Plasterboard work: cost per m² 2026 and the process

An up-to-date guide to plasterboard (drywall) work for 2026. Compare partitions, lining walls and ceilings, see what makes the difference between good and poor work, and work out the labour cost from a live price list.

Updated 09/2026·17 min read·20 price list items
Standard labour price
€23.50/ m²
Indicative range
€18.80 - €30.55
Partition, 20 m²
€480.00
The rate shown is for labour installing a single-layer plasterboard partition without surface finishing. Insulation, trims, filling and finishing elements are priced separately.
Price my renovation
Updated prices
On this page
Short answer

A single-layer plasterboard partition costs €23.50 per m² of labour on the current price list. A lining wall comes to €18.00 per m², a flat ceiling to €23.00 per m², and a sloped ceiling in a loft conversion to €28.00 per m². What you finally pay depends mostly on how many openings, corners and service holes there are, how high the structure is, and whether you need extra sound or fire performance. Insulation, trims and finishing the surface are priced separately.

Types of work and their prices

€23.50
per m²

Common dividing structures in flats and offices. Single-layer boarding on both sides of a steel stud and track frame.

€18.00
per m²

Covers the original masonry, services or insulation. The depth of the structure is chosen to suit the space needed for services and insulation thickness.

€23.00
per m²

Lowers the ceiling to accommodate services, lighting or ventilation ductwork. The supporting grid is fixed into the ceiling structure according to the structural requirements.

€28.00
per m²

Boards out the rafters and creates space for thermal insulation in the roof build-up. Requires accurate measurement of the slope and a proper junction with vertical structures.

€2.50
per m²

Mineral wool fitted into the cavity improves sound insulation in a partition and the thermal performance of a lining wall or ceiling.

€2.50
per lm
Corners and Edges

Metal or paper-faced corner beads protect edges from damage and create a straight edge ready for decorating.

Drywall work price list 2026

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Plasterboard and dry lining20 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Plasterboard systems cost

Single-layer plasterboard stud partitionm²€23.50 / m²m²enter quantity-
Double-layer plasterboard stud partitionm²m²-
Plasterboard wall liningm²€18.00 / m²m²enter quantity-
Plasterboard flat ceilingm²€23.00 / m²m²enter quantity-
Sloped ceiling plasterboardingm²€28.00 / m²m²enter quantity-
Lay-in grid ceiling (incl. gridwork)m²m²-
High-impact plasterboard partitionm²m²-
Vapour barrier installation in plasterboard ceilingm²€1.40 / m²m²enter quantity-
Stud wall insulationm²€2.50 / m²m²enter quantity-
Lightweight mobile aluminium scaffold tower for high ceilingsm²€3.00 / m²m²enter quantity-
Mineral wool thermal insulation in a plasterboard ceiling (up to 100 mm)m²€4.00 / m²m²enter quantity-

Plasterboard finishing cost

Plasterboard corner beadslm€2.50 / lmlmenter quantity-
Applying acrylic sealant to plasterboard joints and cornerslm€1.10 / lmlmenter quantity-
Access hatchespcs€45.00 / pcspcsenter quantity-
Cut-outs for light fittings in plasterboardpcs€11.50 / pcspcsenter quantity-
Door frame reinforcement in plasterboard partition with UA profilespcspcs-
Plasterboard niches and shelvingpcspcs-
Bespoke termination for LED strip / curtain tracklm€24.00 / lmlmenter quantity-

Overheads

Carrying up plasterboard sheets / boardstt-

Other works

Other unspecified work in the tradehrhr-
Total labour
- enter quantity
Create quote from price list →

How much it costs by scope

Indicative Labour Cost for a 20 m² Partition
Bare Partition, Unfinished
Installing the frame and boarding on 20 m², taping 4 bm of corners.
€480.00
Partition with Insulation, Corner Beads and Sealed Corners
A 20 m² partition with insulation fitted, corner beads, and 10 bm of acrylic-sealed corners. Filling of board joints and surface finish are not included.
€541.00
Partition with Service Penetrations
A 20 m² partition with insulation, corner beads, acrylic sealing, one access panel and four openings for light fittings.
€632.00
The model totals use live prices and the stated quantities. Profiles, boards, screws and surface finishing are not included.

