Building work price list: Installation and Connection of Domestic Hot Water Cylinder
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Gas installations cost | ||||
| Install DHW cylinder | pcs | €390.00 / pcs | pcs | enter quantity- |
| Forming and welding internal gas piping | lm | €18.00 / lm | lm | enter quantity- |
| Laying external gas main in ground | lm | €15.00 / lm | lm | enter quantity- |
| Chasing gas pipe - brickwork | lm | €15.00 / lm | lm | enter quantity- |
| Chasing gas pipe - concrete | lm | €35.00 / lm | lm | enter quantity- |
| Install gas ball valve | pcs | €15.00 / pcs | pcs | enter quantity- |
| Connect gas cooker | pcs | €55.00 / pcs | pcs | enter quantity- |
| Connect gas boiler (install & hook up) | pcs | pcs | - | |
| Boiler commissioning and set-up | pcs | pcs | - | |
| Blank off gas pipework | pcs | pcs | - | |
| Relocate and reconnect gas pipework | pcs | €129.00 / pcs | pcs | enter quantity- |
| Gas pipeline pressure test | pcs | €90.00 / pcs | pcs | enter quantity- |
| Gas appliance inspection (safety check) | pcs | pcs | - | |
| Install gas leak detector | pcs | €35.00 / pcs | pcs | enter quantity- |
| Relocate gas meter | pcs | €150.00 / pcs | pcs | enter quantity- |
What cylinder installation covers and when it is needed
A domestic hot water cylinder stores heated water for showers, washing up and cleaning. The water is heated by electricity, a gas boiler, a solid fuel boiler or a heat pump. Installation therefore goes beyond fixing the cylinder in place. It also includes the cold feed and hot water connections, the safety devices and the link to the heat source.
The work is usually needed in three situations:
- a new build, where the cylinder goes in together with the plumbing and heating pipework,
- replacing a worn-out cylinder that leaks, heats slowly, runs noisily or produces rusty water,
- changing the heating method, for example from an electric cylinder to heating from a boiler. The same applies when a heat pump or solar PV is installed.
When replacing a cylinder, it is worth considering whether to keep the same type of heating. If the house already has a boiler and the old cylinder runs on an immersion heater, replacement is a good opportunity to switch to indirect heating.
Types of cylinder and when to choose each
Cylinders differ mainly in what heats the water. This determines the whole installation.
- direct electric cylinder: an immersion heater inside heats the water. Installation is the simplest and does not depend on a boiler. It suits flats and properties with no other heat source,
- indirect cylinder: inside is a heat exchanger, a metal coil. Hot water from the boiler or heat pump flows through it. The domestic water never mixes with the heating water, it only takes heat from it. If a boiler is already in place, this is usually the cheaper option to run,
- combined cylinder: it has both a coil and an immersion heater. It makes sense where a solid fuel boiler runs only in winter and electric heating is wanted in summer. It also provides backup if the boiler fails and can use surplus power from solar PV,
- wall-hung or floor-standing: smaller wall-hung units are common in flats. Larger floor-standing cylinders stand on the floor, usually in an airing cupboard, utility room or plant room of a house.
The capacity should match the number of people in the household and their habits. As a rough guide, allow about 40 to 60 litres per person. Households that take long showers or fill the bath need more. A cylinder that is too small runs out quickly. One that is too large keeps water hot that nobody uses. If in doubt, ask a plumber before buying.
What to decide before buying
Many problems arise because the cylinder is bought before it is clear where it will go and what it will connect to. Before ordering, clarify:
- location: can the wall carry the full cylinder? Will there be access later for servicing and anode replacement? Is there a drain nearby for the discharge from the safety valve?
- dimensions and connections: for a like-for-like swap, measure the height, diameter and connection spacing of the old cylinder. If the new one matches, the pipework does not need altering,
- heat source: for indirect heating, check that the boiler has an output for a cylinder sensor. The coil in the cylinder must suit the output of the boiler or heat pump,
- electrical supply: is there a suitable supply near the location with its own circuit protection? If not, allow for an electrician,
- mains water pressure: with high pressure the safety valve opens often. The plumber will judge whether a pressure reducing valve is needed on the cold feed,
- secondary circulation: in a house with long pipe runs, hot water takes a long time to arrive at the tap. In that case it is worth connecting the cylinder to a secondary return.
How the installation proceeds step by step
A good installation starts with a site survey. The plumber checks whether the wall can carry the full cylinder. Water weighs about one kilogram per litre, so a filled wall-hung cylinder is very heavy. The survey also covers the routes of the water, electrical and heating pipework and where the safety valve discharge can be taken. The work then usually continues as follows:
- Turn off the water supply, isolate the electricity and, when replacing, drain down and remove the old cylinder.
