Gas Safety Certificate and Inspection

A gas safety inspection checks pipework, valves and appliances and is recorded on a certificate by a Gas Safe registered engineer. Guide price: €170.00 per inspection, mainly depending on appliances and pipework.

Updated 09/2026·11 min read·15 price list items
Standard labour price
€170.00/ pcs
Indicative range
€136.00 - €221.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Gas Safety Certificate and Inspection

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Gas installation15 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Gas installations cost

Gas appliance inspection (safety check)pcs€170.00 / pcspcsenter quantity-
Forming and welding internal gas pipinglm€18.00 / lmlmenter quantity-
Laying external gas main in groundlm€15.00 / lmlmenter quantity-
Chasing gas pipe - brickworklm€15.00 / lmlmenter quantity-
Chasing gas pipe - concretelm€35.00 / lmlmenter quantity-
Install gas ball valvepcs€15.00 / pcspcsenter quantity-
Connect gas cookerpcs€55.00 / pcspcsenter quantity-
Connect gas boiler (install & hook up)pcspcs-
Boiler commissioning and set-uppcspcs-
Blank off gas pipeworkpcspcs-
Relocate and reconnect gas pipeworkpcs€129.00 / pcspcsenter quantity-
Install DHW cylinderpcspcs-
Gas pipeline pressure testpcs€90.00 / pcspcsenter quantity-
Install gas leak detectorpcs€35.00 / pcspcsenter quantity-
Relocate gas meterpcs€150.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What a gas safety inspection and certificate are

A gas safety inspection is the general term for a periodic check of a gas installation. It is part of the wider field of gas fitting work. It can range from a routine gas safety check to a more thorough inspection with a tightness test of the whole installation. The check covers the whole gas installation in a flat or house: the pipework from the emergency control valve at the meter, the isolation valves and the appliances, such as the boiler, cooker, gas fire or water heater.

The engineer records the result on a gas safety certificate, often called a Gas Safety Record. This document confirms the condition of the installation on the day of the visit. It may be requested by an insurer, a buyer, a tenant or a letting agent.

An inspection is not a repair. The engineer checks and tests the installation and assesses whether it is safe. If a fault is found, it is recorded and a remedy is recommended. The repair itself must then be carried out by a Gas Safe registered engineer.

How often and when an inspection is needed

Landlords are legally required to have every gas appliance and flue they provide checked every 12 months and to give tenants a copy of the record. For owner-occupiers there is no legal inspection cycle, but HSE strongly advises a safety check and service by a Gas Safe engineer every 12 months, usually together with the boiler service. Many engineers note the next due date on the record.

Apart from the regular interval, an inspection is sensible in these situations:

  • after a new boiler, cooker, hob or water heater has been fitted,
  • after pipework has been altered, extended or moved, for example during a kitchen refit,
  • on completion of a new build or refurbishment and when the use of a room changes,
  • on sale or letting, when the new owner or tenant wants assurance about the installation,
  • after a fault, a gas escape or any work on the pipework,
  • when something seems wrong, for example a smell of gas, a flame going out, a lazy yellow flame or unusual noises.

On completion of building work, check in advance with building control or your inspector which gas certificates will be needed. A Gas Safe registered engineer who installs a new appliance normally notifies it, and a compliance certificate is then sent to the householder. Do not assume nobody will ask for it.

What to clarify before booking

It helps the engineer if you explain the situation when booking. The engineer can then allow enough time and bring the right equipment.

  • Reason for the inspection: annual check, a new appliance, altered pipework, completion of building work or a sale. After a new installation or alterations, a tightness test is carried out, which takes longer.
  • What should be checked: list the appliances, such as the boiler, cooker, water heater or gas fire. Say whether it is a flat or a house with pipework over several floors.
  • Routine check or fuller inspection: the last record shows what was done and whether a fuller check of the pipework is due.
  • Chimney and flue: the engineer checks the flue of each gas appliance as part of the inspection. If a property also has a chimney for a solid fuel or open gas fire, a chimney sweep may need to visit separately. If both are needed, for example before a sale, it is worth coordinating the dates.
  • Block of flats: communal pipework, such as risers and main valves, is the responsibility of the freeholder or managing agent. The appliances and pipework inside your flat are your responsibility. Ask the managing agent whether a check of the whole building is planned, as the engineer may then be able to check your flat during the same visit.

