Building work price list: Gas Pipe Blanking from Meter
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Gas installations cost | ||||
| Blank off gas pipework | pcs | €150.00 / pcs | pcs | enter quantity- |
| Forming and welding internal gas piping | lm | €18.00 / lm | lm | enter quantity- |
| Laying external gas main in ground | lm | €15.00 / lm | lm | enter quantity- |
| Chasing gas pipe - brickwork | lm | €15.00 / lm | lm | enter quantity- |
| Chasing gas pipe - concrete | lm | €35.00 / lm | lm | enter quantity- |
| Install gas ball valve | pcs | €15.00 / pcs | pcs | enter quantity- |
| Connect gas cooker | pcs | €55.00 / pcs | pcs | enter quantity- |
| Connect gas boiler (install & hook up) | pcs | pcs | - | |
| Boiler commissioning and set-up | pcs | pcs | - | |
| Relocate and reconnect gas pipework | pcs | €129.00 / pcs | pcs | enter quantity- |
| Install DHW cylinder | pcs | pcs | - | |
| Gas pipeline pressure test | pcs | €90.00 / pcs | pcs | enter quantity- |
| Gas appliance inspection (safety check) | pcs | pcs | - | |
| Install gas leak detector | pcs | €35.00 / pcs | pcs | enter quantity- |
| Relocate gas meter | pcs | €150.00 / pcs | pcs | enter quantity- |
What gas pipe blanking from the meter means
When a gas supply is blanked, the engineer closes the open end of the pipework with a fixed, gas-tight metal fitting called a blank, cap or plug. The pipe stays in place, but gas can no longer pass through it. Each blank is one specific point on the installation, so the work is priced per piece, which means per point that needs capping.
When a gas supply is given up completely, the meter is removed first. The engineer then caps the pipework where the meter was connected, usually just after the emergency control valve (ECV). This valve marks the boundary between the network side of the supply and the pipework inside the property, so this is where the installation is normally closed off.
Blanking is needed when gas is no longer going to be used:
- when switching to a heat pump or electric heating,
- during refurbishment, when the installation is taken out of use for a while or part of it is removed,
- before selling a property whose new owner does not want gas,
- when only one appliance is removed, for example a gas cooker in the kitchen, and the rest of the installation stays in use.
Blank the pipe or remove it
A blank is a sensible solution when the pipework cannot or should not be stripped out straight away. The pipe stays in the walls or on the outside wall, it is safely sealed and it can be used again later after an inspection. Full removal, by contrast, cannot be undone. It takes longer and usually involves making good afterwards, such as filling chases and holes through walls.
Blanking can be permanent or temporary. A temporary cap is used, for example, during refurbishment when gas is to be reconnected later. Even a temporary cap must be fully gas-tight and recorded. Before the gas is put back into use, a new inspection and tightness test are required.
A closed valve on its own is not enough. Old valves and seals lose their tightness over time. Forgotten pipework in a cellar or under a floor can be drilled into or damaged during later building work. An open or poorly sealed pipe end is a hidden risk that may only show itself years later.
Before booking the work, it helps to clarify a few points:
- Is the whole gas supply being given up, or only part of the installation? This decides whether the pipe is capped after the ECV once the meter is removed, or only one branch to an appliance.
- Is it permanent or only for the refurbishment? For a temporary solution, it is worth choosing a point where the installation can easily be reconnected later.
- What happens to the appliances? The boiler, cooker or water heater will be disconnected from the gas. Their removal and disposal are separate jobs. An appliance with a plug only needs unplugging. If the boiler is wired into a fused spur or directly to the supply, it should be disconnected by a qualified electrician.
- Will the pipe remain visible? If it will later be tiled over or boxed in with plasterboard, tell the engineer. The capping point can then be marked and recorded on a sketch.
