Building work price list: Installation of Dry Screed (Keramzit + Rigidur Boards) to Level
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Specialist flooring cost | ||||
| Dry screed installation up to 200 mm - expanded clay | m² | €18.00 / m² | m² | enter quantity- |
| Installing Rigidur gypsum fibre floor panels, adhesive-bonded | m² | €12.50 / m² | m² | enter quantity- |
| Polyurethane decorative poured floor | m² | m² | - | |
| Epoxy poured floor up to 4mm | m² | m² | - | |
| Epoxy poured floor with Terrazzo/Marble pattern | m² | m² | - | |
What a keramzit and Rigidur dry screed is and when it suits
It is a base for the floor finish that is built entirely dry. A lightweight granular fill is poured onto the floor structure, screeded level, and floor boards are laid on top, glued and screwed at the joints. Nothing is mixed or poured, and the floor carries far less load than with a concrete screed. A dry screed is not a wearing surface. A floor covering always goes on top. Within flooring work it is the levelling stage that comes before the finish.
It makes most sense where a wet screed would cause problems:
- Timber joist floors: they tolerate neither moisture nor heavy loads.
- Older blocks of flats: there is no need to overload the floor, and several weeks of waiting for a screed to dry are avoided.
- Loft conversions: materials are hard to carry up and mixes are awkward to prepare.
- Uneven floors: the fill can take up even large differences in level.
Expanded clay also slightly improves thermal and sound insulation, which helps above an unheated cellar or in a flat above neighbours. The system takes laminate, vinyl, engineered or solid wood, carpet and ceramic tiles. In rooms with permanent moisture or high point loads, a dry screed should not be used without consulting the manufacturer.
Dry screed build-up: fill, Rigidur boards and variants
The build-up has several layers:
- Separating layer: on a concrete slab usually a polythene sheet to protect against residual moisture, on a timber floor paper or fleece so that the fine granules do not run through the gaps.
- Perimeter edge strip around the whole room.
- Levelling fill of expanded clay, i.e. fired clay. It is light, non-combustible and has low water absorption, although as a porous material it can take up some water.
- Rigidur floor boards made of gypsum and cellulose fibres. The elements are usually around 20 to 25 mm thick and often consist of two layers bonded with an offset, which forms a rebate or tongue on the edges.
Dry screed manufacturers specify their own system levelling fill with a defined grading and properties. Ordinary garden or building-grade expanded clay has coarser granules, cannot be screeded flat and shifts under the boards. If the installer uses a non-system fill, the board manufacturer may reject a warranty claim and the guarantee on the build-up may be void. Ask in advance which fill will be used and have it written into the quote.
This work appears in the price list under two names: "Dry screed - keramzit + Rigidur" and "Installation of Liapor dry screed + bonding Rigidur boards to level". Liapor is a brand name for expanded clay, so technically it is the same system. The difference is usually in what exactly the installer includes in the item. When comparing quotes, check:
- what fill depth the quote allows for and what happens if more is needed,
- whether the separating layer, edge strip and screws are included,
- which type of floor element will be used and whether the joints are both glued and screwed,
- whether sanding of joints and preparation for the specific floor finish are included.
How much a dry screed weighs and how much fill is needed
Fill consumption is easy to estimate: each centimetre of depth needs roughly 10 litres of material per m². A 5 cm layer therefore needs about 50 litres per m², plus an allowance for the grooves left by the screed rails and for wastage. Bags are usually sold by the litre, so the calculation is simple.
Weight is the main reason a dry screed is chosen for old floors. Expanded clay fill weighs only a few kilograms per m² per centimetre of depth, and floor boards of around 20 to 25 mm roughly 25 to 30 kg per m². The whole build-up with 5 cm of fill comes to roughly half the weight of a cement screed of the same thickness, which weighs over 100 kg per m². The exact values for a given system are stated by the manufacturer, and for an old or damaged floor they should be passed to a structural engineer.
What to decide before ordering
- Finished floor level: usually set by the highest point of the floor structure, above which the minimum fill depth must remain, and by the junction with the hallway, adjoining rooms or balcony doors. This determines the fill depth and therefore the amount of material.
- Type of finish: thin vinyl or large-format tiles need a more accurate level and sometimes thicker or stiffer elements. It is best to know the finish before the boards are ordered. If a seamless poured finish is being considered, such as an epoxy resin floor up to 4 mm, a terrazzo or marble-effect epoxy floor or designer polyurethane poured resin flooring, confirm with both manufacturers whether it is suitable on gypsum fibre boards.
- Services in the floor: water, heating or electrical runs must be finished and tested before the fill goes down. Later they can only be reached by lifting the boards. Electrical work must be done by a qualified electrician. A new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. Gas work may only be done by a Gas Safe registered engineer.
- Door linings and doors: a change in floor level affects whether doors will still open. With new door linings, the fitting height is agreed according to the future floor.
- Bathroom: the position of the shower and waste must be known in advance. A level-access shower on a dry build-up needs a system solution from the manufacturer.
