Building work price list: Installation of Shelves, Niches, or Other Recesses into Drywall
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Plasterboard finishing cost | ||||
| Plasterboard niches and shelving | pcs | €55.00 / pcs | pcs | enter quantity- |
| Plasterboard corner beads | lm | €2.50 / lm | lm | enter quantity- |
| Applying acrylic sealant to plasterboard joints and corners | lm | €1.10 / lm | lm | enter quantity- |
| Access hatches | pcs | €45.00 / pcs | pcs | enter quantity- |
| Cut-outs for light fittings in plasterboard | pcs | €11.50 / pcs | pcs | enter quantity- |
| Door frame reinforcement in plasterboard partition with UA profiles | pcs | pcs | - | |
| Bespoke termination for LED strip / curtain track | lm | €24.00 / lm | lm | enter quantity- |
What a drywall niche is for and where it works well
A niche is not a shelf screwed onto brackets. It is a space recessed into the wall, or projecting from it, that is built into the partition or wall lining itself. It saves the space furniture would otherwise take up and keeps the wall looking clean.
It is most often requested during a renovation:
- in the bathroom for toiletries and shampoo, often directly in the shower enclosure,
- in the living room around the television, for speakers or instead of a shelving unit,
- in the hallway for keys, small items and ornaments,
- in the bedroom next to the bed instead of a bedside table.
What to decide before installation
Many details of a niche can only be changed while the wall is still open. These points should be settled before work starts.
New or existing wall
A niche is easiest to build when a new stud partition or wall lining is going up anyway, for example in front of a services wall in a bathroom. The studs can then be spaced so they do not cross the opening. A niche can also be built into an existing wall, but first the studs, pipes and cables have to be located, part of the boarding removed, extra studs added around the opening, and the wall then jointed and redecorated, including the surrounding area. In homes built before 2000, have suspect materials tested before you drill or demolish - asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor. More background on this type of work is in the overview of plasterboard work.
Position and dimensions
The niche should be marked out before the framework goes up: height from the floor, width, opening height and depth. It helps to measure the items that will go in it. A pump bottle of shampoo, a soundbar or a row of books each needs a specific height and depth.
Type of niche
- recessed niche: the most common choice for bathrooms and hallways, it does not project from the wall and nothing catches on it,
- recess with several shelves: a replacement for a bookcase or shelving unit,
- decorative recess: light loads, the focus is on crisp edges, often with backlighting,
- projecting plasterboard shelf or ledge: suitable where the wall is not deep enough for a recess,
- niche with glass or timber shelves: the shelves are fitted at the very end into prepared positions.
For a recess with shelves and for heavier loads, it is important to know in advance what will stand on the shelves. Reinforcement goes into the wall before it is boarded. The section on fixing shelves below explains how.
How deep a niche can be
Depth is limited by the thickness of the wall. In a partition, the niche fits into the space between the studs, which is roughly the width of the stud: around 5 cm with 50 mm studs, around 7.5 cm with 75 mm studs and around 10 cm with 100 mm studs. The thickness of the front boarding the opening passes through adds to the depth: 12.5 mm with one layer of board or 25 mm with two. If the back of the niche is lined with another board, the depth is reduced by its thickness. For ordinary bathroom toiletries, a partition with 75 mm or 100 mm studs is more suitable. With 50 mm studs, only short and slim items will fit.
A deeper niche can be built in a wall lining set further out from the original wall. If the niche runs through the whole partition, only a thin back remains on the other side. The mineral wool that provides sound insulation is also cut out at the opening, so the wall lets through more noise at that point. For a wall between a bedroom and a living room, it helps to double the back of the niche with an extra board, even at the cost of some depth, or to place the niche elsewhere.
Lighting
If an LED strip or spotlights are planned, this needs to be known before boarding, so that the cable route, a back box and a place for the driver can be prepared. Similar preparation applies to bespoke window finishes for curtains or LED strips. Electrical connections must be made by a qualified electrician. In England and Wales, a new circuit or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. The driver should remain accessible, so it is not sealed permanently behind the board but placed, for example, in an access box or another reachable spot.
In a bathroom the space is divided into zones according to the distance from the bath and shower, and each zone has its own requirements. In a shower enclosure, only safety extra-low voltage fittings should be used in a niche, such as a 12 or 24 V LED strip with adequate water protection (IP rating). The driver belongs outside the wet zone. The electrician will determine which IP rating is required for the location, working to BS 7671:2018+A4:2026, the current IET Wiring Regulations.
Wall type
If the niche is to be formed in a masonry or load-bearing wall, it is no longer plasterboard work but a structural alteration. In that case, consult a structural engineer and building control, and in a block of flats also the freeholder or managing agent. In Scotland, structural alterations need a building warrant from the council before work starts.
Plasterboard shower niche
Bathrooms use moisture-resistant board designed for humid conditions. In a shower enclosure, where water sprays directly onto the niche, moisture-resistant board on its own is not enough. Showers therefore often use more durable materials, such as cement board or lightweight waterproof tile backer boards, which do not absorb water even if there is a small defect. The right material depends on the system used for the whole wall, so it is worth discussing with the installer beforehand.