What to arrange before the gas is blanked
The work on the pipe itself is quick. The paperwork takes longer and needs to happen in the right order:
- close the gas supply account with your energy supplier, otherwise standing charges may continue even with no gas used,
- ask your supplier to arrange removal of the meter, which does not belong to you and is removed by an authorised meter technician,
- check with the supplier where exactly the capping should be and what documents they expect from you afterwards,
- in a block of flats, agree the work in advance with the managing agent, freeholder or management company, as risers and parts of the pipework are shared,
- if the whole service pipe to the property is to be removed, contact the gas distribution network, as this work is carried out on their side.
Whether any further approval is needed depends on the scope of the work. If the job goes beyond capping the pipework inside the property, check the requirements directly with local building control rather than relying on neighbours or general advice online.
How the engineer blanks the pipe after the meter
Blanking may only be carried out by a Gas Safe registered engineer qualified for the relevant work. Homeowners and general plumbers who are not registered must not work on gas pipework, as this is a legal requirement under the Gas Safety (Installation and Use) Regulations 1998 (Northern Ireland has its own 2004 Regulations). Check the back of the engineer's Gas Safe ID card to see which work they are qualified for. The typical procedure, as part of gas fitting work, looks like this:
- Survey: the engineer locates the ECV, the former meter position and the pipe route, and checks the pipe material and diameter.
- Isolation: the ECV is turned off and the engineer confirms that gas is no longer flowing.
- Depressurising: the pipework is depressurised and residual gas is safely purged.
- Preparing the pipe end: the pipe end is cleaned, cut back if necessary and the thread or flange prepared.
- Fitting the cap: a blank, plug or other cap suitable for the pipe material and diameter is fitted.
- Tightness test: domestic gas pipework is tested to BS 6891:2015+A1:2019. The capped section, now free of gas, is usually pressurised with air and a manometer is checked to confirm the pressure does not drop. Joints that remain under gas pressure, for example at the ECV, are checked with a gas detector. Leak detection fluid on the joints can be used in both cases.
- Record: the engineer issues a written record of the work and the test result.
If only part of the installation is taken out, for example the branch to a cooker, only that branch is capped and the rest stays in use. Where pipework is moved rather than capped, this falls under gas pipe relocation and connection. The service pipe itself and any work on the network are handled by the gas distribution network, not by a private engineer.
For one easily accessible point, the work on site usually takes one to two hours, including the tightness test and the record.
What affects the price of blanking
The guide price for the work is €150.00 per piece. It applies to one capping point on accessible pipework. The final amount varies from property to property depending on these factors:
- Number of capping points: each blank is a separate piece. With several appliances or branches, or work at several points in a block of flats, the price rises roughly with the number of pieces. The tightness test and record, however, are often done once for the whole job.
- Condition of the pipework: newer steel pipe with good threads or copper pipe can be capped quickly. With corroded old pipes, a section often has to be replaced before a cap can be fitted at all. Such work can cost several times as much as simple capping.
- Access to the pipe: exposed pipework near the ECV or in a meter box on the outside wall is the cheapest case. Pipework hidden in a wall, floor or duct must first be exposed and then made good. This is separate building work, for example chasing for gas pipework in brickwork or cutting chases for gas pipes in concrete.
- Pipe material and diameter: a larger diameter or a flanged joint means a more expensive cap and more work than a small threaded plug.
- Unknown route and unclear boundary: missing drawings, underground pipework or an unclear boundary between the service pipe and the internal installation mean time spent tracing and sometimes coordination with the gas network.
- Related work: decommissioning and removing appliances or a separate safety inspection report are usually charged extra. When comparing quotes, ask exactly what the price includes.
For non-standard cases, the engineer usually carries out a site visit first and only then proposes a method and a price.
How to prepare the property for the engineer
The visit will go more smoothly if the following is ready on site:
- Documents to hand: drawings of the gas installation, previous safety records or at least a sketch of the pipe route save time spent searching.
- Clear access: free access to the ECV, the former meter position and the appliances, an unlocked meter box and keys to the cellar or shared areas.