Preparation before installation

01
Marking Out

The installer marks where the partition, ceiling or lining wall will go on the floor, walls and ceiling. They check it against the drawings, the door opening and the other trades on site.

02
Checking Surfaces and Services

The installer checks that the floor, walls and ceiling are flat and strong enough, and finds any electrics, water pipes and ventilation that will end up hidden. These services get tested and recorded before anything is boarded over.

03
Planning the Frame

The installer sets the spacing of the studs and track, or the ceiling grid. They also plan where noggins go for heavier items (sanitaryware, shelves, a TV) and where the access panels will sit.

04
Getting Materials Ready

Plasterboard sheets need to lie flat somewhere dry before fitting. The room also needs the right temperature and humidity, or the boards can warp.

Method of work

  1. 01The installer marks exactly where the structure goes on the floor, walls and ceiling, following the drawings or site survey.
  2. 02They fix the perimeter track to the floor, walls and ceiling over a sealing strip that cuts down sound travelling through.
  3. 03Next come the vertical studs or the ceiling grid at the planned spacing. For extra tall walls or wide spans, the installer tightens the spacing and adds more fixings.
  4. 04Boarding starts on one side. The installer staggers the boards and screws them to the frame with the right screws at the right spacing.
  5. 05Mineral wool goes into the cavity, plus a vapour barrier where needed, followed by any services that will stay hidden.
  6. 06The installer boards the other side and fits the access panels, the noggins for hanging things, and the cut-outs for electrical boxes.
  7. 07They tape the joints between boards according to the edge type and system and fill them in two or three coats, then fit corner trims on the edges.
  8. 08Once the filler is dry, the installer applies a final skim and sands it smooth. The wall or ceiling is then ready for decorating.

5 common mistakes

01
No sealing strip under the track

Without a sealing strip under the perimeter track, sound passes straight into the surrounding walls and floor. The partition then blocks less noise than it should.

02
Studs or screws spaced too far apart

The boards flex, the filler cracks along the joints, and the wall or ceiling won't last as long.

03
Forgetting noggins before boarding up

For heavy loads like a basin cabinet or a TV, the safest option is a timber or metal noggin fitted before the wall is closed up. Whether a load can go straight into the board depends on the board itself (high-strength boards such as Rigips Habito take screws directly within the manufacturer’s limits), the type of fixing, the spacing and how far the load sticks out from the wall. Adding a noggin later means cutting into the finished wall.

04
Leaving out tape where the system needs it

Whether a joint needs tape depends on the edge type and the system. Some filler and edge combinations, such as Knauf Uniflott with suitable factory edges, are approved without tape, while cut edges and other systems need it. Follow the system instructions, otherwise joints tend to crack as the building settles or the humidity changes.

05
Boarding over untested services

If hidden wiring or pipes turn out to have a fault, someone has to break open the wall to reach them, and that gets expensive.

Where plasterboard works and where it does not

Plasterboard belongs to what builders call dry construction. You mix no mortar and wait no weeks for anything to dry, and a partition, a suspended ceiling or a wall lining can be finished in a few days. The construction is light, so it puts far less load on the floor and ceiling than a masonry partition. Its hollow cavity can also hide electrical cables, water pipes and ventilation ducts. That is why you see it in flat renovations, in loft conversions and anywhere a layout needs to change quickly.

It does have limits. It cannot carry as much as masonry, so if you want to hang something heavy, you need to plan for it while the wall is being built. A lightweight wall also deals with sound differently from a solid one. Buying a thicker board will not make a room quiet. The right build-up does. Where a wall is permanently damp or in direct contact with water, choose a different material, such as cement board.

