Price list 2026 · Europe

Installation of External APU Bead with Mesh

An APU bead with mesh is a plastic profile bonded to a window or door frame during external wall insulation so the render does not crack at the frame. Guide price: €0.90 per running metre, mainly affected by corners, access and frame condition.

Updated 09/2026·11 min read·13 price list items
Standard labour price
€0.90/ lm
Indicative range
€0.72 - €1.17
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Installation of External APU Bead with Mesh

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Insulation13 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Insulation cost

Install APU bead with meshlm€0.90 / lmlmenter quantity-
External wall insulation with polystyrene (full adhesive bond and anchoring)m²€25.00 / m²m²enter quantity-
External wall insulation with mineral wool (inc. fixings)m²€28.00 / m²m²enter quantity-
Install ETICS system up to 20 cmm²€13.00 / m²m²enter quantity-
Window reveal insulation (XPS)lm€3.00 / lmlmenter quantity-
Ceiling/loft insulationm²€10.00 / m²m²enter quantity-
Vapour barrier installationm²€4.00 / m²m²enter quantity-
Thin-coat external render (scraped 2 mm)m²m²-
Apply fibreglass mesh to walls + adhesivem²m²-
Install PVC corner beadlm€1.90 / lmlmenter quantity-
Window head drip beadlm€2.50 / lmlmenter quantity-
Sprayed foam insulation (closed cell)m²m²-
Sprayed foam insulation (open cell up to 25 cm)m²m²-
Total labour
- enter quantity
Create quote from price list →

What an APU bead is and why the facade needs it

An APU bead with mesh is a slim plastic profile bonded to a window or door frame when a house is insulated externally. It creates a clean, flexible joint between the frame and the new render. It is needed whenever a building gets an external wall insulation system (EWI, also called ETICS) or when the render around an opening is repaired after new windows are fitted. Without it, a hairline crack sooner or later appears where render meets frame, and rainwater can get in through it.

The name comes from the German word Anputzleiste, meaning a bead that render is finished up to. The bead has several parts:

  • a self-adhesive strip that bonds it to the frame,
  • a plastic profile that forms the render edge at the frame,
  • a glass-fibre mesh that is embedded in the basecoat,
  • often also a tear-off protective lip with film that shields the window while rendering.

A window frame expands and contracts with temperature differently from render. If render were applied straight up to the frame, it would crack at the joint with the first frosts. The APU bead absorbs this movement and also seals the joint against rain.

It is fitted around windows, balcony doors and entrance doors, and at other fixed elements where render meets a frame. On a window with an external sill, the bottom edge is usually not finished with an APU bead but with the sill junction and its own seal, such as sealing tape and sill end caps. External building corners and reveal edges take a different profile, a corner bead with mesh. The two are often confused on site, but they do different jobs.

When to plan the bead and what to agree in advance

The APU bead is a small item in the budget for building insulation, yet it decides whether cracks appear around the windows years later. Several points are worth settling before work starts.

Order of works

The bead is bonded to a finished frame that is fixed and foamed in. If new windows are planned, they should be fitted before the insulation goes on. Replacing windows after insulation means cutting out the render at the frame and patching it, and the repair almost never blends in without a trace. Decide on the type of external sills beforehand too, as they are fitted in sequence with the beads and the insulation boards.

Which profile and from which system

APU beads differ mainly in the render build-up thickness they are designed for. The profile must match the thickness of the basecoat and finish render in your system. If it is too shallow, the render overhangs it. If it is too deep, a visible step remains at the frame.

A simple profile is enough for ordinary windows. For large glazed areas, sliding doors or dark frames that heat up more in the sun, a more flexible bead that absorbs movement in several directions is chosen. It is sensible to buy the bead from the same system as the basecoat and mesh. The system is tested as a whole, and mixing products can void the system warranty. If your external wall insulation is grant-funded, the installer must be certified to PAS 2030:2023 and registered with TrustMark, and the system should hold a third-party certificate (e.g. BBA).

