS system up to 20 cm.
On traditional render or plaster
- Absorbent backgrounds, such as aerated concrete blocks, are primed and the corner is cleaned of dust.
- Dabs of mortar are applied to the masonry. Inside, gypsum plaster or render mortar is used; on a façade, only render mortar intended for external use. Gypsum does not belong outside, because moisture breaks it down.
- The bead is pressed into the dabs and set plumb with a straightedge or spirit level.
- The mortar is left to set so the bead does not move during rendering.
- The corner is rendered, and the render on both walls is ruled off using the bead as a guide.
The thickness of the layer under the bead must match the render thickness, otherwise the corner ends up with a bulge or a dip.
Joining lengths
If the corner is longer than one bead, the lengths are butt-jointed, with no gap and no overlap. The mesh at the joint should overlap so the reinforcement is continuous.
Corner bead installation price per running metre and what affects it
The guide labour price is €1.90 per running metre. It applies to a straight, long corner on a prepared substrate. The final cost depends mainly on the following:
- Complexity of the elevations. A house with a simple footprint has a few long corners. Many windows, balconies, bays and reveals mean lots of short lengths, cuts and joints. A short reveal takes much more work per metre than a long house corner, so the price per running metre rises noticeably on complex façades.
- Height and access. At ground floor level, a ladder or small tower is enough. A taller house needs scaffolding to full height, and work from it is slower. If scaffolding is not already up for other work, erection and hire are charged separately and form a significant cost for the beads alone.
- Condition of the substrate. During renovation, the old render at the corner may turn out to be hollow or damp. It must first be removed and repaired. This is separate work beyond fitting the bead.
- Type of bead. Mesh beads and drip beads need more precision than a simple internal bead. Adjustable angle beads for splayed corners take even more work.
- Materials. System profiles from the insulation manufacturer are usually dearer than generic ones, but they are matched to the rest of the system. When comparing quotes, check whether materials are included.
- Combining with other work. When beads are fitted as part of a full insulation job, the contractor already has scaffolding and materials on site and the work follows on smoothly. Ordering a few metres of beading on its own is relatively expensive, because the tradesperson has to attend, mix the material and wait for it to set for a small job.
What speeds up corner bead installation and what holds it up
- Insulation rasped before the tradesperson arrives. If the beads are fitted at a different stage from the board fixing, the corners should be rasped and brushed down. Otherwise the job starts with rasping and dust.
- Clear access to the corners. Shrubs, plant pots, tools and cars by the wall should be moved beforehand. There must be room around the house for a ladder or scaffolding.
- Water and power on site. Mixing the basecoat needs water and electricity for the mixer. Without them, the tradesperson loses time.
- Windows and sills already fitted. Reveal beads go on only after the windows are installed. Replacing windows later means partly breaking out the reveal.
- Profiles agreed in advance. When it is clear beforehand where drip beads and movement joints go, nothing has to be added afterwards.
- Weather. In cold, rain or strong heat, work stops and materials dry differently. Allow for this when booking and leave some slack in the programme.
Typical mistakes and how they show up later
- Bead on a dusty or friable substrate. The basecoat does not bond and the bead eventually comes away. A hairline crack appears along the arris, letting water in.
- Crooked corner. A deviation of a few millimetres is clearly visible on a long corner after rendering, especially in raking light. Putting it right means breaking it out.
- Broken mesh continuity. If the bead mesh does not lap into the main mesh or the starter track mesh, a weak point forms. Cracks usually appear there after the first winter.
- Missing diagonal patches at windows. Diagonal cracks eventually appear from the corners of windows and doors.
- Gaps and overlaps at joints. A gap cracks, an overlap creates a step.
- Gypsum plaster on a façade. Outside, gypsum gets damp, loses strength, and the bead and render start to come loose.
- No drip bead above openings. Water runs from the head over the reveal and window, leaving streaks and dirty stripes on the façade.
- Mismatched components. A bead that does not belong to the insulation system used may not work with the other layers, and can cause problems with the system guarantee if a claim is made.