If you are removing or adding a partition in a flat, it is not only your decision. In a block of flats, speak to the building management or the owners' association before you start. Whether your project needs a permit, a simple notification or nothing at all depends on local building regulations, so check with your local building authority. Do not rely on what used to apply years ago or on what a neighbour tells you.

Types of board and what they are used for

  • Standard board: for dry rooms, so partitions, ceilings and wall linings in living rooms, bedrooms and children's rooms.
  • Moisture-resistant board (usually green): absorbs less water, so it suits bathrooms, kitchens and WCs. It is not waterproof, though. In a shower and around a bath you still need to coat it with a liquid waterproofing membrane, just as you would a masonry wall.
  • Fire-resistant board: has glass fibres in its core, so it holds out longer in a fire. It is used in walls that separate fire compartments, on escape routes, around chimneys and in lofts.
  • Acoustic board: either heavier, or perforated with small holes that absorb sound inside the room. It is useful in offices or a home cinema.
  • Gypsum fibreboard: stronger and harder, holds screws better and copes with knocks. It makes sense for dry floor systems, hallways and walls where you plan to hang things.
  • Cement board: contains no gypsum, so moisture does not harm it. It belongs in shower areas, outdoors and in rooms that stay damp.

Boards, metal sections, screws, jointing compound and tape should all come from one system. Why does that matter? A manufacturer guarantees properties such as fire resistance or sound insulation only for a complete system it has tested itself. If you combine parts from three different suppliers, you have no such guarantee. Boards are made to EN 520, and you will find the board type printed on the back of each sheet.

Partition walls: studs, boarding and sound insulation

The frame of a partition is made of UW tracks fixed to the floor and ceiling, with vertical CW studs slotted into them. Which stud width you need depends on how tall the partition is and how well it should insulate. Boards are then screwed to both sides of the frame. Single boarding means one board on each side, double boarding means two, with the joints of the second layer offset from the first.

Double boarding makes the wall stiffer, better at blocking sound and longer lasting in a fire. It pays off wherever you plan to tile or hang things. If the wall will be tiled, either the studs go closer together or the wall gets two layers of board. Otherwise the board flexes under the weight of the tiles and the grout lines start to crack.

How to keep a partition quiet

Sound travels through a lightweight wall mainly where parts touch rigidly and through gaps. A few simple rules help:

  • stick a flexible sealing tape under the perimeter tracks so the partition is separated from the ceiling, the floor and the adjoining walls,
  • fill the cavity with mineral wool across the whole area, with no gaps,
  • two layers of heavier board insulate better than one thick board,
  • if you need real quiet, for example between two flats or next to a bedroom, build a twin-frame wall with two rows of studs that do not touch each other,
  • do not put socket or switch boxes in the same spot on both sides of the wall, or sound will pass through as if through a hole.

Every gap that nobody filled or sealed spoils the result noticeably. In practice it often happens that an otherwise well-built partition lets sound through simply because the junction with the floor was never sealed, or because an opening was left around the services at ceiling level.

Wiring inside the cavity should be connected only by a qualified electrician. In most countries this work must be carried out or signed off by a registered or licensed electrician, who should give you a test certificate for the installation when the job is done.

Suspended ceilings, wall linings and lofts

A suspended ceiling is screwed to a grid of CD channels, which hangs on hangers fixed into the existing ceiling. How far the ceiling drops depends on the type of hanger and on what needs to fit above it. If you are planning recessed lights, find out in advance how much depth they need. For ventilation, check the duct size. Decide where the lights go before the grid is installed, so that a cut-out does not land exactly on a channel.

A wall lining straightens uneven walls, hides services or works as an installation wall for a wall-hung WC and basin. In an installation wall, a steel frame carries the load and the plasterboard only covers it.

If a gas pipe runs through a wall lining or above a ceiling, do not box it in yourself. Any change to it must be made by a qualified, registered gas engineer. If you smell gas, do not use electrical appliances or switches, open the windows, leave the room and call your gas supplier's emergency line or the emergency number 112.

