Gas Boiler Installation and Connection

Gas boiler installation and connection covers fitting the boiler, connecting it to all services and commissioning it. The guide price is €550.00 per boiler. The final cost depends mainly on the flue, the condensate drain and any pipework that has to be moved.

Updated 09/2026·11 min read·15 price list items
Standard labour price
€550.00/ pcs
Indicative range
€440.00 - €715.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Gas Boiler Installation and Connection

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Gas installation15 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Gas installations cost

Connect gas boiler (install & hook up)pcs€550.00 / pcspcsenter quantity-
Forming and welding internal gas pipinglm€18.00 / lmlmenter quantity-
Laying external gas main in groundlm€15.00 / lmlmenter quantity-
Chasing gas pipe - brickworklm€15.00 / lmlmenter quantity-
Chasing gas pipe - concretelm€35.00 / lmlmenter quantity-
Install gas ball valvepcs€15.00 / pcspcsenter quantity-
Connect gas cookerpcs€55.00 / pcspcsenter quantity-
Boiler commissioning and set-uppcspcs-
Blank off gas pipeworkpcspcs-
Relocate and reconnect gas pipeworkpcs€129.00 / pcspcsenter quantity-
Install DHW cylinderpcspcs-
Gas pipeline pressure testpcs€90.00 / pcspcsenter quantity-
Gas appliance inspection (safety check)pcspcs-
Install gas leak detectorpcs€35.00 / pcspcsenter quantity-
Relocate gas meterpcs€150.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What gas boiler connection means and when it is needed

The engineer hangs the boiler on the wall or stands it on the floor. They then connect it to the gas supply, the central heating, the cold and hot water, the electrical supply and the flue, test it and set it up. The work is needed in new builds, in heating refurbishments and most often when an old boiler reaches the end of its life and is replaced. Because it involves gas, it may only be carried out by a Gas Safe registered engineer. It is one of the main jobs within gas fitting work.

The terms installation, connection and replacement are often mixed up, so it helps to know exactly what is being ordered. Installation means fitting the boiler in position, including the mounting bracket and the connection kit. Connection means connecting a boiler that is already fitted to each of the services. A replacement also includes removing the old appliance.

This item normally includes:

  • fitting the boiler and connecting it to the gas supply through a gas isolation valve,
  • connecting the central heating flow and return,
  • with a combi boiler, connecting the cold mains and hot water outlet,
  • connecting the flue and air intake,
  • with a condensing boiler, running the condensate pipe to a drain,
  • filling the system, bleeding air, tightness testing and commissioning.

What to decide before placing the order

These points should be agreed with the engineer before signing a contract or accepting a quote:

  • Boiler type: a combi boiler heats water on demand and takes up less space. A system or regular boiler with a hot water cylinder suits homes where several taps or showers run at once, for example a house with two bathrooms. The cylinder, however, needs space.
  • Output: the boiler should be sized to the heat demand of the flat or house, not to the rating plate of the old boiler. Old boilers are often oversized, especially if the walls have since been insulated or the windows replaced. An oversized boiler cycles on and off frequently and condenses less efficiently.
  • Location: will the boiler stay in the same place or be moved? In a new position all connections have to be run from scratch.
  • Flue: will an existing chimney be used with a liner, or will a new concentric flue go out through the wall or roof?
  • Controls: which thermostat or weather compensation control is wanted and where it will go. It is better to run the thermostat cable before decorating.
  • Who commissions the boiler: will the installer arrange the manufacturer's warranty registration, the flue checks and any electrical work, or does the customer need to arrange these separately?