- Fit the brackets or prepare a level, load-bearing base for a floor-standing cylinder.
- Fix the cylinder in place and check that it is plumb and secure.
- Fit an isolating valve and a safety valve with a check valve on the cold feed according to the manufacturer's instructions.
- Run the discharge from the safety valve through a visible tundish to a drain.
- Where required, fit an expansion vessel designed for potable water.
- Connect the hot water outlet to the distribution pipework and, if applicable, the secondary return.
- For indirect heating, connect the coil to the boiler circuit.
- Fill the cylinder, bleed the air by opening a hot tap and check every joint for leaks.
- Only once the cylinder is full, switch on the heating, set the thermostat and confirm that the water heats up.
The safety valve must match the maximum pressure stated on the cylinder's data plate. On common cylinders its opening pressure is typically around 6 bar. A valve with the wrong rating either releases water unnecessarily or fails to protect the cylinder.
The electrical connection of the immersion heater must be carried out only by a qualified electrician. The immersion heater needs its own circuit protection and correct protection against electric shock in line with BS 7671:2018+A4:2026, the current IET Wiring Regulations. A new circuit is notifiable under Part P in England and Wales, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before work starts.
Connecting to the boiler: points to watch
With an indirect cylinder, connecting two pipes is not enough. The boiler has to know when to heat the cylinder and when to heat the house. The following points are therefore addressed:
- hydraulic connection: the flow and return of the coil are connected according to the manufacturer's markings. Otherwise the cylinder heats slowly and unevenly,
- circulating pump or motorised valve: these ensure hot water from the boiler flows into the coil exactly when needed,
- cylinder sensor and controls: the sensor in the cylinder reports the temperature to the boiler, which switches heating on and off accordingly,
- hot water priority: on most boilers cylinder heating takes priority over space heating so that hot water is available quickly,
- bleeding and pressure: after connection the heating circuit is bled and topped up to the pressure specified by the boiler manufacturer.
With a heat pump, pay attention to the size of the coil. A heat pump works at lower water temperatures and therefore needs a larger coil surface than a boiler. The wet central heating system the cylinder connects to should be designed to BS EN 12828, including its safety and expansion arrangements, and in line with the manufacturer's instructions.
If the installation involves any work on a gas boiler or gas pipework, it must be carried out only by a Gas Safe registered engineer. Check the back of their ID card to see which work they are qualified for. More on this trade can be found in the overview of gas fitting work. Where the gas supply has to be isolated first, capping the gas pipe at the meter is a separate job. New pipe runs may also require chasing brickwork for gas pipework or cutting chases for gas pipes in concrete. If gas can be smelt indoors, do not use light switches or naked flames. Ventilate, leave the property and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter.
What affects the installation price
The guide price for labour is €390.00 per unit. However, the scope of work can vary considerably even for the same cylinder. The final figure depends mainly on the following:
- heating type: an electric cylinder with no boiler connection is the simplest. Indirect heating adds the coil, a pump or motorised valve, a sensor and controls. The work is therefore noticeably more expensive,
- combined cylinder: the most labour-intensive. Each heat source, for example the boiler and electricity, has its own connection and controls,
- switching from electric to boiler heating: new pipework and controls have to be run in. The work can cost several times a simple replacement,
- like-for-like replacement: the cheapest, provided the connection dimensions match and the water, electrical and waste connections are right at the location,
- wall and fixings: a weak or hollow wall, such as plasterboard, needs different fixings or a supporting frame. This lengthens the job,
- size and access: a cramped space, a loft or a cellar with narrow stairs requires more people and time for a large cylinder,
- condition of the old pipework: corroded pipes break during removal and sections have to be replaced,
- extras: an expansion vessel, pressure reducing valve, secondary circulation or new isolating valves add materials and labour,
- removal and disposal of the old cylinder may be charged separately.
When comparing quotes, ask whether the electrician's work and, where relevant, the boiler engineer are included. Otherwise they will have to be booked and paid for separately.
How to prepare for the installation
How quickly the job goes also depends on how well the site is prepared:
- the new cylinder is on site, checked, with its instructions and all accessories,
- the location of the main stopcock and the consumer unit is known and both are easy to reach,
- the area around the cylinder and the route to it are cleared so the old unit can be carried out and the new one brought in safely,
- the old cylinder has been switched off in advance and has cooled down, so it can be drained without risk of scalding,
- the electrician and, where needed, the gas boiler engineer are booked for the same or the following day so the cylinder does not stand unconnected,
- in a block of flats, neighbours have been informed in advance if the water to the riser has to be shut off briefly.
