Cutting Holes for Luminaires, Speakers, etc. - up to Ø15 cm

Cutting a hole in plasterboard for a downlight, speaker or back box up to Ø15 cm costs roughly €11.50 per piece. The price depends mainly on the number of holes, the board thickness and whether the ceiling is already decorated.

Updated 09/2026·9 min read·7 price list items
Standard labour price
€11.50/ pcs
Indicative range
€9.20 - €14.95
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Cutting Holes for Luminaires, Speakers, etc. - up to Ø15 cm

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Plasterboard and dry lining7 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Plasterboard finishing cost

Cut-outs for light fittings in plasterboardpcs€11.50 / pcspcsenter quantity-
Plasterboard corner beadslm€2.50 / lmlmenter quantity-
Applying acrylic sealant to plasterboard joints and cornerslm€1.10 / lmlmenter quantity-
Access hatchespcs€45.00 / pcspcsenter quantity-
Door frame reinforcement in plasterboard partition with UA profilespcspcs-
Plasterboard niches and shelvingpcspcs-
Bespoke termination for LED strip / curtain tracklm€24.00 / lmlmenter quantity-
Total labour
- enter quantity
Create quote from price list →

What round holes up to Ø15 cm in plasterboard are used for

Holes like these take recessed downlights, small round LED panels, ceiling speakers, and PIR or smoke detectors in a plasterboard ceiling. Downlights usually need a cut-out of 60 to 90 mm. In a stud partition the holes are mostly for dry-lining back boxes for sockets, switches and data points. The standard hole for a dry-lining box is 68 mm. Round ventilation outlets also belong here if they fit within 15 cm. The job is one small part of plasterboard work, but it is very visible once the room is finished.

The cut itself takes moments. A mistake, however, shows clearly on a finished ceiling, and putting it right means a new piece of board, filling and redecorating. A crooked row of downlights or a torn edge around a fitting catches the eye every time you look up.

Larger holes, square openings, access panels, or openings that require cutting through a ceiling channel or stud are not standard cut-outs. The framing around them has to be reinforced, and that is a separate job, much like fitting a door frame into a drywall partition with UA profile reinforcement or the installation of shelves, niches or other recesses into drywall.

What to decide before cutting: fittings, layout and framing

  • The actual products: the manufacturer gives the cut-out size in the instructions. It varies even between fittings that look identical. Buy them, or at least choose them with the exact figure, before any cutting starts.
  • Layout: decide the number of lights, the spacing and the distance from the walls. Also decide whether they should line up with a window, the kitchen units or the dining table, or with features such as bespoke window finishes for curtains or LED strips. The layout must be settled before the ceiling is boarded so the electrician can leave the cables in the right places.
  • Position of the framing: the ceiling channels in a metal frame ceiling are usually 400 to 500 mm apart. If the lighting grid is planned around them, the holes will fall between the channels and nothing needs moving.
  • Void above the board: recessed downlights and speakers need a clear depth above the board as stated in the instructions. If the suspended ceiling sits tight to the structural ceiling, some types will not fit.
  • Weight: the board alone will carry ordinary downlights. Heavier fittings and speakers are fixed to the framing according to the instructions, and this needs planning in advance.
  • Who sets out the holes: agree whether the tradesperson only cuts the marked positions or also sets them out from the drawings.

Method: setting out and cutting with a holesaw or circle cutter

  1. Checking the size: the tradesperson confirms the cut-out size from the instructions for the fitting or back box.
  2. Setting out: the hole positions are marked from the drawings or as agreed. For a row of lights a common centre line and equal spacing are marked, most easily with a cross-line laser.
  3. Checking behind the board: a detector, or the screw lines in the board, shows where the framing, cables and other services run. A detector may not find every cable, so the cut is made carefully and only through the board thickness. When cutting near existing wiring, the relevant circuit is switched off at the consumer unit.
  4. Moving a mark: if a mark lands on a channel or stud, it is moved. A few centimetres is usually enough. With a symmetrical layout, however, the whole row has to shift.
  5. Cutting: the hole is cut square to the surface with a fixed-size holesaw or an adjustable plasterboard circle cutter. On a ceiling a holesaw with a dust cup is worth using. Otherwise the dust spreads around the room and sticks to fresh paint.
  6. Tidying the edge: loose paper and crumbly gypsum are removed from the edge.
  7. Dry fit: the fitting or back box is offered up without connecting it. This confirms that it holds firmly and sits flush with the surface.
  8. Clearing up: the remaining dust and offcuts are vacuumed up.

