Drywall Partition Walls: Single Layer

A single-layer partition is a lightweight metal stud wall with one plasterboard on each face. Indicative cost is €23.50 per m², mainly affected by wall height, number of doors and finish quality.

Updated 09/2026·11 min read·11 price list items
Standard labour price
€23.50/ m²
Indicative range
€18.80 - €30.55
60 m² flat
€3525.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Drywall Partition Walls: Single Layer

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Plasterboard and dry lining11 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Plasterboard systems cost

Single-layer plasterboard stud partitionm²€23.50 / m²m²enter quantity-
Double-layer plasterboard stud partitionm²m²-
Plasterboard wall liningm²€18.00 / m²m²enter quantity-
Plasterboard flat ceilingm²€23.00 / m²m²enter quantity-
Sloped ceiling plasterboardingm²€28.00 / m²m²enter quantity-
Lay-in grid ceiling (incl. gridwork)m²m²-
High-impact plasterboard partitionm²m²-
Vapour barrier installation in plasterboard ceilingm²€1.40 / m²m²enter quantity-
Stud wall insulationm²€2.50 / m²m²enter quantity-
Lightweight mobile aluminium scaffold tower for high ceilingsm²€3.00 / m²m²enter quantity-
Mineral wool thermal insulation in a plasterboard ceiling (up to 100 mm)m²€4.00 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

What a single-layer partition is and when it is needed

The frame is made from steel studs and tracks, lined on both sides with plasterboard. A single-layer partition has one board on each face. It is usually chosen to split one large room into two, to separate a walk-in wardrobe or study area, to rework a bathroom layout or to divide a loft. The structural parts of the house are not affected. It is one of the most common jobs within plasterboard work.

It is much lighter than a block or brick partition, so it puts very little load on the floor it stands on. There is no wet trade involved in building it, and cables can be run inside it while it goes up. Of all plasterboard partitions, the single-layer type is the quickest to build.

Single or double layer: when one board is enough

The frame is the same for both. U-section tracks are fixed to the floor and ceiling, and vertical C-studs are fitted into them. The cavity between the studs is usually filled with mineral wool. The only difference is the number of board layers.

A single-layer partition has one board on each side, normally 12.5 mm thick. With a 75 mm stud the finished wall is about 100 mm thick. With a 50 mm or 100 mm stud the thickness changes accordingly. It suits ordinary room divisions, wardrobes, hallways, screens and study corners, provided nothing heavy will hang on it and complete quiet behind it is not required.

A double-layer partition has two boards on each side (about 125 mm overall with a 75 mm stud). It is the better choice where quiet and strength matter: between a bedroom and a living room, next to a child's room, for a home office, or on a wall that will carry kitchen units, a television or shelving. The heavier lining is harder for sound to set vibrating, and staggered joints leave no continuous gap. The method is described in more detail under double-layer plasterboard partitions.

Sound reduction also depends on how carefully the junctions with the ceiling, floor and side walls are sealed. Even a single-layer partition with properly fitted insulation and sealing tape cuts normal conversation far better than one without.

What needs deciding before ordering

Most things that can go wrong in a plasterboard wall have to be settled before it is boarded. Afterwards they can only be put right by cutting and patching.

  • Position of the wall and door: where the partition will go, how wide the door should be and which way it will open. The door size and type of frame or lining must be known in advance, because the opening and its reinforcement are built to suit.
  • Wall height: a single-layer partition on 75 mm studs is commonly used up to around 3 m. The exact maximum height is given by the system manufacturer according to stud size and spacing. A taller wall, for example under a high gable in a loft, needs a deeper or doubled stud or a different solution.
  • What will hang on the wall: cabinets, a television, shelves, a basin or a water heater. These points are reinforced in the frame, so they must be known before work starts. If there will be a lot of heavy items, a double-layer wall is the more sensible option.
  • Services: where sockets, switches, lights and any pipework will go. Cables inside the wall must be run and connected by a qualified electrician. A new circuit or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start.
  • Type of board: standard board for dry rooms, moisture-resistant board (usually green) for bathrooms and kitchens, fire-resistant board where fire resistance is required.
  • Finish quality: whether the wall will be simply painted, papered, tiled or exposed to strong side lighting. This determines how much jointing and sanding is needed, or whether a full skim coat is worthwhile.
  • Consents: in a block of flats, speak to the freeholder or managing agent before ordering, as the lease may require consent for alterations. Whether building regulations approval is needed in a particular case should be checked with local authority building control.