How the inspection is carried out

In flats and houses, a visit usually takes from half an hour to an hour or so. With more appliances or longer pipework it takes longer. The engineer usually proceeds as follows:

  1. Pipework: inspects the pipework from the meter to the appliances, looking at fixings, corrosion, damage and whether pipes are buried in walls or floors where they should not be.
  2. Valves: checks the appliance isolation valves and the emergency control valve to ensure they are accessible, labelled and can be turned off.
  3. Tightness: checks joints, fittings and flexible hoses for leaks with a gauge or leak detection fluid.
  4. Appliances: checks the connections, safety devices, correct flame picture and the flue that removes combustion products.
  5. Ventilation: assesses room ventilation and the air supply for combustion, especially for open-flued boilers, fires and water heaters.
  6. Tightness test, if needed: after a new installation or major alterations, the pipework is pressurised and monitored to see whether the pressure drops over the specified period. Domestic gas pipework should be installed and tested to BS 6891:2015+A1:2019.
  7. Certificate: the results and any defects are recorded on the certificate and explained to you.

What affects the price of an inspection

The guide labour price is €170.00 per inspection. This means one inspection of the gas installation, not one appliance. However, an inspection of a flat with a single cooker is a different job from checking a house with a boiler, water heater and long pipework over several floors. The effort, and therefore the price, depends mainly on:

  • the number of appliances and branches: each additional appliance means another check of the connection, combustion and flue. Some engineers therefore add a charge for each extra appliance,
  • length and accessibility of the pipework: pipes behind kitchen units, above ceilings or across several floors take longer to inspect,
  • need for a tightness test or further measurements: a test after a new installation or alterations is one of the biggest additions, as the pipework must be pressurised and monitored for the specified time,
  • missing records and older, repeatedly altered pipework: the engineer has to trace the pipe routes on site, and it is harder to tell what is original and what was added later,
  • type of check: a fuller inspection is more thorough than a routine check and usually costs more,
  • urgency: a quick appointment after a fault or outside normal working hours is often charged at a higher rate,
  • travel and shared visits: travel may be added for remote properties. When several flats in one building are checked together, the cost per flat is often lower.

When comparing quotes, ask whether the price covers the whole installation or each appliance separately, whether it includes a tightness test, and whether the certificate and travel are included.

Who can carry out a gas safety inspection

Only a Gas Safe registered engineer may carry out gas safety checks and gas work. Every registered engineer carries a Gas Safe ID card with a photo, a licence number and an expiry date. The back of the card lists the categories of work the engineer is qualified for, for example boilers, cookers or gas fires.

A certificate from someone who is not registered carries no weight with an insurer, a buyer or a letting agent. Before the work starts, ask to see the ID card, check the expiry date and whether it covers your type of appliance. If in doubt, check the engineer on the Gas Safe Register website.

What happens if the engineer finds defects

The engineer classifies defects by severity. A serious fault, such as a gas escape, a faulty flue or a valve that does not work, is classed as Immediately Dangerous. With your permission the engineer will turn off the appliance or supply and attach a warning label. Other faults may be classed as At Risk, and the engineer will usually recommend turning the appliance off. The owner, or the landlord in a rented property, is responsible for ensuring the appliance is not used until it has been repaired. After the repair, it is checked again.

Minor defects, such as missing pipe labels, or items classed as Not to Current Standards, do not prevent use. They should still be put right, ideally within the time the engineer suggests.

Repairs to gas pipework and appliances must be carried out by a Gas Safe registered engineer. A householder should not work on the gas supply, not even to replace a cooker hose or a valve.