- Labelled valves: in a block of flats it should be clear which valve belongs to which flat. If nobody knows, the engineer will have to find out.
- A pause in other work: if demolition, chasing or other dusty work is going on right next to the pipe, the engineer cannot work and carry out the tightness test properly.
- Someone present: the owner or a nominated person should be there so the engineer can show the capping point and hand over the record on the spot.
Mistakes when giving up gas and their consequences
Only a closed valve without a cap. The installation formally remains live and there is no proof that it has been sealed. On sale, refurbishment or inspection, it will have to be dealt with anyway, often in a hurry.
Capping by someone who is not Gas Safe registered. Without a record from a registered engineer, there is no proof of tightness. In the event of damage, the insurer may refuse to pay and there may also be legal consequences.
Trying to remove the meter yourself. The meter does not belong to the householder and may only be removed by an authorised technician. Unauthorised interference is treated as a breach of the rules.
Forgetting to close the supply account. No gas is used, but bills for standing charges keep arriving.
Not keeping the record. It will be missing later when the supplier, a buyer or an inspecting engineer asks for it. Without it, a new inspection often has to be paid for.
Working on shared pipework without the managing agent. In a block of flats, risers and parts of the pipework are shared. Work without agreement can put other flats at risk and leads to disputes with the freeholder or management company.
Covering the capping point without a record. If the blank is later hidden behind tiles or a suspended ceiling and nobody knows where it is, it may be damaged during the next refurbishment.
If you smell gas during preparation or at any other time, do not switch lights or appliances on or off, open the windows, leave the area and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter. Call the emergency service, not your energy supplier.
How to sign off the blanked pipework
At handover, ask to be shown the capping point and request the documents. Check that you have:
- a blank or cap firmly fitted, with no signs of leakage and a clearly visible point of work,
- the ECV turned off and the pipework labelled as out of use,
- a record identifying the property, the date, a description of how and where the pipe was sealed,
- the tightness test result recorded, including the method used,
- the engineer's name, signature and Gas Safe registration number, or the company stamp,
- a safety inspection report, if the supplier, insurer or buyer requires one,
- all documents filed with the property paperwork for the long term.
Frequently asked questions
As a guide, €150.00 per piece, meaning one capping point on accessible pipework. Expect to pay more for corroded pipes that need partial replacement, pipework hidden in walls or floors, and several capping points.
No. Work on gas pipework may only be carried out by a Gas Safe registered engineer. Unqualified capping puts the whole property at risk, and in the event of an incident the insurer may refuse to pay.
Usually not, if the supply account has been closed and the meter has already been removed. Some suppliers may, however, want to be notified in advance or receive a copy of the record. Check with your supplier's customer service.
For one easily accessible point, usually one to two hours, including the tightness test and the record. It takes longer with old corroded pipework, hidden pipe runs or several capping points. The paperwork with the supplier often takes the most time.
Yes, which is exactly why a blank is chosen instead of removal. Before reconnection, an inspection and tightness test are required, and a new supply must be arranged through a supplier, after which a meter is fitted again.
Ideally permanently, together with the property documents. It will be useful on sale, when reconnecting gas and in any dispute with an insurer.
Only the pipework after your flat's own valve can be capped. Even then, it is sensible to inform the managing agent or management company in advance. Risers and shared pipework must not be worked on without their consent.
Related work
How wall chases for gas pipes are cut in brick and concrete, which rules apply to the route, common mistakes and how to check the finished work.
How chases for gas pipes are cut into concrete, what to prepare, how to deal with reinforcement and how to check the chase before it is filled.
How gas pipe relocation and connection works, who is allowed to do it, which documents you need and what to check before signing off the job.
How a gas boiler is fitted and connected, who may do the gas work, which documents you should receive and what to check at handover.
How a hot water cylinder is fitted and connected to the boiler and mains, what makes the job harder and what to check at handover.
How a gas safety inspection works, when you need one, who may carry it out and what the inspection report or certificate should contain.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.