If an existing wall has to be removed for the new layout, that is a separate job. Work on a load-bearing wall or on the shared parts of a building needs assessment by a structural engineer, the relevant consent and a specialist contractor.

How a single-layer partition is built step by step

  1. Setting out. Using a laser level or spirit level, the line of the partition and the door position are marked on the floor, ceiling and side walls.
  2. Tracks. Sealing tape is stuck to the U-tracks to isolate the wall from the ceiling and floor and reduce sound transfer. Tracks are fixed to the floor and side walls with plugs or fixings suited to the background. In the ceiling, metal fixings are used, not plastic plugs. Fixings are usually no more than about 1 m apart, with one close to each end of the track. The end studs against the side walls are fixed in the same way.
  3. Studs. C-studs are cut about 10 to 15 mm shorter than the floor-to-ceiling height so they can be slotted into the tracks and are not squeezed if the ceiling deflects slightly. They are usually set at 600 to 625 mm centres to suit the board width, so that board edges land on a stud. Around door openings, heavier reinforced studs are used and a head is formed over the opening.
  4. Noggins and reinforcement. Reinforcement, such as strips of OSB or support channels, is fixed to the frame where cabinets, a television or a basin will hang.
  5. First side. One side of the wall is boarded. Board joints must always fall on a stud.
  6. Services and insulation. From the open side, the electrician runs cables and prepares positions for back boxes. Mineral wool is then fitted into the cavity so it fills the space without gaps and is not compressed. More on this is covered under acoustic and thermal insulation.
  7. Second side. The second side is boarded so its joints do not fall on the same stud as the joints on the first side. Screws are spaced as the manufacturer instructs, typically about 25 cm for a single layer. Heads are set just below the paper surface without tearing it.
  8. Jointing and sanding. Joints are filled, reinforcing tape is bedded in, and further coats follow once each has dried, then sanding. Corner beads are fitted to external corners.
  9. Priming. Before painting or papering, the surface is primed or sealed so paint absorbs evenly into both board and filler.

What affects the cost of a single-layer partition

The indicative labour price is €23.50 per m². The work is measured by the square metre of wall area. When comparing quotes, ask whether door openings are deducted and whether jointing, insulation and reinforcement are included or priced separately. The price then depends mainly on how much is going on in the wall:

  • Wall height: at a typical room height of about 2.6 m, the work is done from the floor or a small step ladder. A taller wall needs stronger studs and a scaffold tower. Boards are harder to handle, so the price per m² rises noticeably.
  • Number of openings: every door, access panel or service penetration means reinforcement and accurate cutting. A short wall with a door can cost more per m² than a long plain wall.
  • Room shape: sloping loft ceilings, recesses, uneven ceilings and junctions with out-of-true walls mean a lot of cutting and measuring. A loft with sloping ceilings involves considerably more work than a straight wall. If a new ceiling is also planned, it is worth coordinating with plasterboard and suspended ceiling installation.
  • Type of board: moisture-resistant board is handled in practically the same way as standard board, the difference is mainly in material cost. Fire-resistant and high-impact boards are heavier and harder to cut, so they add labour too.
  • Reinforcement: each reinforced area for cabinets or a television is extra work and is often charged separately.
  • Finish quality: a wall for ordinary emulsion needs less work than one under side lighting or with a sheen finish. In those cases the whole surface is skimmed or coated and sanded.

