Price list 2026 · Europe

Epoxy Resin Floor up to 4 mm

An epoxy resin floor up to 4 mm is a thin, seamless layer of resin and hardener laid on a sound, dry base. It costs roughly €60.00 per m², depending mainly on the condition and moisture of the base and the chosen finish.

Updated 09/2026·11 min read·5 price list items
Standard labour price
€60.00/ m²
Indicative range
€48.00 - €78.00
60 m² flat
€9000.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Epoxy Resin Floor up to 4 mm

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Flooring5 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Specialist flooring cost

Epoxy poured floor up to 4mmm²€60.00 / m²m²enter quantity-
Dry screed installation up to 200 mm - expanded claym²m²-
Installing Rigidur gypsum fibre floor panels, adhesive-bondedm²€12.50 / m²m²enter quantity-
Polyurethane decorative poured floorm²m²-
Epoxy poured floor with Terrazzo/Marble patternm²m²-
Total labour
- enter quantity
Create quote from price list →

What a thin epoxy floor is and where it is used

A mix of resin and hardener is poured or trowelled onto a sound base and cures to a hard surface. It suits people who want a tough, easy-to-clean floor but cannot raise the floor level by more than a few millimetres. Typical rooms are a garage, cellar, plant room, hallway or kitchen during a refurbishment, where door linings, doors or kitchen units are already fitted. Among the options in flooring work, it is one of the thinnest hard-wearing finishes.

The thin layer copes with normal foot traffic, a parked car, oil, road salt and cleaning products. The surface has no joints, so dirt does not collect and water cannot get into gaps. It works well in garages, workshops, boiler rooms and entrance areas, and also in showrooms and offices.

Epoxy does not level or strengthen a floor on its own. It follows whatever is underneath. If the screed is uneven, the finished floor will be uneven too, only glossier. That is why the condition of the base matters before any colour is chosen.

When a thin coating is not suitable and what to decide before ordering

Epoxy is rigid and cannot absorb movement in the base. If the screed moves or cracks, the cracks will eventually show through the new layer. In old cellars without a damp-proof membrane, rising damp can push the epoxy up into blisters. Standard epoxy yellows over time in direct sunlight, so a UV-resistant topcoat is used next to large glazed areas. For living spaces where a softer, quieter surface is wanted, polyurethane poured resin flooring is sometimes a better choice, as it is slightly more flexible.

Before ordering, it helps to be clear on the following:

  • What the floor will sit on: concrete, sand and cement screed, calcium sulphate (anhydrite) screed, old tiles or an old coating. All the preparation depends on this. If the base needs rebuilding, for example with a dry screed system using Rigidur floor panels, check with the resin manufacturer that the system is approved for that substrate.
  • Moisture in the base: a new screed must dry out first. In an old cellar, find out whether there is a damp-proof membrane under the floor.
  • How the room will be used: slippers, wet footwear, a car, oils and chemicals. The anti-slip finish and topcoat are chosen accordingly.
  • Height and transitions: even a few millimetres matter at doors, thresholds and where the floor meets the next room. Agree in advance how edges and transitions will be finished.
  • Colour and sheen: colours are usually chosen from the RAL chart. Look at the sheen on a physical sample, not only in a brochure.
  • Flats and shared buildings: if the floor is in a cellar or garage in a block of flats, tell the managing agent or residents' association in advance. Fumes and odour can spread into common areas.

How the floor is laid step by step

Preparing the base takes longer than pouring. It decides whether the layer will later peel off.