How the work is carried out step by step

  1. Disconnecting the old boiler: on a replacement, the engineer turns off the gas, drains the system, isolates the electrics and removes the old boiler. Care is taken not to damage pipework that will be reused. Where a supply is no longer needed, blanking off the gas pipe from the meter may be part of the job.
  2. Checking the location: the engineer checks the wall, the connections and the condition of the chimney or flue route. If something does not fit, for example there is no drain for the condensate, it is resolved at this stage.
  3. Hanging the boiler: the new boiler is hung according to the manufacturer's installation instructions, keeping the required clearances from walls and combustible materials.
  4. Gas connection: the gas is connected with approved fittings and seals, never with any flexible hose picked up from a DIY store. There must be a gas isolation valve before the boiler.
  5. Heating and water connections: the engineer connects the central heating flow and return and, on a combi boiler, the cold mains and hot water. A magnetic filter or dirt separator is usually fitted on the heating circuit so that sludge from old radiators does not block the new boiler's heat exchanger. A pressure relief valve, a pressure gauge and a means of bleeding the system are essential.
  6. Flue and condensate: the flue and air intake are connected and, on a condensing boiler, the condensate is taken through a trap to a drain.
  7. Electrics: the boiler and thermostat are wired in. A new circuit or fused spur is installed by a qualified electrician. In England and Wales a new circuit is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before work starts. All new electrical work should be certified to BS 7671:2018+A4:2026.
  8. Filling and tightness tests: the system is filled and bled. The heating circuit and water joints are then pressure tested and the gas connection is tightness tested.
  9. Commissioning and setup: the engineer sets the output, temperatures and controls and measures the flue gases with an analyser.
  10. Paperwork and handover: the engineer hands over the documents and shows how to operate the boiler.

What a condensing boiler changes in the installation

New domestic gas boilers are now practically all condensing boilers. They recover heat from the flue gases as well, so the flue gas temperature is low and condensate forms. This has three consequences for the installation:

  • the condensate must be drained, sometimes through a neutraliser according to the manufacturer's instructions,
  • an old masonry chimney is usually unsuitable for a condensing boiler, because the cool, moist flue gases would condense on its walls. It needs a plastic or stainless steel liner, or a concentric pipe-in-pipe flue is used instead,
  • the boiler only runs economically when it is set up properly, especially with weather compensation that adjusts to the outside temperature.

Where a home has an old open-flue boiler connected to a conventional chimney, replacing it with a condensing boiler is therefore rarely a simple swap. Allow for changes to the flue and the condensate drain.

Price of gas boiler installation and connection

The guide price for labour is €550.00 per boiler. It applies to a straightforward like-for-like replacement in the same position, where the connections line up, the flue is ready and a drain is close by. The boiler, flue liner and other materials are usually not included. The main factors that increase the cost are:

  • Moving the boiler: new pipework is needed for gas, heating and water, and often a new flue as well. Where pipes are buried, this can mean chasing brickwork for gas pipework or cutting chases for gas pipes in concrete. This is the biggest difference from a standard replacement and the cost can rise to several times that of the connection alone.
  • Flue: lining a chimney or fitting a new flue through a wall or roof is a separate job with its own materials.
  • Condensate drain: if there is no drain near the boiler, one has to be run, or a condensate pump or neutraliser fitted.
  • Condition of the heating system: a sludged system should be flushed or powerflushed before commissioning.
  • Boiler type: a system or regular boiler with a cylinder means more joints and pipework than a combi.
  • Electrics and controls: a new circuit, fused spur or thermostat wiring adds electrician's work.
  • Restricted space: a boiler in a kitchen cupboard or narrow alcove takes longer to fit and the cupboard sometimes has to be altered.
  • Scope of the quote: removal and disposal of the old boiler, pipework alterations, flue liner, commissioning and certification are included by some installers and charged separately by others. Check the quote and only compare quotes with the same scope.

How long a gas boiler replacement takes and how to prepare

A straightforward like-for-like replacement without major changes is usually completed in one working day. If pipework has to be moved, a chimney lined or the system flushed, the work can take two days. During this time there is no heating or hot water from the boiler. Unnecessary delays can be avoided as follows:

  • Clear access: clear the area around the boiler, the gas meter and isolation valve, the main stopcock and the consumer unit. Empty the kitchen cupboard, shelf or airing cupboard where the boiler is located.
  • Boiler on site: if the boiler is bought separately, agree the model with the engineer so that it suits the connections and the flue, and arrange delivery before the installation day. A different model or late delivery often means rebooking.
  • Old paperwork: have the latest gas safety and service records and the documentation for the old boiler ready. They show the engineer how the system was installed.
  • Coordinated trades: the heating engineer, the electrician and anyone fitting the flue liner should follow one another without long gaps. If one trade waits for another, the boiler stays out of use.
  • Outside the heating season: installers have more availability in summer and a day without heating matters less.
  • Being present at commissioning: be at home for commissioning so that the engineer can explain the controls and hand over the paperwork.