How to prepare for a quick visit

Do not work on the gas pipework yourself. You can, however, prepare for the engineer's visit:

  • make the boiler, cooker, water heater and the emergency control valve accessible,
  • clear items covering pipes or valves, for example the contents of cupboards under the worktop or boxes in the boiler cupboard,
  • have previous gas safety records, service records and appliance manuals ready,
  • note any problems you have noticed, such as the flame going out, noises or a smell,
  • make sure someone is at home who knows where the pipes run and what has been altered in the past,
  • in a house, keep the gas meter and emergency control valve clear, including an external meter box.

The visit takes longer when the engineer has to wait for cupboards to be emptied, look for a valve behind furniture, or when old records are missing and nobody can say what has been changed.

Safety between inspections

Between inspections, have the boiler serviced as recommended by the manufacturer, usually once a year before the heating season. Many engineers carry out the service and the safety check on the same visit, but the two have different purposes. Keep the boiler room or cupboard dry and ventilated, and never block air vents.

If you smell gas, turn off the supply at the emergency control valve, do not switch lights or appliances on or off, do not use a phone in the affected area, open windows and doors, leave the property and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter. Call the gas network, not your energy supplier.

Typical mistakes and how they show up later

A missed check. People forget the date because everything works. The problem only shows when selling, letting, completing building work or making an insurance claim, when no valid certificate is available and one has to be arranged in a hurry.

A new appliance without a check. After a new cooker or boiler is fitted, the check is skipped. There is then no record of a safe connection, which can complicate the warranty and insurance.

A valve blocked by kitchen units. Engineers find this very often. In a gas escape, the valve cannot be reached quickly, and the fix usually means altering the units.

An old cooker hose. Flexible hoses are often left for many years, although they harden and crack with age. The leak is usually small and goes unnoticed for a long time.

Blocked air vents. An open-flued boiler or water heater does not get enough air, burns poorly and combustion products, including carbon monoxide, can spill back into the room.

DIY or unregistered alterations. The inspection reveals leaking joints or pipes buried in walls where they should not be. Putting this right means opening up walls, for example by chasing for gas pipework in brickwork or cutting chases for gas pipes in concrete, and new work by a registered engineer. Where an appliance is removed for good, the redundant pipe should be properly capped, for example by gas pipe blanking from the meter.

A certificate from an unregistered person. Insurers, buyers and letting agents will not accept it, and the inspection has to be repeated.

Checking the certificate on handover

Read the certificate while the engineer is still there, so anything unclear can be explained. Check that it contains:

  • the engineer's name, Gas Safe registration number and signature,
  • the property address and an exact list of the appliances checked, with their type and location,
  • a description of the pipework and the result of the tightness check or test,
  • a list of defects with their classification and the action required,
  • a clear conclusion on whether each appliance is safe to use,
  • the date of the inspection and the date of the next check.

If an appliance you have is missing from the certificate, ask for it to be added straight away. It is harder to sort out later. Keep the certificate with the receipt, including a digital copy, and put the date of the next check in your calendar.

How long a gas safety certificate is valid

The certificate describes the condition of the installation on the day of the check and states when the next check is due. For rented properties, a new check is needed every 12 months. A check carried out up to two months before the due date can keep the original anniversary date. As long as the next date has not passed and nothing on the installation has changed, the certificate is regarded as current.

If a new appliance is added, the boiler is replaced or the pipework is altered in the meantime, the old certificate no longer reflects reality. A new inspection is then needed, regardless of when the next regular check was due. On sale or letting, buyers and tenants therefore usually look not only at the date but also at whether the list of appliances on the certificate matches what is actually installed.

Frequently asked questions

The guide price is €170.00 per inspection. The final amount depends mainly on the number of appliances, the length and accessibility of the pipework, whether a tightness test is needed, missing records and how urgent the appointment is. When getting a quote, check whether the engineer charges for each appliance separately.