What makes the job easier and what slows it down

  • Clear space: a clear working strip is needed along the line of the new wall, plus space to store boards. Boards should be stored flat on a level, dry surface, not leaned against a wall where they can bow.
  • Getting materials in: boards are long and heavy. In a block of flats it helps to check in advance whether they fit in the lift and to agree with neighbours about carrying them up the stairs.
  • Wet trades finished: plastering and screeds in the room should be dry. Moisture from them slows the drying of filler and is absorbed by the boards.
  • Solid base: tracks are fixed to a solid base, not a floating floor. It must be clear whether the partition goes on the subfloor before the floor finish is laid.
  • Electrician on call: once the first side is boarded, the electrician must come to run cables. If there is a wait, the job stops.
  • Temperature and ventilation: in a cold, damp room filler dries slowly and every coat is delayed. Heating and gentle ventilation help, draughts do not.
  • Decisions made early: moving a door or reinforcement after boarding means stripping out and repairs.

Typical mistakes and how they show later

Poorly fixed tracks. The wall vibrates, shakes when a door is slammed and cracks at the joints.

Plastic plugs in the ceiling. The head track can work loose over time, and in a fire the plastic softens, so the wall loses its support.

Studs jammed between floor and ceiling. Ceiling deflection presses on them and cracks eventually appear in the boards.

No sealing tape. Sound and vibration pass through the ceiling and floor even with insulation in the wall.

Gaps in the insulation. Compressed or badly cut mineral wool reduces sound insulation. With a single layer this is all the more noticeable because the lining is light.

Joints not on a stud. A board edge that does not land on a stud flexes under pressure and the joint cracks after decorating.

Joints on both sides on the same stud. The wall is weaker at that point and cracks more easily.

Rushed jointing. Without tape, or without letting coats dry, cracks and patchy areas show through after painting.

Torn paper at screws. A screw driven too deep does not hold and the board loosens around it. This shows as a bump or hairline crack over the screw.

Forgotten reinforcement. Kitchen units hung on plasterboard alone are an unnecessary risk, and adding reinforcement later means opening the wall.

Standard board in a bathroom. Standard board swells in damp conditions and loses strength.

How to check the finished partition at handover

Inspect the wall in daylight and with a torch held to the side, and check the following:

  • the wall is plumb and has no obvious waves when checked with a long straightedge,
  • it does not move or creak when pressed by hand,
  • the junctions with the ceiling, floor and side walls are sealed with no visible gaps,
  • joints and screws are not visible after priming, even in side lighting,
  • there are no bumps or torn paper over the screws,
  • external corners have corner beads and are straight,
  • the door frame is solid and the door closes without catching,
  • socket and switch back boxes are firmly fixed and neatly made good around them,
  • the positions of reinforcement and cable runs have been drawn or photographed.

DIY guide: building a single-layer partition yourself

A simple partition at normal room height is within reach of a capable DIYer. The steps above apply. When doing the work yourself, keep the following in mind:

  • Leave the electrical work to a qualified electrician. The DIYer builds the frame and boards the first side, the electrician runs cables and fits back boxes, and only then is the second side boarded.
  • Before drilling into the ceiling and floor, check with a detector for hidden cables and pipes, and in a block of flats keep to any hours set for noisy work. In homes built before 2000, have suspect materials tested before you drill or demolish; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
  • Choose fixings to suit the background and check every stud with a spirit level once fitted.
  • Drive screws with a drywall screwdriver set to the correct depth so the heads do not tear the paper.
  • When jointing, let each coat dry fully before applying the next and sanding.
  • Wear a dust mask and safety glasses when cutting and sanding, and gloves and long sleeves when handling mineral wool.

Frequently asked questions

The indicative price is €23.50 per m². The final cost depends mainly on wall height, the number of doors and other openings, board type, reinforcement and the finish required. When getting a quote, ask whether insulation, jointing and reinforcement are included.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.