- Sound to neighbours: if there is an occupied flat below, decide in advance whether to add an acoustic board designed for the system.
- Notification and structure: in a block of flats, inform the managing agent or freeholder and check your lease, especially regarding carrying materials and noise. With an old or damaged floor, have the load-bearing capacity assessed by a structural engineer. If the load on the floor changes or the structure is altered, check in advance with your local building control what approval is needed.
Installing a Rigidur dry screed step by step
- Survey and measuring: the installer measures the level differences, assesses the floor structure and agrees the finished floor level and door thresholds with you.
- Preparing the base: the old covering is removed, the floor is checked to be sound and dry, loose material is broken out, larger holes are filled and the base is vacuumed. In homes built before 2000, have suspect materials tested before you drill or demolish. Asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
- Separating layer: polythene on concrete, paper or fleece on timber, always lapped and turned up the walls.
- Edge strip: fixed around the whole perimeter and around risers and pipes so that it stands above the future floor level.
- Level and screed rails: the finished floor level is marked with a laser or spirit level, the board thickness is deducted, and screed rails or battens are set exactly to the fill level.
- Fill: the expanded clay is poured and screeded off along the rails with a straightedge. Whether and how it should be compacted is set out in the installation instructions. Many systems do not call for compaction, and careless treading would spoil the level. Deep layers are built up in stages, and around services the fill is placed and levelled by hand.
- Levelling after the rails: the rails are removed and the grooves are filled and levelled.
- Laying the boards: work starts from the wall opposite the door. The levelled fill is no longer walked on, only the boards already laid.
- Gluing and screwing the joints: system adhesive is applied to the rebate or tongue, usually in two continuous beads along the full length of the joint so that it squeezes upwards when pressed. Boards are laid with staggered joints, and each joint is screwed with system screws or stapled while the adhesive is fresh, at the spacings given in the instructions. Screw heads are sunk just below the surface.
- Finishing the joints: once the adhesive has cured, usually by the next day, the squeezed-out adhesive is scraped off and any high spots are sanded.
- Check and handover: the level is checked with a straightedge, the protruding edge strip is trimmed and a gap is left at the wall, to be covered later by the skirting.
- Preparing for the finish: under tiles the surface is primed with a primer suitable for gypsum fibre boards, and in a bathroom a system tanking membrane follows. Tiles are fixed with a flexible tile adhesive classified to BS EN 12004 (e.g. C2 for demanding substrates) and grouted with a grout classified to BS EN 13888 (e.g. CG2). The maximum tile size and the required element thickness under tiles are set by the board manufacturer. Large formats usually need a thicker or stiffer build-up.
Dry screed price per m² and what it depends on
The guide labour price in the price list is €18.00 per m². The item covers a build-up of up to 20 cm. For a deeper build-up, ask for an individual quote. The same floor area can still cost very different amounts:
- Fill depth: the biggest factor. Each extra centimetre means roughly another 10 litres of material per m², more carrying and, with deep layers, filling in stages. A floor that needs levelling by several centimetres costs noticeably more than an almost flat one.
- Condition of the floor structure: a flat, sound concrete slab is simplest. A timber joist floor, a cracked base or a floor that needs repair first adds work and sometimes separate items.
- Removing the old floor: taking up old screed, tiles or timber flooring and removing the rubble are usually charged separately and can make up a significant part of the budget. Before you hand over renovation rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
- Type of element: standard two-layer boards are cheaper than thicker elements for tiling or elements with bonded insulation.
- Room layout and services: small rooms, recesses, many door openings and pipes in the floor mean more cutting and hand filling. On a small area the price per m² is usually higher.
- Access: carrying bags and heavy boards to upper floors without a lift, or up a narrow loft staircase, takes longer and raises the price.
- Bathroom and wet areas: primer, tanking, sealing tapes and closer screw spacing are extras compared with dry rooms.
- Flatness requirements: large-format tiles or thin vinyl need more precise screeding and more sanding of joints.
What makes the work easier and what slows it down
- Wet trades finished: plastering, skimming and any screed in other rooms should be complete and dry. Gypsum fibre boards do not tolerate prolonged moisture, and high humidity in the property does them no good.
- Empty rooms: once the fill is down, nobody can walk on it or move anything, so the room must be completely cleared, not just half.
- Space for materials: boards are stored flat in a level, dry place, ideally in the property itself so they acclimatise to room temperature. Boards leaned upright against a wall can bow.
- Lift and parking: a booked lift, space to unload in front of the building and, if needed, a skip save hours.
- Power and heat: a working socket is needed for tools. In winter a heated room helps, as adhesive cures more slowly in the cold.
- Clear decisions: when the finish, the door threshold heights and the service routes are known, work does not stop for discussions.
Typical dry screed mistakes and how they show
- Uneven or poorly levelled fill. The board above flexes, joints creak and laminate joints break apart.
- Walking on finished fill or compacting against the instructions. Footprints and pressed areas create hollows that nobody can see under the board.
