Building work price list: Chasing for Gas Pipework (Brickwork)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Gas installations cost | ||||
| Chasing gas pipe - brickwork | lm | €15.00 / lm | lm | enter quantity- |
| Forming and welding internal gas piping | lm | €18.00 / lm | lm | enter quantity- |
| Laying external gas main in ground | lm | €15.00 / lm | lm | enter quantity- |
| Chasing gas pipe - concrete | lm | €35.00 / lm | lm | enter quantity- |
| Install gas ball valve | pcs | €15.00 / pcs | pcs | enter quantity- |
| Connect gas cooker | pcs | €55.00 / pcs | pcs | enter quantity- |
| Connect gas boiler (install & hook up) | pcs | pcs | - | |
| Boiler commissioning and set-up | pcs | pcs | - | |
| Blank off gas pipework | pcs | pcs | - | |
| Relocate and reconnect gas pipework | pcs | €129.00 / pcs | pcs | enter quantity- |
| Install DHW cylinder | pcs | pcs | - | |
| Gas pipeline pressure test | pcs | €90.00 / pcs | pcs | enter quantity- |
| Gas appliance inspection (safety check) | pcs | pcs | - | |
| Install gas leak detector | pcs | €35.00 / pcs | pcs | enter quantity- |
| Relocate gas meter | pcs | €150.00 / pcs | pcs | enter quantity- |
What a gas pipe chase is and when it is needed
When a gas cooker is moved, a boiler is replaced or new gas pipework is run in a house or flat, the pipe is often set into the wall under the plaster. Before that, a chase has to be cut into the wall. Chasing is building work, but it always follows the route set by the gas engineer or the design. It is followed by pipe installation, a tightness test and the engineer's final checks. For an overview of the whole trade, see gas fitting work and how it fits together.
Chasing is measured in running metres, meaning the length of the route. The area of the wall or room does not matter. What matters is how many metres of pipe will run in the wall and where.
What to decide before any chasing starts
A chase should not be cut in advance on a rough guess. Before work starts, the following should be clear:
- Where the appliance will go. The position of the cooker, boiler or hob sets the end of the route. If the appliance later moves by half a metre, a new chase is needed and the old one has to be made good. When an appliance is being moved, chasing is usually part of relocating and reconnecting the gas pipe.
- Where the isolation valve will be. The valve must stay accessible, so its position needs to be planned along with the kitchen units or the cupboard around the boiler.
- Who sets the route. The route, depth and width of the chase are set by the gas engineer who will install the pipe, or by the design. Chasing should not start without those instructions.
- Whether the wall is load-bearing. In load-bearing masonry and near windows and doors, the depth of the chase needs care. In a block of flats, it is worth contacting the managing agent or freeholder in advance.
- What is already in the wall. If drawings of the electrics, water and heating exist, have them ready. Checking the route will be quicker.
- What the price includes. Dust extraction, removal of rubble and making good the chases after installation are often agreed separately. It is best to have this stated clearly in the quote.
- Order of works. Gas chases belong to first fix, before plastering, skimming, tiling and decorating.
How chasing is done step by step
In practice, the process usually looks like this:
- Marking out the route. Following the design or the gas engineer's instructions, the exact route is drawn on the wall, including heights, branches and appliance connection points.
- Checking the wall. A cable and pipe detector and any available drawings are used to confirm that no electrics, water or heating run along the route. In homes built before 2000, have suspect materials tested before you drill or demolish; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor. If old gas pipework is nearby, the gas engineer must first isolate it and make it safe, for example by capping off the gas pipe from the meter.
- Preparing the room. Furniture is moved out or covered with sheeting, floors are protected with board or dust sheets and doors to other rooms are sealed against dust.
- Cutting the edges. A wall chaser with twin diamond blades makes two parallel cuts at the set width and depth. The chase gets straight edges and the surrounding plaster does not break away unnecessarily.
- Removing the centre. The material between the cuts is removed with a breaker and a flat chisel. With perforated bricks, work is done carefully so that the voids do not break out beyond the chase.
- Finishing where the machine cannot reach. In corners, near the ceiling and around obstacles, the chase is finished by hand. Hand cutting is slower and less precise, so it is used only where there is no other option.
- Cleaning and checking. Dust and debris are removed from the chase, and depth, width and straightness are checked. Only then can the gas engineer lay the pipe.
- Installation and making good. The gas engineer lays the pipe, fixes it with clips and carries out a tightness test. Domestic gas pipework should be installed and tested to BS 6891:2015+A1:2019. The chase is then filled with a suitable material and prepared for plaster.
What to watch for in brickwork
Solid clay brick cuts fairly well. Perforated bricks, which are common in newer buildings, need care: the thin walls of the voids break easily and the chase can widen unexpectedly. That is why, even in brick, it pays to cut first and then break out, rather than knocking the chase out with a hammer alone. In older houses the brickwork can be brittle and laid in weaker mortar, so the work is done more gently.