  1. Assessing the base. The installer checks strength, cracks, flatness and moisture. Most manufacturers require a cement screed to be at roughly 4 % moisture or less by the carbide (CM) method, and a calcium sulphate screed considerably less. Moisture is measured, not guessed. In a cellar at risk of ground moisture, it is also necessary to check whether damp is rising from below. If this cannot be prevented, a system designed for damp substrates is used.
  2. Mechanical preparation. The base is ground, scarified or shot blasted. Adhesive residues, paint, grease and any weak surface layer are removed. The aim is a clean, slightly roughened surface. Larger irregularities are levelled beforehand with a levelling compound, not with a thick layer of epoxy.
  3. Crack repairs. Cracks and loose areas are repaired before priming. Movement joints are marked so they can be carried through into the new layer.
  4. Dust removal. After grinding, the floor is thoroughly vacuumed with an industrial vacuum. Fine dust is one of the main causes of peeling.
  5. Priming. An epoxy primer is applied to the dry base. It consolidates the surface, evens out absorbency and forms a bonding layer. On absorbent bases two coats are sometimes needed.
  6. Mixing. Resin and hardener are mixed in the exact ratio stated by the manufacturer, using a slow-speed paddle mixer until the mix is uniform. The pot life must then be respected, otherwise the mix starts to set in the tub.
  7. Application. The mix is spread in sections with a notched trowel or a smoothing trowel. Sections are joined wet on wet so that no visible lap lines appear.
  8. De-aeration. A spiked roller is used on the still-liquid layer to release air bubbles.
  9. Surface finish. If an anti-slip finish or decorative flakes have been agreed, they are broadcast into the wet layer. Once cured, the excess is removed and, depending on the system, a topcoat is applied.
  10. Curing. The floor can usually take light foot traffic after about 24 hours. Full loading is normally possible after several days, often around a week, depending on the manufacturer and temperature. Until then it must be protected from dust, water and heavy objects.

Uncured epoxy irritates the skin and can cause allergies. Gloves and safety glasses are worn during the work and the room is ventilated.

Surface options and when to choose each

  • Single colour. The most common choice, with colours usually taken from the RAL chart. A gloss finish looks clean but shows scratches and dust more. A matt or satin finish is more practical at home.
  • Anti-slip finish. Fine quartz sand or another aggregate is broadcast into or mixed into the layer. It suits garages, workshops and entrance halls where people walk in wet shoes. The coarser the texture, the safer it is, but it is slightly harder to clean.
  • Decorative flakes (chips). Coloured flakes are scattered into the wet layer and sealed with a clear topcoat. The result looks a little like terrazzo and hides light dirt well. For a true stone look, see the terrazzo or marble-effect epoxy resin floor.
  • Metallic effect. Metallic pigments create a glossy surface with depth. It looks striking, but it demands real skill from the installer and every floor turns out slightly different.
  • Colour zones and markings. In commercial premises, safety lines, parking bays or a company logo can be marked out.

When choosing the colour, think about use as well. Light shades make a room look bigger, while dark and grey shades hide dirt better. That is why grey is the most common choice for garages.

What affects the price

The guide price for labour is €60.00 per m². It assumes a sound, dry and flat base and a standard single-colour finish. A large rectangular room on such concrete works out cheapest. The final figure is mainly affected by the following:

  • Old layers: paint, adhesive or tiles must be removed or thoroughly ground. That means more machine work and more waste. Preparation can take up to twice as long.
  • Repairs: cracks, loose areas and uneven patches must be repaired and levelled. Each repair is an extra step with its own drying time.
  • Moisture: a damp base means waiting or using a special damp-tolerant primer, which costs more than a standard one.
  • Floor area: a small area, such as a boiler room, costs more per m². Preparation, bringing machines to site and mixing take almost as long as on a larger floor.
  • Room shape: many corners, columns and transitions add hand work.
  • Surface finish: anti-slip aggregate, flakes, metallic effect and topcoats, including a UV-resistant coat, mean extra layers and waiting time between them. The metallic effect is one of the most expensive options.
  • Temperature: a cold room must be heated in advance so the epoxy cures properly.
  • Skirting and edges: if the epoxy is to be taken a little way up the wall as a coved skirting, this is usually priced as a separate item.

When comparing quotes, check whether the price includes grinding, crack repairs, priming and topcoat, or only the poured layer itself.

What can be prepared in advance and what delays the work

Epoxy is sensitive to dust, cold and disturbance while it sets. Site organisation therefore affects the result more than with other floors.