- Non-system fill. Coarse or unsuitable granules shift under the boards, the floor sinks over time and the board manufacturer rejects the claim.
- Too little or the wrong adhesive. The boards do not act as one, joints move and cracks or raised edges appear under the finish.
- Board joints not staggered. The floor is weaker at the joints and the finish above them cracks.
- No movement gap at the wall. The floor has no room to expand and noise is transmitted into the walls.
- Dust and mortar debris under the separating layer. The fill settles unevenly.
- No separating layer on a timber floor. Fine granules gradually run through the gaps into the floor void and hollows form under the boards.
- Underestimated load-bearing capacity. Even a light build-up has weight, and old timber floors may show deflection.
- Primer or tanking left out under tiles. Adhesive bonds poorly, tiles come loose and in a bathroom water gets into the boards, which soak up moisture and lose strength.
- Services buried without testing. A leak only shows after the finish is laid, and the repair means taking up part of the floor.
How to check the finished dry screed at handover
Before the finish is laid, go over the floor together with the installer. Flatness is measured with a 2 m straightedge. What is checked is the flatness of the base for the finish, not of the final wearing surface. For standard floors a deviation of around 2 mm over this length is usually accepted. If the manufacturer of your floor finish requires a tighter value, as is common with large-format tiles or thin vinyl, its requirement applies. Have the agreed tolerance written into the quote or the handover record.
- the straightedge nowhere shows a gap larger than agreed - check in different directions and along the walls,
- the boards do not flex, rock or creak underfoot, especially at walls, doors and over services,
- joints are staggered and glued, and squeezed-out adhesive has been removed,
- screw heads are sunk and nothing stands proud,
- a movement gap remains around the whole perimeter and around pipes,
- the level at doors matches adjoining rooms and doors will open with the future finish,
- in the bathroom the tanking runs up the walls and corners are reinforced with tape,
- the surface is clean, dry and free of loose granules that would press through the finish,
- the packaging or delivery note shows the system fill and boards that were used.
DIY dry screed: what to watch out for
A competent DIYer can install this floor if the work is done slowly and accurately. The process is the same as above. What matters is the flatness of the fill, not speed. Before starting, read the board manufacturer's installation instructions, because screw spacings, type of adhesive, minimum fill depth and the levelling method differ between systems. Services and the floor structure are not altered, and if there is any doubt about load-bearing capacity, work should not start without a structural engineer.
- Work in strips from the back wall towards the door, so boards can be laid as you go without stepping on finished fill.
- Check the screed rails with a laser or spirit level before filling - an error in a rail carries across the whole area.
- Buy the system fill for the chosen board type and order extra, as running out mid-job brings the work to a halt.
- Apply adhesive in continuous beads and screw while it is fresh, not after it has dried.
- When cutting and sanding boards, wear a dust mask and safety glasses and use a saw or sander with dust extraction, as fine dust is produced.
Frequently asked questions
As a guide, €18.00 per m² for a build-up of up to 20 cm. The final price rises with deeper fill, removal of the old floor, tanking in a bathroom, a complicated layout and carrying materials without a lift. When comparing quotes, check what fill depth and which extras each one includes.
In a typical flat usually a few days, depending on floor area, fill depth and room layout. There is no drying time. The finish can generally be laid as soon as the adhesive in the joints has cured, usually by the next day.
Yes, if the board manufacturer allows it for the build-up. The surface is primed before tiling, tiles are fixed with flexible adhesive, and the manufacturer sets the largest permitted tile size and the required element thickness.
The fill is commonly laid from a few centimetres up to around ten. The minimum and maximum depth are set by the system manufacturer. Very deep layers are filled in stages, or part of the height is made up with thermal insulation.
Expanded clay and the boards reduce impact noise, but the light build-up lacks the mass of concrete. The result depends on the floor structure below and on carefully executed movement gaps at the walls. If the neighbours are sensitive to noise, an acoustic board designed for the system can be added.
Yes, there are dry underfloor heating systems in which the pipes sit in grooved panels beneath the gypsum fibre layer. They must, however, be designed as a complete system to the manufacturer's instructions, not assembled from random components.
The boards can be cut out at the fault, the service repaired, the fill topped up and the opening closed with a new piece of board, glued and screwed to the manufacturer's instructions. This also disturbs the floor finish, which is why services are always tested before they are covered.
Related work
How a thin poured epoxy floor up to 4 mm is laid, which subfloors suit it, the surface options and what to check at handover.
How a poured epoxy floor with a terrazzo or marble effect is made, what the subfloor needs, where mistakes happen and how to check the finished floor.
How designer polyurethane poured flooring is laid, where it works well, what makes the job harder and how to check the finished surface.
How a Rigidur dry screed floor is installed: levelling fill, edge strips, bonded joints, typical mistakes and checks before laying the floor covering.
What does fitting laminate, vinyl, wood or carpet cost per m² in 2026? Labour price list, subfloor preparation and a quick estimate in the NUMIQ calculator.
When to grind a concrete subfloor before new flooring, how the job is done, what makes it harder and how to check the surface is ready.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.