Price per hole in plasterboard: what it depends on

The guide labour price is €11.50 per piece. The same hole can be a quick routine job one day and slow, careful work the next. The price depends mainly on:

  • thickness and number of layers: a single 12.5 mm board cuts easily. Double boarding and fire-rated or moisture-resistant boards take longer and blunt the tools, so the hole costs noticeably more,
  • ceiling or wall: overhead work from a ladder is slower than cutting into a partition,
  • new or finished surface: before filling the board can be cut freely. In a decorated ceiling the floor and furniture must be covered and the edges treated with care, so it costs more,
  • number of holes: for a series of identical holes the price per piece is lower. With one or two holes most of the time goes on preparation and travel, and tradespeople often charge a minimum call-out fee,
  • setting out from drawings: when the tradesperson sets out the holes and aligns them to centre lines, it is more work than cutting marked positions,
  • what is behind the board: insulation, a vapour control layer or densely run cables mean slower progress, and in an insulated ceiling also covers for the downlights,
  • cables in place: when the cable tails are waiting in the right spot, the hole is simple. Running extra cable is additional work for the electrician.

How to prepare for the day of cutting

  • Have the fittings and back boxes on site, or at least their instructions with the cut-out size.
  • Prepare drawings or a simple dimensioned sketch so the layout is not decided on the spot.
  • Agree in advance who marks the positions, the electrician or the dry-liner. Both should know where the cable tails are.
  • Clear the space under the ceiling and make sure a working socket is available for the tools and vacuum.
  • In an occupied home, empty the room or cover the furniture beforehand, otherwise the tradesperson loses time sheeting up.
  • Once marked, do not change the light positions. Every change means new measuring and sometimes moving cables.

Holes in insulated ceilings, fire-rated ceilings and electrical work

In a loft conversion or below an unheated loft there is usually thermal insulation and a vapour control layer above the plasterboard. The vapour control layer is normally fixed between the framing and the board, so every downlight hole breaks through it. Warm, moist air then passes through the hole into the insulation. The solution is an airtight cover for the recessed downlight, or a service void below the vapour control layer that houses both the fittings and the cables. Tape is only for sealing an accidental tear away from the hole, not a substitute for a cover.

Light fittings get warm. The manufacturer states how much clearance they need from insulation and whether they may be in direct contact with it.

In fire-rated ceilings the holes are dealt with using fire-rated downlights or system covers specified by the ceiling manufacturer, otherwise the ceiling loses its fire resistance. This applies in houses and in flats, for example where the ceiling separates fire compartments. If the work affects the common parts of a block of flats, discuss the method in advance with the managing agent or the freeholder.

Connecting the fittings and boxes is a job for a qualified electrician, not for the dry-liner or a homeowner. The hole itself is not complicated, but overhead work near live wiring and the connections that follow belong to a professional, so they are not suitable for DIY. All new electrical work should be designed, installed and certified to BS 7671:2018+A4:2026, the current IET Wiring Regulations. A new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start.

Mistakes when cutting holes and their consequences

Hole too large

Spring clips cope with a small tolerance. If the hole is clearly larger than the manufacturer states, however, the springs have nothing to grip and the fitting sags or drops out. A fitting with a larger bezel or a repair ring can help. Otherwise part of the board has to be replaced.

Hole off line

In a row of lights even a few millimetres of offset is visible, especially in the evening with the lights on. A wider bezel hides a small error, a larger one only a new piece of board.

Torn or cracked edge

This happens with a blunt tool or when cutting right next to a board joint. The crack can later spread across the ceiling and show through the paint. The damaged area is cut out to a regular shape, a new piece is fitted, then taped, filled and sanded.

Channel or cable cut through

The ceiling loses support at that point and may sag. A damaged cable is a safety risk. The framing must be reinforced, and the cable must be repaired by an electrician.

Heavy fitting held only by the board

Over time it pulls out or the edge cracks around it. Heavier items are fixed to the framing according to the manufacturer's instructions.

Hole in an insulated ceiling without a cover

Nothing shows at first. Moist air, however, gets into the insulation, and after a while stains or mould may appear around the downlights.

Handover: how to check the cut holes

Before the electrician connects the fittings and the decorator finishes the ceiling, go through these points:

  • the holes are in line and equally spaced as agreed or as drawn,
  • the diameter matches the cut-out size in the instructions for the fitting or back box,
  • the edges are clean, with no torn paper and no cracks running into the board,
  • no hole cuts into the framing or a board joint,
  • the cables are pulled through to the hole and are undamaged,
  • in an insulated ceiling the covers are fitted or the service void is kept, and the vapour control layer is not torn elsewhere,
  • the fitting or back box holds firmly during the dry fit and sits flush with the ceiling,
  • the area is tidied and dust is removed from fresh surfaces.

Frequently asked questions

The guide price is €11.50 per piece. For a series of holes the price per piece is lower, while for a single hole the call-out is the main factor. Cutting into double or fire-rated boards, into a decorated ceiling, or with setting out from drawings costs more.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.