Even in a brick house, the route may cross a concrete ring beam, a lintel over a door or a reinforced concrete column. Concrete is much harder, the work is slower, dustier and noisier, and it is practically impossible without diamond blades. Reinforcement in reinforced concrete must not be cut without the agreement of a structural engineer, because this weakens the structure. In large-panel concrete blocks of flats, chasing load-bearing walls is restricted, especially horizontal chases. More detail is given in the article on cutting chases for gas pipes in concrete. If the route passes through concrete in a block of flats, contact the managing agent or freeholder, and for a load-bearing wall also a structural engineer.
How deep and wide a gas pipe chase should be
A chase is cut for a specific pipe. It should be slightly deeper and wider than the pipe, so the pipe can be laid without strain, fixed with clips and covered with mortar and plaster. Enough material must remain over the pipe so the plaster does not crack. The exact dimensions are set by the gas engineer according to the type and diameter of pipe, so they should be obtained in advance.
An unnecessarily deep chase weakens the wall, especially in load-bearing masonry and near windows and doors. Horizontal chases weaken a load-bearing wall more than vertical ones, so stricter limits on depth and length apply to them. If a horizontal chase in a load-bearing wall needs to be deeper or longer, a structural engineer should decide.
Gas pipework in a wall runs only horizontally or vertically, never diagonally. If someone drills for a shelf a few years later, the position of the valve or appliance lets them estimate where the pipe runs. With a diagonal route, nobody can.
The gas pipe must keep a safe distance from electrical, water and other services in line with the design, the applicable standards and the manufacturer's instructions. The specific distances for your route are set by the gas engineer or designer. Valves and mechanical joints are not buried in the wall and must remain accessible. If the pipe is laid in concrete, the gas engineer usually also arranges protection so that it is not set solid in the material.
Gypsum-based fillers are not used to fill chases around steel and copper pipe, because they risk corroding the pipe. Cement or lime-cement mortar is suitable, or a repair compound approved by the gas engineer.
Price of chasing for gas pipework in brickwork per running metre
The typical labour price is €15.00 per running metre. The actual amount for your route depends on the following:
- Type of brick: solid clay brick cuts most evenly. Perforated bricks and brittle old brickwork need slower, more careful work, which raises the price slightly.
- Concrete sections: if part of the route crosses a ring beam, lintel or reinforced concrete column, that section is much slower and more expensive than brick. It is usually priced separately.
- Shape of the route: a straight route along one wall is cheapest. Every bend, branch and pass through a wall adds work, so complex routes cost more per metre.
- Length of the route: for a very short chase, preparation, covering and clearing up make up a large share of the price. Some tradespeople therefore charge a minimum call-out fee.
- Height and access: work near the ceiling, in corners or behind kitchen units is slower than at waist height on a clear wall. If a scaffold tower or platform is needed, the price goes up.
- Wall surface: if tiles or thick plaster have to be removed first, this is a separate job.
- Furnished home: covering furniture, sealing doors and working in a confined space all add time.
- Extra items: dust extraction with an industrial vacuum, carrying out and removing rubble and making good the chases after installation are often separate items in quotes.
What makes the work easier and what slows it down
Much of the time on site depends on preparation that the customer can do:
- Cleared walls: pictures, shelves, curtains and small furniture removed along the route so the tradesperson can start straight away.
- Route marked and agreed in advance: if the gas engineer draws the route on the wall beforehand, chasing does not have to wait for them to arrive.
- Information on services: drawings of the electrics and water, or at least information from a previous renovation on where cables and pipes run.
- Working socket and circuit: the wall chaser and vacuum need a reliable power supply close to the work area.
- Space for rubble: bags or a skip, an agreed way of carrying it out and, in a block of flats, protection for the lift and corridor. Before you hand over the rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
- Timing agreed with the gas engineer: the pipe should be laid as soon as possible after chasing so the chases are not left open for long and get damaged.
- Neighbours informed: chasing is noisy, so it is worth warning neighbours in advance and keeping to accepted hours for noisy work. Otherwise the work may be interrupted.
The work takes longer if the route changes during chasing, if someone is living in the home and rooms have to be cleared in turn, or if another service is found in the route only on site.
Typical mistakes and how they show up later
A diagonal route or a route that "just happened". It breaks the rule that gas pipework runs only horizontally and vertically, so the gas engineer may refuse to accept it and the chase will have to be redone.
A chase that is too shallow. The pipe does not have enough cover and the plaster above it cracks. The crack follows the line of the pipe and comes back after decorating.
A chase that is too deep in a load-bearing wall without consulting a structural engineer. The wall is weakened and cracks may later appear around the chase, especially near windows and doors.
