Building work price list: Designer Polyurethane Poured Resin Flooring
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Specialist flooring cost | ||||
| Polyurethane decorative poured floor | m² | €55.00 / m² | m² | enter quantity- |
| Dry screed installation up to 200 mm - expanded clay | m² | m² | - | |
| Installing Rigidur gypsum fibre floor panels, adhesive-bonded | m² | €12.50 / m² | m² | enter quantity- |
| Epoxy poured floor up to 4mm | m² | m² | - | |
| Epoxy poured floor with Terrazzo/Marble pattern | m² | m² | - | |
What poured polyurethane flooring is and where it suits
It is often simply called a designer resin floor or a seamless resin floor. The installer pours the resin onto a prepared base, where it cures into one continuous surface. Homeowners choose it for living rooms, kitchens, children's bedrooms and offices when they want a floor without joints that also feels more comfortable underfoot than tiles or epoxy. It is one of several finishes covered under flooring work.
The item usually covers the whole system: subfloor preparation, primer, a polyurethane base coat, the decorative layer and a final protective sealer. Total thickness is typically around 2 to 3 mm, depending on the system. The resin itself therefore barely changes the floor height, and doors often do not need trimming. If the subfloor needs a self-levelling compound, its thickness is added on top.
Why polyurethane rather than epoxy? Epoxy is harder and better suited to garages, workshops and stores, as with an epoxy resin floor up to 4 mm. Polyurethane is more elastic, gives slightly underfoot, feels warmer to the touch and sounds less hard when walked on. That is why it is used mainly in living spaces. The thin layer reduces footstep noise within the room, but impact sound to the neighbours below is only dealt with by a correct floor build-up with acoustic insulation.
It works well with underfloor heating because it is thin and heat passes through it with little loss. Tell the contractor about the heating in advance so they can choose a suitable system and heating start-up schedule.
What to decide before ordering
A poured floor cannot be tried out and adjusted later like laminate. Most decisions have to be made beforehand, because changes after pouring are difficult.
- What is under the floor: a new sand and cement screed, an anhydrite (calcium sulphate) screed, old tiles, or old vinyl or carpet. The whole preparation depends on this. Soft coverings and loose layers are always removed, as a poured floor needs a sound mineral base. If a dry system such as Rigidur dry screed floor panels is planned, check with the resin system supplier whether it is approved as a substrate.
- Subfloor moisture: a new screed must dry out sufficiently, which takes weeks at normal thickness. In a house without a damp-proof membrane against ground moisture, this must be resolved before choosing the floor, because rising moisture is a common cause of debonding.
- New screed with underfloor heating: check whether the commissioning (heat-up) cycle has been completed. Without it the screed does not dry evenly and the floor cannot be poured safely.
- Movement joints: find out where they are in the subfloor. They will remain visible in the finished floor. If they bother you visually, discuss their position with the contractor, not leaving them out.
- Colour, effect and sheen: choose from a physical sample made by the contractor, not from a photo online.
- Edge detail at walls: whether the floor finishes against a skirting board, is coved up the wall as a resin skirting, or continues onto stairs. Each detail is separate work.
- Thresholds to other rooms: if the resin floor meets timber flooring or tiles, agree the height and type of threshold in advance.
In a block of flats it is sensible to inform the managing agent or freeholder in advance, mainly because of the noise from grinding. Many leases also contain clauses about hard floor finishes, so check yours. A new floor finish alone is not usually a structural change. If the floor build-up or the structure is being altered, check the requirements of the local building regulations.
Surface options and when to choose each
- Single colour in grey, beige, sand or anthracite. Calm, timeless and the least technically demanding.
- Metallic effect with depth that changes with the light. It suits showpiece rooms, but every result is slightly unique and harder to predict exactly.
- Pattern or imitation of concrete or stone. It is done by hand on site, so ask to see a sample from the specific contractor. For a marble or terrazzo look, a terrazzo or marble-effect epoxy resin floor is a related option.
- Matt or satin sealer shows less dust, footprints and fine scratches. With dogs or children it is the more practical choice.
- Gloss sealer looks striking, but shows every mark and can be slippery when wet.
- Anti-slip finish makes sense in kitchens, entrance halls and bathrooms.
With a light-coloured floor, ask whether the top sealer is UV stable. Some polyurethanes yellow in sunlight over time, often unevenly depending on where rugs or furniture stood. More resistant systems keep their colour. This matters especially with large south-facing windows and glazed walls.