Who may connect the boiler, what needs to be arranged and which documents are issued

Work on gas appliances is legally restricted. Connecting a boiler to the gas supply may only be done by an engineer on the Gas Safe Register who is qualified for that type of work. Check the back of the engineer's Gas Safe ID card to see which work they are qualified for. Commissioning is often carried out or registered with the manufacturer's involvement, otherwise the boiler warranty may be affected. Electrical work, such as a new circuit or fused spur, is carried out by a qualified electrician.

When a boiler is replaced in the same position, the gas pipework stays as it is. If the boiler is moved or the gas pipework altered, the installation as a whole changes. The engineer should then check and test the entire gas installation on completion, not only the tightness of the new joint. Domestic gas pipework should be installed and tested to BS 6891:2015+A1:2019.

In a block of flats, changes to a shared chimney or a flue through the external wall must be agreed with the freeholder, managing agent or management company before installation. A boiler installation is notifiable building work. A Gas Safe registered engineer normally notifies it on the customer's behalf, and a Building Regulations compliance certificate follows. Where the flue changes the appearance of the building, for example in a listed building or conservation area, check with the local council what is required. Do not assume that no approval is needed.

On completion the following should be provided:

  • a record of the gas tightness test,
  • the completed commissioning checklist with the measured flue gas readings,
  • a record of the flue check,
  • the Building Regulations compliance certificate once the installation has been notified.

Insurers and the manufacturer will ask for these documents in the event of a claim. The installation is carried out according to the manufacturer's instructions and the applicable standards and regulations.

Typical mistakes and how they show up later

  • Unapproved seals or hoses on the gas and no tightness test: a joint may be sound at first and start leaking over time. A gas leak is a direct danger to life, and an insurer may refuse a claim where there is no paperwork.
  • Condensing boiler on an old unlined chimney: the chimney becomes damp, wet patches and salt staining appear on the walls, the plaster breaks down and the chimney may draw poorly.
  • Condensate drain without a trap: drain odours come into the room, especially when the boiler has not run for a while.
  • No filter on the return: the heat exchanger fills with sludge from old radiators, the boiler becomes noisy, heats less well and shows fault codes. Repairing a heat exchanger is expensive and may not be covered by the warranty.
  • Boiler left on factory settings: a boiler only condenses when the return water is cool enough. With a high flow temperature it condenses little, uses more gas than necessary, and this only becomes apparent on the bill.
  • Heating and water pressure test skipped: a small leak on a joint shows up weeks later as a damp wall, a wet cupboard or pressure that keeps dropping.
  • Ventilation blocked after replacing windows: with boilers that draw combustion air from the room, new airtight windows restrict the air supply. The boiler burns poorly and there is a risk of flue gases entering the room.

If a gas leak is suspected, do not switch on the boiler, do not operate electrical switches or use naked flames, turn off the gas at the meter, open windows and, from a safe place, call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter.

Handover checks

Before the engineer leaves, go through these points together:

  • there is a gas isolation valve at the boiler and it is easy to reach,
  • the system has a pressure gauge, a pressure relief valve and a filter,
  • the pressure on the gauge is within the range stated by the manufacturer,
  • the engineer has explained the result of the heating and water pressure test,
  • the boiler responds to the thermostat and provides heating and hot water without fault codes,
  • the radiators heat up evenly and there is no air gurgling in the pipes,
  • the condensate pipe has a trap and nothing is dripping,
  • the flue is firmly supported and the joints are secured,
  • there is no water under the boiler or at the heating and water joints,
  • all four documents listed above have been provided or arranged,
  • the engineer has shown how to top up the pressure, bleed radiators and read the fault codes,
  • the service contact is known and the date of the first annual service is clear.

Frequently asked questions

The guide price is €550.00 per boiler for a standard replacement in the same position. Moving the boiler, altering the chimney or fitting a new flue, running a drain and flushing the system all add to the cost. The boiler and materials are usually paid for separately.