In a loft, plasterboard goes below the roof insulation. Between the insulation and the boards there must be a continuous vapour control layer, with taped joints and carefully sealed connections to the walls. Why is this so important? Every unsealed opening, even for a single electrical box, lets warm, moist air from the home into the insulation. There the moisture condenses and the insulation gets damp. Cables therefore belong in a service void below the vapour control layer, never through it.

Heavy items on plasterboard

You can hang a picture, a light shelf or a light fitting on cavity fixings that open out behind the board. Kitchen cabinets, a wall-mounted television, a basin, a radiator or a heavy shelving unit need reinforcement, though. This goes into the frame before the wall is closed. It can be a timber batten, a sheet of OSB or a system support rail between the studs.

Before the wall is covered, photograph the reinforcements and mark them on a sketch, with measurements from the floor and the corners. Hunting for a reinforcement in a finished wall usually ends with several unnecessary holes.

Jointing and surface finish levels

The joints between boards are filled together with reinforcing tape, the screw heads are covered with compound and external corners are protected by corner beads. How smooth the surface should be is usually described by finish levels Q1 to Q4:

  • Q1: joints are only filled at a basic level. This is enough under tiles or as a base for a further layer.
  • Q2: standard jointing, where the joint blends smoothly into the board surface. This is the usual base for matt paint.
  • Q3: joints are finished wider and the whole surface gets a thin skim, so that it absorbs paint evenly and has the same texture everywhere.
  • Q4: the whole surface is skimmed. This level is used under gloss paint, under finely textured wallpaper and on walls lit by light from the side.

Agree the finish level with your tradesperson in advance, because the amount of work differs a lot between levels. If a large window or an LED strip lights the wall from the side, standard jointing will show every joint.

Plasterboard goes in only once the wet trades are finished and plaster and screeds have dried. In damp, cold conditions the boards warp and the jointing compound cracks. Manufacturers therefore state the temperature and air humidity needed during installation and jointing. You will find these figures in the technical data sheet.

Niches, curves and a recess for curtains or an LED strip

Plasterboard lets you build shapes that would take a long time in masonry: niches in the bathroom and living room, shelves set into the wall, curved partitions or a ceiling on several levels. Curves are made with bendable channels and thinner boards that are dampened or scored before bending. Bear in mind, though, that every edge and corner means more beads, jointing and sanding. A shaped construction therefore takes much longer than a flat wall.

A popular detail is a recess by the window that hides a curtain track or an LED strip. There are two ways to build it. It can be part of a lowered ceiling that stops a short distance from the window wall, or a separate box of boards fixed to the ceiling. Before installation, find out the size and weight of the track and the curtains. They decide how deep the recess must be and whether it needs reinforcing. An LED strip needs an aluminium profile to carry heat away, and you must be able to reach the power supply, for example through an access panel.

Fire resistance

Plasterboard is also used where regulations require a construction to resist fire for a certain time. Typical cases are separating a garage from the living part of a house, escape routes in blocks of flats or encasing steel and timber beams. The resistance does not depend on the board alone. The whole build-up matters: which boards and how many layers, which studs, the mineral wool, the screw spacing and the sealing of every penetration with fire-rated sealants and collars.

If a construction is meant to protect against fire, it must be built exactly to the manufacturer's tested system and to the fire safety design prepared by a fire safety specialist. If you later cut a hole in such a wall for a cable or a light, it must be fire-sealed again. Otherwise the wall loses its fire resistance.

DIY guide: repairing a hole in plasterboard

You can repair a hole left by a wall plug or by a door handle yourself, well enough that it disappears after painting. Have plasterboard filler, reinforcing tape, an offcut of new board of the same thickness and fine sandpaper ready.