How the work is carried out, step by step
In a typical room the work usually takes several days, because each layer has to cure. The process is roughly as follows:
- Subfloor assessment: strength, flatness, cracks and moisture. Moisture is measured with an instrument, often by the carbide (CM) method. For a cement screed a maximum of around 2 % CM is commonly required, for anhydrite around 0.5 % CM, and even less with underfloor heating. The binding limit is set by the system manufacturer.
- Grinding and cleaning: the surface is ground and residues of adhesives, coatings, oil and grease are removed. Everything is then thoroughly vacuumed.
- Repairs: cracks and damaged areas are repaired and, if needed, the subfloor is levelled with self-levelling compound. On old tiles the grout joints are filled.
- Masking: door frames, the base of walls and thresholds are taped so the resin does not get where it should not.
- Priming: a primer is applied to consolidate the surface, reduce absorbency and improve adhesion.
- Base coat: the polyurethane compound is poured at the specified thickness and de-aerated with a spiked roller so no bubbles remain.
- Decorative layer: single colour, pigmented, metallic or patterned. It is applied within the recoat window specified by the manufacturer.
- Protective sealer: once cured, the sealer is applied in the chosen sheen, with an anti-slip additive where required.
- Finishing: movement joints are cut through and filled with a flexible sealant, edges are tidied and the tape is removed.
- Curing: the floor can usually be walked on after about one day, furniture and full loading only after several days, as per the manufacturer.
Uncured polyurethane contains isocyanates. These irritate skin and eyes, and inhaling them can cause respiratory sensitisation, which may show as asthma-like symptoms even on later contact. Installers therefore work with gloves and respiratory protection. During pouring and curing the room must be ventilated, and children, pets, pregnant women, allergy sufferers and people with respiratory conditions should stay out of the home, or at least out of the affected rooms. The fully cured floor no longer smells.
What affects the price
The guide labour price is €55.00 per m². It is an indicative figure for a typical scope. Whether a contractor includes materials, subfloor preparation and sealer in the rate per square metre or prices them separately varies between quotes, so always ask for a breakdown.
- Subfloor condition: the biggest price difference. A new, flat, dry concrete screed or sound anhydrite in a new build only needs grinding, vacuuming and priming. Old tiles that need grinding, grout filling and levelling, or a friable, greasy or damp base, can raise the price considerably, sometimes by more than the resin layer itself.
- Levelling: if the floor is uneven, self-levelling compound is added. It is a separate step with its own materials and drying time.
- Area: on a small area the preparation, equipment and travel are spread over few square metres, so the rate per m² is higher. A large continuous area works out cheaper per metre.
- Design: a single colour is the simplest. Metallic effects, patterns or concrete and stone imitations are done by hand and need experience, so they are noticeably more expensive.
- Sealer and additives: anti-slip additive, UV-stable sealer or extra sealer coats raise the price slightly.
- Room layout: alcoves, thresholds, narrow corridors and many door frames slow the work compared with one large rectangular room.
- Details: wall junctions, coved skirtings or poured stairs are usually priced separately, often per running metre or per piece.
- Removing old coverings: breaking out tiles, lifting vinyl or carpet and waste removal are not part of the resin floor itself.
Two quotes with different totals often differ in what the contractor has included. Compare like for like: materials, preparation, primer, all layers and the final sealer.
What makes the work easier and what delays it
Poured floors are sensitive to site conditions. The programme easily slips if the room is not ready.
- Cleared room: in an occupied home everything must be cleared out and protected. Any furniture left behind slows the work and risks collecting grinding dust.
- Other trades finished: painting, plastering, electrical and plumbing work should be complete. Dust and paint drips on fresh sealer cannot be removed without trace. Skirting boards and kitchen units go in only after curing.
- Stable temperature and humidity: typically a room and subfloor temperature of about 15 to 25 °C and relative humidity up to about 75 % are required. In the cold the resin cures more slowly, while high humidity and sudden temperature changes risk blotches and dull patches. The exact range is given by the system manufacturer.
- Power and access: the grinder and vacuum need a working socket, and the contractor needs clear access to the room and space to store materials.
- No foot traffic: nobody may enter the room during curing, pets included. If the room is the only route through the home, sort this out in advance or pour in stages.
- No dust or draughts: ventilate, but avoid draughts that carry dust and insects onto the wet surface.
Typical mistakes and how they show later
Underestimating the subfloor. Dirt, dust or moisture later show as bubbles, peeling and cracking. Moisture from below is a common reason for debonding and often appears only after weeks.