How many metres to allow

The bead is measured in running metres around the opening, but only where render meets the frame. On a window with an external sill, three sides are usually counted: the width plus twice the height. A window 1.2 m wide and 1.5 m high with a sill needs roughly 4.2 m of bead. The full perimeter is counted only on openings without a sill. When comparing quotes, ask which sides the contractor counts and how balcony and entrance doors are priced.

In a block of flats, the decision about insulating the building lies with the freeholder, managing agent or residents' management company. For a house, check the Planning Portal before you start: many house alterations are permitted development, but you will usually still need building regulations approval, and flats, listed buildings and conservation areas have stricter rules. In Scotland, changes to external walls need a building warrant from the council before work starts.

How to fit an APU bead: step by step

The bead is fitted after the insulation boards are bonded and, where required, mechanically fixed, and before the full reinforcing basecoat. The insulation system manufacturer's instructions apply, but in broad terms the process is:

  1. Preparing the frame. The protective film is removed from the frame where the bead will be bonded, the frame is cleaned of dust and grease and must be dry. The self-adhesive strip will not hold on a dirty or damp frame.
  2. Preparing the insulation. The insulation next to the frame should be flat and tightly cut. Gaps are filled with foam or a strip of insulation, not adhesive.
  3. Cutting the bead. The bead is cut to the exact length of each side of the opening where render will finish against the frame. At corners, the pieces butt neatly or overlap according to the manufacturer's instructions so no gap is left.
  4. Bonding. The release tape is peeled off and the bead is pressed onto the frame along its full length, without waves or air pockets.
  5. Embedding the mesh. Basecoat is applied to the insulation and the bead's mesh is pressed into it with a trowel, working from the profile outwards. The mesh must not stand proud or crease anywhere.
  6. Diagonal patches at corners. Diagonal mesh patches are set into the basecoat at the corners of the opening to prevent diagonal cracks. They go in before the full reinforcing layer.
  7. Joining the facade reinforcement. The bead mesh and diagonal patches are overlapped by the full-surface reinforcing mesh, usually by about 10 cm.
  8. Finishing. Once the basecoat has cured, primer and finish render follow. Only then is the protective lip with film snapped off.

What affects the price

The guide labour price is €0.90 per running metre. The actual figure varies with how much work falls on each metre of bead:

  • Number and size of openings. With many small windows there are more corners and cuts per metre. Each corner has to be cut and closed precisely, so the price per metre is noticeably higher than with a few large windows.
  • Condition of the frames. New, clean frames are quickest. Old or uneven frames that need cleaning, degreasing and levelling take visibly longer.
  • Retrofitting to a finished facade. On top of fitting the bead, the render has to be cut out, joined to the existing reinforcement and the repair colour-matched. This is far more labour-intensive than fitting during insulation, and the price per metre is considerably higher.
  • Height and access. Ground-floor windows are done from the ground or a low platform. Working from scaffolding or a powered access platform on upper floors is slower, and equipment hire is often charged separately.
  • Type of bead. More flexible profiles for large glazing, sliding doors and dark frames cost more than a simple bead for ordinary windows.
  • Size of the job. On a full insulation job, the beads are fitted in one sequence with the other work. A separate repair of one or two windows costs more per metre, because the tradesperson has to attend and set up materials and tools for a small quantity.

When comparing quotes, check whether the price includes materials, diagonal mesh patches at corners and the join to the reinforcing layer, or only bonding the bead itself.

How to prepare the site before the beads are fitted

Much of the delay on site can be avoided by how the client prepares the property:

  • windows are fitted, foamed in and the foam trimmed before the renderers arrive,
  • the type and colour of the finish render are decided in advance, so a profile of the right depth can be chosen,
  • external sills are chosen and ordered so they can be fitted in the right sequence,
  • insect screens and external fittings that would get in the way of bonding are removed from the windows,
  • balconies, terraces and the area below the windows are cleared so scaffolding can be erected and openings reached,
  • windows and doors can be closed during the work, but the tradesperson has access to them from outside,
  • the work is scheduled to avoid frost, rain or heatwaves. Unsuitable weather holds up the whole insulation programme, not just the beads.