Waterproofing has several parts:
- liquid tanking membrane on all surfaces of the niche, usually in two coats,
- sealing tape in the internal corners of the niche and over board joints,
- a continuous transition of the tanking from the niche to the surrounding wall, with tape and membrane lapped over the edges of the opening so water cannot get behind the board,
- sealed penetrations, for example for a lighting cable, using sealing collars or a sealant made for the purpose,
- a fall on the base towards the front so water does not sit on it. It is enough for the front edge of the base to be a few millimetres lower than the back.
Tiles in the niche are fixed with flexible tile adhesive that copes with moisture and minor wall movement. Choose a tile adhesive classified to BS EN 12004 (e.g. C2 for demanding substrates) and a grout classified to BS EN 13888 (e.g. CG2). Choose the tiles before installation and size the niche to suit the tile format. The grout lines in the niche will then line up with the rest of the wall and narrow offcuts are avoided.
How a drywall niche is built step by step
- Setting out: the position, dimensions and depth of the niche are marked on the floor, ceiling and wall. On an existing wall, the routes of pipes and cables are checked.
- Frame around the opening: vertical studs are fixed at the sides of the opening and horizontal sections above and below it. This creates a rigid frame that supports the edges of the niche.
- Reinforcement: for heavier shelves, reinforcing profiles or timber noggins are added exactly where the brackets will go.
- Insulation: the mineral wool is cut out at the opening and trimmed so it does not intrude into the niche.
- Electrical first fix: for lighting, the cable is run, a back box fitted and a place for the driver prepared. The electrician makes the connections.
- Boarding the wall: the wall is boarded and the opening cut exactly to the framework.
- Inside the niche: strips of board are cut for the sides, top and base of the niche and screwed to the studs. In a shower, the base is given a fall towards the front.
- Edges: corner bead is fitted to all external edges to keep them straight and protect them from knocks.
- Jointing: jointing tape is bedded into the joints, then the joints, screw heads and edges are filled in several coats. Each coat must dry according to the compound manufacturer's instructions.
- Sanding and checking: the surface is sanded and checked with a lamp held close to the surface. Any hollows are filled.
- Finishing: in a dry room, a mist coat or primer and paint follow, in a shower, tanking and tiling.
- Fitting shelves: glass or timber shelves are fitted into the prepared, reinforced positions.
How to fix a shelf to plasterboard and how much it can hold
Load capacity depends not on the board thickness but on what is behind it. Standard framework is enough for light ornaments. Books, electronics or full bathroom bottles need reinforcement:
- UA profiles, heavy-gauge reinforcing profiles fitted around the opening instead of standard studs, as also used when fitting a door frame into a drywall partition,
- a timber noggin or board fitted between the studs and screwed to them from the side, into which the shelves or concealed brackets are fixed,
- system support brackets from the plasterboard manufacturer for heavier loads.
Shelf brackets are screwed into a stud or into the timber insert. The board alone holds only light items, even with cavity fixings designed for plasterboard. Concealed brackets, which make the shelf look as if it grows out of the wall, must be prepared before boarding. Glass shelves rest on brackets with rubber pads so the glass does not sit directly on metal.
The exact load is always specified by the system manufacturer and the fixing manufacturer, so tell the installer in advance what will stand on the shelf. Adding reinforcement to a finished niche is difficult.
How much a drywall niche costs and what affects the price
The guide price for labour is €55.00 per piece. A niche is a small job with many details, so the price varies between jobs more than for a plain wall. The main factors are:
- New wall or retrofit: a niche planned together with a new partition or wall lining is the cheapest. Working into a finished, decorated wall is considerably more labour-intensive, often twice as much, because repairs and redecoration of the surrounding area are added to the niche itself.
- Size and number of shelves: each extra shelf means more edges, corner bead and jointing.
- Shape: arches, unusual shapes or many small shelves in one recess require precise cutting and bending of the board. This is significantly more work than a rectangular opening.
- Load capacity: a concealed support frame for heavier loads adds materials and time.
- Lighting and openings: luminaires or speakers mean extra cutting, cable preparation and coordination with the electrician, whose work is usually charged separately. See also cutting holes for luminaires, speakers and similar up to Ø15 cm.
- Shower: more durable boards, tanking, sealed penetrations and a fall on the base add materials and steps.
- Tiling inside the niche: cutting and laying small pieces so the grout lines match the wall is slow. Tiling is often charged as a separate item.
- Surface quality: with side light or backlighting every imperfection shows, so more coats of filler and more sanding are needed.
- Height: a niche above a bath or overhead is built from a ladder and takes slightly longer.
When comparing quotes, check whether the price includes reinforcement, corner bead, jointing, sanding and painting, or only the framework and boarding.
How to prepare so installation goes quickly
- Decisions made: when dimensions, number of shelves and loads are clear before the wall is built, the framework is put up once. Changes along the way mean taking it apart.
- Materials on site: if the tiles, LED strip or fittings are already bought, the niche can be built exactly to their dimensions. Waiting for materials halts the work.