In a block of flats, consult the managing agent or freeholder in advance, especially if the work affects shared pipework. Cylinder replacement is often part of a larger renovation or a change of heating system, and some cylinder installations, particularly unvented ones, are subject to building regulations. Check with the installer or local building control what applies to the specific job.
Common mistakes and how they show up later
No safety valve, or an isolating valve between it and the cylinder. This is dangerous. Water expands when heated. If it has nowhere to go, the pressure in the cylinder rises. The cylinder can deform, leak or, in an extreme case, burst.
Safety valve discharge not taken to a drain. Water drips onto the floor and the wall becomes damp. Sooner or later someone "fixes" the valve by blanking it off, and all protection is lost.
Switching on before filling. An immersion heater in an empty cylinder burns out within moments and has to be replaced.
Coil flow and return swapped. The cylinder heats slowly and unevenly. Hot water runs out quickly and the boiler runs longer than necessary.
Badly set controls. The boiler cycles on and off constantly, wears faster and uses more fuel. In other cases the boiler does not respond to the cylinder's demand at all.
Weak fixings. Over time a full cylinder works loose, tilts and strains the joints, which start to leak. If it falls, serious damage can result.
Missing earthing or no dedicated circuit protection for the immersion heater. In a fault, metal parts of the cylinder can become live and there is a risk of electric shock. Protection is provided by earthing together with an RCD, which quickly disconnects the circuit if current leaks. Without its own circuit protection the immersion heater also overloads a circuit shared with other appliances.
Installation contrary to the manufacturer's instructions. This can void the warranty in a claim, even if the fault is not directly related to the installation.
Water kept at a low temperature for long periods. Bacteria, including legionella, can multiply in the cylinder. Manufacturers therefore usually recommend heating the water to at least 60 °C from time to time, and up to 70 °C for a disinfection cycle. Many controls do this automatically.
A neglected safety valve. A valve that nobody has touched for years becomes furred with limescale and may stop working. Manufacturers therefore usually recommend turning or lifting it by hand occasionally to check that it releases water.
How to check the finished work
At handover, ask to be shown how the cylinder works and go through these points:
- the cylinder is firmly fixed, does not move and is plumb,
- no joint drips, even after the water has heated up,
- the safety valve is fitted, there is no isolating valve between it and the cylinder and the discharge runs through a tundish to a drain,
- the safety valve rating matches the pressure on the cylinder's data plate,
- the isolating valve on the cold feed is accessible,
- the water reaches the set temperature and the thermostat holds it,
- with boiler heating, the boiler responds to the cylinder's demand and the heating circuit has been bled,
- with electric heating, there is documentation of the electrical work by a qualified electrician, and an inspection certificate where applicable,
- where gas appliances were worked on, there is documentation from the Gas Safe registered engineer,
- the area is clean and the old cylinder has been taken away, if agreed,
- the instructions and warranty card are handed over. The installer shows how to drain the cylinder, how to test the safety valve and when to check the anode.
Frequently asked questions
The guide price for installing one cylinder is €390.00 per unit. The final figure depends mainly on whether it is an electric cylinder or a boiler connection and whether it is a like-for-like swap. Access to the location and the condition of the old pipework also play a part.
A competent person can handle the mechanical part. The electrical connection, however, belongs to a qualified electrician, and any work on a gas boiler to a Gas Safe registered engineer. Some cylinder types, such as unvented cylinders, also require a suitably qualified installer. Incorrect installation often voids the warranty, so it is worth leaving the job to a professional.
Water expands when heated and the safety valve releases a small amount. Occasional dripping is normal. If it runs constantly, the valve may be furred up or the mains pressure may be too high. Never blank off the valve.
A like-for-like replacement of an electric cylinder is usually done in a few hours. A new boiler connection with controls or a combined cylinder can take a full day.
The interval is set by the manufacturer and depends on water hardness. In hard water areas the anode wears faster. Checking it together with descaling is therefore usually planned every one or two years.
If a boiler is already in place, indirect heating is usually cheaper to run. However, the installation is more complex and the boiler and cylinder must be compatible. A combined cylinder keeps the option of electric heating, for example in summer or when the boiler breaks down.
Related work
How wall chases for gas pipes are cut in brick and concrete, which rules apply to the route, common mistakes and how to check the finished work.
How chases for gas pipes are cut into concrete, what to prepare, how to deal with reinforcement and how to check the chase before it is filled.
When a gas pipe is blanked off, what to arrange with the gas network operator, how a registered gas engineer does the job and what paperwork to keep.
How gas pipe relocation and connection works, who is allowed to do it, which documents you need and what to check before signing off the job.
How a gas boiler is fitted and connected, who may do the gas work, which documents you should receive and what to check at handover.
How a gas safety inspection works, when you need one, who may carry it out and what the inspection report or certificate should contain.