Common mistakes and how they show up later

Most mistakes do not show straight away but after the first winter. The most frequent ones in practice:

  • Bead bonded to a dirty or damp frame. The strip comes away over time, leaving a gap that lets rainwater in.
  • Wrong profile depth. The render either overhangs the profile or leaves a visible step at the frame.
  • Short mesh overlap. A few centimetres is not enough, and a crack appears where the bead mesh meets the reinforcing mesh.
  • Mesh pressed into basecoat that is already setting. It does not bond and later delaminates. If the basecoat has skinned over, a fresh layer must be applied.
  • Movement section of the bead covered with rigid basecoat. The bead can no longer work and loses its purpose. The crack then appears exactly where the bead was meant to take the movement.
  • Bead on only part of the perimeter. It may be missing at the head, on one side, or along the bottom of an opening without a sill. Every point where render meets a frame without a profile is a future crack.
  • Poorly sealed sill. Sealing tape or end caps are missing at the sill. Water then runs under the sill and into the insulation.
  • No diagonal patches at corners. A diagonal crack then runs from the window corner into the facade.
  • Working in unsuitable weather. Manufacturers usually specify air and wall temperatures from roughly 5 °C up to 25-30 °C depending on the system, no direct sun on a hot wall and no rain while curing. Otherwise the basecoat bonds poorly and the mesh does not integrate with it.
  • Protective lip removed too early. The window gets dirty during rendering and the frame can be scratched when cleaned.

How to check the finished work

It is best to inspect the beads before the finish render, when faults can still be put right quickly. At handover it is worth checking that:

  • the bead is on the head and both sides, and along the bottom where there is no sill,
  • the sill junction is sealed and the sill has end caps,
  • the profile holds to the frame along its full length and does not lift anywhere,
  • corners are closed with no gaps,
  • the mesh is fully embedded in the basecoat and does not stick out,
  • the overlap onto the reinforcing mesh is sufficient, usually about 10 cm,
  • diagonal mesh patches are in the corners of openings,
  • the movement section of the bead is not covered with basecoat,
  • the render runs smoothly into the profile without a step,
  • the window frame is clean and undamaged once the protective lip is removed.

DIY guide: retrofitting an APU bead to a ground-floor window

If you are repairing a crack at the frame of a single ground-floor window that you can reach from the ground, you can do it yourself. Leave upper floors and full insulation jobs, such as installing an ETICS system up to 20 cm, to a contractor. On a finished facade, the process differs from new insulation in that the existing layers must first be exposed and the new reinforcement joined to them:

  1. Find out which insulation system is on the facade, for example fully bonded polystyrene insulation or fully bonded and anchored mineral wool, and buy a bead, basecoat, mesh and render with the same texture from the same system.
  2. Carefully cut out a strip of finish render and basecoat along the frame, for example with an oscillating multi-tool. Protect the frame with tape and do not cut into it.
  3. Further from the frame, sand or scrape off the finish render to expose the original basecoat and mesh over a width of at least about 10 cm for the overlap.
  4. Check the insulation at the frame. Cut out and replace damaged or damp areas, and fill gaps with foam.
  5. Clean and degrease the frame and let it dry, then bond the bead and embed the mesh in basecoat as for new insulation.
  6. Set diagonal mesh patches into the corners of the opening.
  7. Apply basecoat with new reinforcing mesh so that it overlaps both the bead mesh and the exposed original basecoat by about 10 cm, and trowel it flush with the surrounding surface.
  8. Once cured, apply primer and render, and if needed paint the repaired area with masonry paint so the colour matches.
  9. Snap off the bead's protective lip with film.

Frequently asked questions

The guide price is €0.90 per running metre. Expect to pay more for many small windows with lots of corners, old frames, scaffold work on upper floors and small standalone jobs.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.