  1. Clean loose edges from small screw and plug holes, fill them with plasterboard filler and sand once dry.
  2. For a larger hole, cut the damaged area back to a neat rectangle with a sharp knife or a plasterboard saw.
  3. Insert two strips of timber or offcuts of channel into the opening and screw them to the surrounding board as a backing.
  4. Cut a patch from new board of the same thickness to fit the opening exactly and screw it to the backing.
  5. Cover the joints around the patch with reinforcing tape and apply filler.
  6. Once dry, apply a second, wider coat of filler so that the patch blends smoothly into the surrounding surface.
  7. Sand with fine sandpaper, dust off and prime.
  8. Paint the whole wall, or at least the area from corner to corner, so that no difference in shade shows.

How to check plasterboard work on handover

  • Walls and ceilings are flat, which you can check with a straightedge and with light falling from the side
  • Joints and screws do not show under the paint and the jointing matches the agreed finish level
  • Edges are straight and protected with corner beads
  • Junctions with masonry, ceiling and floor are closed with a flexible seal and free of cracks
  • Access panels are fitted wherever valves, services or ventilation will need to be reached
  • You have photographs of the services and reinforcements taken before they were covered, ideally with measurements
  • For wiring in the walls, you have received the electrician's test certificate
  • For fire-rated constructions, you have received documentation of the manufacturer's system used

Frequently asked questions

A single-layer plasterboard partition costs €23.50 per m² of labour on the current price list. Insulation, corner beads, joint filling and surface finishing are priced as separate items.

Related work

Plasterboard systems
Drywall Partition Walls: Single Layer

How a single layer plasterboard partition is built, when it is enough, what makes the job harder and how to check the finished wall.

Plasterboard systems
Gypsum Board Ceiling and Suspended Ceiling Installation

How a flat gypsum board ceiling or suspended ceiling is installed, which boards to choose, what makes the job harder and how to check the result.

Plasterboard systems
Installation of Acoustic/Thermal Insulation

How mineral wool is fitted into plasterboard partitions, wall linings and lofts, which material to choose and how to check the finished work.

Plasterboard systems
Double-layer plasterboard partition: method, materials and checks

How a double-layer plasterboard partition is built, when it beats a single-layer wall, which mistakes to avoid and how to check the finished wall.

Plasterboard finishing
Installation of Bespoke Window Finishes for Curtains or LED Strips

How a plasterboard curtain pocket or LED recess is built, what to sort out before work starts and what to check when the job is handed over.

Plasterboard systems
Gypsum Plasterboard Furring Wall Installation (without Insulation)

How a plasterboard furring wall without insulation is built, when it makes sense, which studs and boards to choose and what to check on the finished wall.

Plasterboard systems
Installation of Suspended Ceiling (Including Grid System)

How a suspended ceiling with a metal grid is installed, which tiles and grid to choose, what makes the job harder and how to check the finished ceiling.

Plasterboard systems
Installation of Plasterboard Sloped Surfaces and Ceilings in Attics

How plasterboard sloped ceilings and flat ceilings are fitted in an attic, what goes into the build-up, where mistakes happen and how to check the work.

Plasterboard systems
Plasterboard Partition with Knauf Diamant Boards (Impact Resistance and Acoustics)

How a Knauf Diamant partition is built for a harder, impact-resistant surface and better sound insulation in bedrooms, children's rooms and hallways.

Plasterboard finishing
Fitting a Door Frame into a Drywall Partition - UA Profile Reinforcement

How a door opening in a plasterboard partition is reinforced with UA profiles, what to watch out for and how to check the finished work.

Plasterboard finishing
Installation of Shelves, Niches, or Other Recesses into Drywall

How a niche or built-in shelf is made in a plasterboard wall, what decides how much it can hold, and what to watch for in bathrooms and with lighting.

Plasterboard finishing
Cutting Holes for Luminaires, Speakers, etc. - up to Ø15 cm

How holes for downlights, speakers and boxes are marked out and cut in plasterboard, what to watch out for and how to check the finished work.

Plasterboard systems
Plasterboard Partition with Rigips Habito Boards (High Load-bearing Capacity)

How a Rigips Habito partition is built, how it lets you hang a TV, kitchen units or shelves straight into the board and how to check the result.

Blog