- Rushing. Further coats on uncured basecoat can shift the bead. Rain or frost shortly after fitting disrupts curing. Manufacturers usually state a suitable temperature range of about +5 °C to +25 °C and recommend protecting fresh surfaces from rain and direct sun.
How to check the finished work
Corners are best inspected before the final render, when faults are easy to correct. Go through these points:
- the arris is straight along its full height - check with a straightedge or plumb line,
- looking along the wall at an angle, there are no waves, bulges or hollows,
- the bead does not sound hollow when tapped and does not move when pressed,
- joints between lengths are tight, with no gaps or steps,
- the mesh is fully embedded in the basecoat and does not stick out or ripple anywhere,
- the main mesh laps over the bead mesh with an adequate overlap,
- at the bottom the bead meets the starter track, and at windows the connection profile, without gaps,
- diagonal mesh patches are in place at window and door corners,
- underside edges above openings have a drip bead where the design requires one,
- windows, sills and frames are free of basecoat splashes,
- the running metres on the invoice match the actual length of corners and reveals.
DIY guide: fitting a bead on a low corner
Fitting beads yourself makes sense indoors or on a small building where the work is done from the ground, such as a garage or garden building. Leave the façade of a house and any scaffold work to the contractor doing the rest of the insulation.
- Get the beads, adhesive basecoat, trowel, spirit level and a knife for cutting plastic ready.
- Rasp the corner of the insulation with a rasping board and brush off the dust. For render on masonry, prime absorbent backgrounds.
- Measure the length and cut the bead. At a window corner, cut the plastic profile exactly to the corner of the opening and let the mesh run past the corner so it laps with the bead mesh on the adjoining edge. This way the plastic profiles do not cross and the reinforcement stays continuous.
- Mix the basecoat according to the instructions on the bag.
- Spread basecoat on both sides of the corner, as wide as the bead wings.
- Press the bead in, line it up with the spirit level and trowel the mesh into the basecoat.
- Scrape off excess basecoat so no lumps form on the arris.
- Place diagonal mesh patches at the corners of openings.
- Leave to dry according to the manufacturer's instructions before continuing with the main mesh.
Frequently asked questions
The guide price is €1.90 per running metre. Expect to pay more on a complex façade with many short reveals, for work from scaffolding, for drip beads and for a small job ordered on its own.
On a low building where the work is done from the ground, and indoors, a competent DIYer can manage it. On a house façade, the beads are part of the insulation system and the work is done from scaffolding. Mistakes only show up over time and are difficult to repair, so leave this to the contractor carrying out the insulation.
On an insulation job, beads are not fitted all at once but progressively as each wall is basecoated. Their time is therefore hard to separate from the whole reinforcing layer. The duration depends on the number of corners and reveals, the weather and the curing time. Ask the contractor for a specific programme.
Not without disturbing the finished render. The bead belongs under the render, in the basecoat or mortar. If it was forgotten, the corner has to be opened up, the bead fitted and the corner re-rendered, which is more work than doing it in the right order.
Yes. The damaged section can be cut out, a new length of mesh bead fitted with an overlap onto the existing reinforcement, and the corner basecoated and rendered again. However, the repaired area may differ slightly from the rest of the façade in colour or render texture.
The beads themselves need no maintenance, as they are hidden under the render. It is enough to inspect the façade corners once a year, ideally in spring. If a crack or flaking is found, have it repaired before water starts getting in.
Related work
How external wall insulation with fully bonded polystyrene boards is installed, which materials to choose, what to avoid and how to check the finished work.
How mineral wool external wall insulation is bonded and anchored, when it makes sense, what complicates the job and how to check the result.
How external wall insulation (ETICS) up to 20 cm is installed, when to choose EPS or mineral wool, and how to check the finished facade.
How window reveals are insulated with XPS boards, which thickness fits, how to join the insulation to the frame and facade, and what to avoid.
How a 2 mm scraped exterior render is applied, which type to choose, what makes the job harder and how to check the finished facade.
How a window head drip bead is fitted on an insulated façade, which type to choose and how to stop rainwater running back into the window reveal.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.