Missing or weak priming. An absorbent base pushes air into the fresh layer, leaving small craters and pinholes on the surface. Adhesion may also be poorer.
Wrong layer thickness. A thinner layer is less durable and wears through sooner.
Ignoring the recoat window. Every system specifies a minimum and maximum waiting time before the next layer. If the next layer goes on too early, the one below is not firm enough and blotches and patches appear. If the wait is too long, the new layer will not bond to the cured one and may peel later. Once the interval is exceeded, the lower layer must be abraded and cleaned.
Ignoring movement joints. Movement joints in the subfloor must be carried through into the resin layer, otherwise the floor will tear above them. The crack is then straight and follows the joint below exactly.
Unrepaired cracks in the subfloor. The resin layer is thin, so a crack in the base will eventually telegraph through to the surface.
Heating left on during pouring. Underfloor heating is usually switched off at least 1 to 2 days before application so the base is at a similar temperature to the air. It stays off throughout curing and is then brought back gradually as per the manufacturer. A warm base speeds up setting and encourages bubbles, while rapid heating after pouring can cause cracking and peeling.
Unsuitable finish. A gloss floor without anti-slip in an entrance or bathroom is an unnecessary slip risk.
Loading too early. Furniture placed on an uncured floor leaves marks. Early wet mopping or taping over the fresh floor is equally damaging.
How to inspect the finished floor at handover
Look at the floor under raking light, ideally with a lamp held low to the ground, and walk across it barefoot or in socks.
- the surface is continuous, without bubbles, craters or visible joints,
- colour and sheen are even, without blotches or streaks under raking light,
- no hairs, dust or insects are trapped in the surface,
- edges at walls, door frames and thresholds are neatly finished,
- door frames, walls and radiators are free of resin,
- movement joints have been kept and filled,
- the floor is flat, without noticeable waves under a straightedge,
- the anti-slip finish is where it was agreed,
- the contractor has given you details of the system used, loading times and the heating start-up,
- you have received cleaning and maintenance guidance.
Frequently asked questions
As a guide, €55.00 per m². The price is affected most by the subfloor condition, any levelling, the area and the chosen design. A single colour on a new, flat screed works out cheaper than a metallic effect over old tiles.
Often yes, provided the tiles are firmly bonded and do not sound hollow when tapped. They are ground, the grout joints are filled, and the surface is levelled and primed. Loose tiles must be removed first and the area repaired.
Yes, if there is a working waterproofing layer beneath it and the surface has an anti-slip finish. The resin layer itself does not replace tanking. The waterproofing must be compatible with the system, ideally part of it from the same manufacturer. Polyurethane poured over any random tanking compound may debond. A matt or lightly textured finish is usually chosen for bathrooms.
A vacuum cleaner or mop with lukewarm water and a pH-neutral cleaner is enough. Harsh and abrasive products can dull the sealer, so check the manufacturer's guidance, for example before using a steam mop.
It holds up well in normal use, but grit under shoes, claws or dragged furniture can leave fine scratches. Felt pads, soft castors on chairs and a doormat at the entrance help. A worn surface can usually be refreshed with a new coat of sealer.
It can usually be walked on after about one day, with furniture and full loading only after several days. Exact times depend on the system and room temperature, so follow the contractor's instructions.
For designer floors in living spaces it is not a suitable DIY job. The two-component resin must be mixed precisely and worked within a short time. Once cured, mistakes can only be corrected by grinding and applying a new layer. Because of the isocyanates, respiratory protection, gloves and goggles are needed. Without experience and mechanical grinding of the subfloor, the risk of bubbles, blotches and peeling is high.
Related work
How a thin poured epoxy floor up to 4 mm is laid, which subfloors suit it, the surface options and what to check at handover.
How a poured epoxy floor with a terrazzo or marble effect is made, what the subfloor needs, where mistakes happen and how to check the finished floor.
How a Rigidur dry screed floor is installed: levelling fill, edge strips, bonded joints, typical mistakes and checks before laying the floor covering.
How a dry screed of expanded clay fill and Rigidur boards is laid to level, when it makes sense instead of a wet screed and what to check afterwards.
What does fitting laminate, vinyl, wood or carpet cost per m² in 2026? Labour price list, subfloor preparation and a quick estimate in the NUMIQ calculator.
When to grind a concrete subfloor before new flooring, how the job is done, what makes it harder and how to check the surface is ready.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.