  • An empty room: the room must be completely cleared, including shelving, tools and the car. A continuous pour is not possible around anything left standing. The area under it then has to be done separately and a visible joint will remain.
  • Other trades finished: decorating, sanding and chasing nearby must be completed. Dust from the next room will settle in the wet layer.
  • Heating in advance: the room and the base should be heated a day or two before the work, not only on the day of the pour. Heating must also continue during curing so the base temperature does not fall below the manufacturer's minimum. If there is underfloor heating, it is switched off during pouring and curing and the room is kept warm with another source, such as a radiator or heater.
  • Power and water: the grinder and industrial vacuum need a working socket on a suitably rated circuit. Water is needed for cleaning tools.
  • Access and closing off: nobody, including pets, may enter the room while it cures. If the work is in a hallway or garage used as a way in, arrange another entrance to the house.
  • Ventilation without draughts: the room must be ventilated because of fumes, but without strong draughts. These carry dust and cool the surface.
  • Time: allow for several days when the room cannot be used. For a garage, arrange somewhere to park the car for at least a week.

Common mistakes and how they show up later

Most defects do not appear straight away but after a few weeks or months. These mistakes come up again and again:

The base is not properly cleaned. Dust, grease or a weak screed surface cause peeling and blisters. In a garage this often shows where the car stands and hot tyres stress the surface.

Wrong mixing ratio. The mix does not fully cure and stays soft or tacky. Such areas can only be repaired by removing them.

No de-aeration. Small craters and pinholes remain in the surface and trap dirt.

Unsuitable conditions. In the cold, epoxy cures slowly and unevenly. In high humidity a milky bloom or a sticky surface can appear. The base temperature should usually be at least 3 °C above the dew point.

Unrepaired cracks and ignored movement joints. Cracks in the base must be repaired, otherwise they will appear in the epoxy. If the movement joints in the screed are not carried through into the new layer, the floor will crack exactly above them.

Moisture from below. This comes from an unprotected cellar or a screed that has not dried. Over time blisters appear that fill with water when pierced, and the layer peels away.

Levelling with thick epoxy. Irregularities are filled with a thicker layer of resin instead of a levelling compound. The layer then varies in thickness, cures unevenly and leaves ripples on the surface.

Loading too early. Furniture, a car or wet cleaning too soon after the pour leave marks.

How to check the finished floor at handover

  • the surface is continuous, with no blisters, craters or peeling areas,
  • tapping does not produce a hollow sound anywhere,
  • colour and sheen are even, with no visible joints between sections - this is easiest to see with a torch held low over the floor,
  • the surface is not tacky or soft after the time stated by the manufacturer,
  • no hairs, dust or insects are trapped in the surface,
  • edges at walls, door linings and thresholds are neatly finished,
  • movement joints have been kept and filled,
  • the anti-slip finish, if agreed, is evenly spread over the whole floor,
  • walls, door linings and doors are free of epoxy splashes,
  • information has been provided on the system used, the time to full loading and the recommended cleaning.

DIY guide: epoxy in a small garage or cellar

A competent DIYer can handle a small area on sound, dry concrete without cracks, provided the manufacturer's instructions are followed to the letter. The hardest part is grinding the base, which needs a hired concrete grinder with dust extraction. With a damp base, old coatings, cracks or decorative finishes such as a metallic effect, it is wiser to call in a specialist. Work in gloves and safety glasses with good ventilation. Uncured epoxy must not come into contact with skin.

  1. Clear the room and heat it to the temperature specified by the manufacturer.
  2. Check the moisture of the base. A sheet of polythene taped down for a day gives a rough indication: if it is damp underneath, do not pour. Only measurement is reliable.
  3. Grind the whole floor and remove grease stains and weak spots.
  4. Vacuum with an industrial vacuum until a hand run across the floor picks up no dust.
  5. Apply the primer as instructed and leave it to dry for the time stated by the manufacturer.
  6. Plan the work so you can back towards the door and do not trap yourself in a corner.
  7. Mix only as much as can be used in time, in the exact ratio, with a slow-speed mixer.
  8. Spread the mix in sections with a notched trowel, joining them wet on wet.
  9. Go over it with a spiked roller while wearing spiked shoes.
  10. Close off the room and leave it to cure. Bring the car back only after the time given by the manufacturer.

Frequently asked questions

Roughly €60.00 per m². The price is affected most by the condition of the base and the chosen finish. More detailed factors are listed in the price section above.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.