- Electrician booked in time: the cable and back box must be in place before boarding. Otherwise the dryliner waits or a finished wall has to be opened later.
- Services recorded: photos or a plan of pipe and cable routes in the wall shorten the search and reduce the risk of damage.
- Heating and ventilation: in cold, damp conditions filler dries slowly. A heated, ventilated room shortens the wait between coats.
- Clear space: a cleared area around the wall and a protected floor speed up the work and less dust spreads through the home during sanding.
Common mistakes and how they show up later
Most mistakes are not visible at handover. They appear only after a few months of use:
No reinforcement. The shelf sags over time and the filler cracks along the edge. The crack returns even after redecoration because the movement continues.
Brackets fixed only into the board. They gradually loosen, pull out a piece of plasterboard and the shelf falls along with everything on it.
Niche too shallow. Taller bottles or a media player do not fit. Fixing it means rebuilding the framework.
Edges without corner bead. They get chipped at the first knock, for example while cleaning, and the repair is visible after painting.
Joints without tape. Hairline cracks appear over time at the joints and in the corners of the niche.
Poor waterproofing in the shower. Ordinary board, missing tanking or an unsealed transition to the surrounding wall mean the board absorbs water, swells, the tiles come loose and mould appears in the corners. This often shows only after months, when part of the surrounding wall is damaged too. If the base has no fall, water sits on it, limescale builds up and the grout darkens.
Tiles on standard adhesive. In wet conditions the tiles in the niche gradually loosen or the grout cracks.
Opening cut without checking services. A damaged pipe risks a leak, a damaged cable risks injury.
LED driver behind the board. When it fails, the finished niche has to be opened.
Too few coats of filler on the edges. In side light from a window or from backlighting, ripples, bead marks and joints are visible.
How to check a finished niche at handover
- the dimensions match what was agreed and the intended items fit,
- the edges are straight and square and do not ripple when viewed from the side,
- the internal surfaces are smooth even in side light, with no visible joints,
- the corner bead cannot be felt under the paint and the edges are not chipped,
- the shelves do not sag under load and the brackets are firm,
- the base of a shower niche falls towards the front and the corners are sealed,
- the grout lines in the niche line up with those on the wall,
- the lighting works and the driver is accessible,
- there are no cracks around the niche and the board does not move or creak when pressed by hand,
- the surroundings, floor and door frames are free of filler and dust.
How to build a drywall niche yourself
Doing it yourself only makes sense for a smaller decorative or bathroom niche without lighting, in a new wall lining or partition that you are building yourself, and with previous plasterboard experience. The method is the same as in the steps above. For electrical work, alterations to masonry walls and a niche directly in a shower without experience of tanking, it is better to call a professional.
Points to watch when doing the work yourself:
- have a spirit level, a plasterboard knife and saw, tin snips and a screwdriver with adjustable depth to hand,
- check the frame is square by measuring both diagonals of the opening, they must be equal,
- cut the opening in the board only after it has been screwed in place, following the edge of the studs,
- set screws just below the surface, not deeper, so the paper face does not tear,
- line up the corner bead with a spirit level before the filler sets,
- sand wearing a dust mask with the window open.
Frequently asked questions
The guide price is €55.00 per piece. The final price depends mainly on whether the niche is built with a new wall or into an existing one, the number of shelves, reinforcement, lighting, shower use and tiling. Check whether the quote includes jointing and painting.
Without reinforcement, only light items. With reinforcing profiles or a timber insert that the brackets are screwed into, it holds considerably more. The exact figure is given by the system and fixing manufacturers.
Yes. Expect the wall around the niche to be opened up, so a larger area than the niche itself will need redecorating.
Yes, if it is well protected against water. The key points are suitable board, tanking lapped onto the surrounding wall, sealed corners and penetrations, a fall on the base and tiles fixed with flexible adhesive.
The framework and boarding of a simple niche in a new wall take a few hours. Filler is applied in several coats and each must dry, so a simple niche including painting usually takes 2 to 3 days. With tanking, tiling, lighting or several shelves, allow 4 to 6 days.
Yes, provided the fittings are safety extra-low voltage with adequate water protection and the driver is outside the wet zone and accessible. Both the design and the connection should be carried out by a qualified electrician.
A niche in a plasterboard partition is a routine finishing job. For a masonry or load-bearing wall, the approach described above applies: a structural engineer, building control and, in a block of flats, the freeholder or managing agent.
Related work
How a plasterboard curtain pocket or LED recess is built, what to sort out before work starts and what to check when the job is handed over.
How a door opening in a plasterboard partition is reinforced with UA profiles, what to watch out for and how to check the finished work.
How holes for downlights, speakers and boxes are marked out and cut in plasterboard, what to watch out for and how to check the finished work.
What do stud walls, wall linings and suspended ceilings cost per m² in 2026? Labour price list for plasterboard work and a quick estimate in NUMIQ.
How a single layer plasterboard partition is built, when it is enough, what makes the job harder and how to check the finished wall.
How a flat gypsum board ceiling or suspended ceiling is installed, which boards to choose, what makes the job harder and how to check the result.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.