Broken-out voids in perforated brick. The chase is unevenly wide, mortar drops into the voids, making good takes longer and the surface over the chase may sink or crack.
Cut reinforcement in a concrete ring beam or lintel. This is damage to the structure that a structural engineer must assess, and the repair is complicated.
A cut cable or pipe because the wall was not checked before chasing. The result is a power failure, a leak and further chasing for the repair.
Chasing with an angle grinder only. It creates a lot of dust and the chase has an uneven depth. The pipe then does not sit straight and the cover is not the same everywhere.
An uncleaned chase. Clips and mortar do not hold well and sharp edges can damage the pipe. Poorly bonded filler may come loose later.
Gypsum filler around metal pipe. Gypsum holds moisture and promotes corrosion of steel or copper pipe. The problem shows only after years, and the repair means opening the wall again.
A chase cut in advance without the gas engineer. The engineer often cannot use it because it does not match their solution. You pay twice, for the new chase and for making good the old one.
Permissions, building management and who may do what
Cutting the chase itself does not require any special registration. However, installing gas pipework, connecting it, tightness testing and commissioning may only be done by a Gas Safe registered engineer, so check the back of their ID card to see which work they are qualified for. Chases are therefore always cut by agreement with the gas engineer, never blindly in advance.
Whether your alterations need approval under local building regulations depends mainly on whether load-bearing structures are affected and whether the gas installation changes. Do not assume that nothing is needed, and check with the local authority's building control or with the gas engineer. In a flat, always also inform the managing agent or freeholder, as load-bearing walls and shared services are not yours alone, and the lease may require their consent.
If you smell gas during the work, stop immediately, do not operate any electrical switches or appliances, open windows, leave the area and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter.
How to check the finished work
Before the gas engineer lays the pipe and the chases are made good, it is worth going through these points:
- the route matches the design or the agreement with the gas engineer,
- the chases run only horizontally and vertically, with no diagonal sections,
- depth and width are even along the whole length, which can be checked with a tape measure at several points,
- the edges are straight and the surrounding plaster is not needlessly broken,
- there are no large broken-out voids in the brick and no cut reinforcement in the concrete sections,
- no other service has been damaged and the electrics and water work as before,
- the chases are cleaned of dust and debris,
- rubble has been removed and the area cleaned as agreed,
- after the pipe is installed, a tightness test has been carried out and the gas engineer has provided the test record or certificate, which should be kept.
It is a good idea to photograph the route before making good, with a tape measure held against the wall. When drilling or renovating later, you will know exactly where the pipe runs.
Frequently asked questions
Typically €15.00 per running metre. The final amount depends on the type of brick, the number of bends and branches, the height and access to the wall, and whether rubble removal and making good are included. Sections in concrete are priced separately.
Slightly deeper and wider than the pipe itself, so the pipe can be laid without strain, fixed with clips and well covered with mortar and plaster. The exact dimensions are set by the gas engineer according to the type and diameter of pipe. Horizontal chases in a load-bearing wall have stricter depth limits, and for larger interventions a structural engineer decides.
Technically yes, but it is more sensible to leave it to a tradesperson working with the gas engineer. The route must be set by the gas engineer, and a mistake in depth, direction or structure often only shows during the engineer's checks, when the repair is more complicated. If you still want to split the work, agree the exact route and dimensions in advance with the engineer who will install the pipe. Installing and connecting the pipe may only be done by a Gas Safe registered engineer.
Concrete is harder and often reinforced, the work takes longer and requires diamond tools. Reinforcement must not be cut without the agreement of a structural engineer. It is often simpler to adjust the route with the gas engineer so that it avoids the concrete.
A shorter straight route in brick is usually finished within a few hours. With concrete sections, several rooms or a complex route, the work can stretch over several days including clearing up.
The pipe is fixed with clips and the chase is filled with cement or lime-cement mortar, or a repair compound recommended by the gas engineer. Gypsum-based fillers are not used with steel or copper pipe. The surface is then levelled and prepared for plaster, paint or tiles.
Yes, but expect noise and dust. A wall chaser with dust extraction, covered furniture and working room by room all help. An emptied room speeds up the work and reduces the risk of damage to belongings.
Related work
How chases for gas pipes are cut into concrete, what to prepare, how to deal with reinforcement and how to check the chase before it is filled.
When a gas pipe is blanked off, what to arrange with the gas network operator, how a registered gas engineer does the job and what paperwork to keep.
How gas pipe relocation and connection works, who is allowed to do it, which documents you need and what to check before signing off the job.
How a gas boiler is fitted and connected, who may do the gas work, which documents you should receive and what to check at handover.
How a hot water cylinder is fitted and connected to the boiler and mains, what makes the job harder and what to check at handover.
How a gas safety inspection works, when you need one, who may carry it out and what the inspection report or certificate should contain.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.