Laying a laminate (floating) floor costs €12.50 per m² of labour on the current price list. A full parquet renovation (sanding, filling and three coats of lacquer) comes to €30.00 per m², and a levelling screed costs €6.90 per m². What really moves the final price is how flat and dry the subfloor is, how the rooms are laid out and how many junctions and details there are. Skirting boards, transition profiles and taking up the old floor are priced separately. Sign in to see the current price.
Types of work and their prices
An affordable floating floor covering with a durable surface. It needs a flat, dry and firm substrate, a suitable underlay and a free expansion gap around the perimeter.
A low build-up height and a pleasant underfoot feel are an advantage in renovations. Because the material is thin it follows every irregularity in the substrate, so the substrate quality is checked especially carefully.
A natural wear layer gives a warm appearance and the option of future renovation. The timber is acclimatised before installation and the conditions in the room must stay stable throughout.
A solid bond to the substrate reduces impact noise and improves heat transfer. It requires a precisely prepared substrate and an adhesive suited to the specific floor covering.
A traditional floor with a long service life. Bonded parquet strips have no click locking; they are joined by tongue and groove or laid flat. After bonding, the adhesive curing time is observed, often 48 hours up to several days, and only then does machine sanding and surface finishing follow.
Suitable for sound parquet without extensive loosening. Sanding is carried out with a drum or belt sander followed by a rotary sander. The filler is mixed with sanding dust, applied over the full area with a trowel and, once dry, sanded again with fine-grit paper. Three coats of lacquer follow: a base coat and two top coats.
Flooring work price list 2026
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
How much it costs by scope
| Laminate on a prepared substrate Installation of 45 m² of laminate, fitting of 30 m of skirting boards and two transition profiles | €698.50 |
| Click vinyl with preparation Priming and levelling of 45 m², vinyl installation, 30 m of skirting boards and two transition profiles | |
| Complete parquet renovation Sanding, filling and three coats of lacquer over 45 m², fitting of 30 m of skirting boards | €1470.00 |
When to do the work
Types of materials and their cost
A durable surface and easy maintenance make this suitable for ordinary living spaces. A damaged wear layer cannot be restored by sanding.
Copes well with everyday moisture and has a low build-up height. It needs a very flat substrate and must be approved for the specific conditions of use.
More dimensionally stable than solid wood, and depending on the product it is laid floating or bonded. The wear layer is usually 2 to 4 mm, so it can only be resanded 1 to 3 times over its service life. Routine maintenance is with a care product or oil, not sanding.
Traditional bonded wood elements that allow repeated renovation. A more demanding pattern increases the number of cuts and the laying time.
These support materials are not chosen in isolation. They must form a compatible system with the substrate, the floor covering and any underfloor heating.
Surface preparation step by step
Before the flooring is ordered, the fitter checks that the subfloor is solid, flat and clean, and works out the finished floor height. Door clearance, the junction with the next room and the height of skirting boards and transition profiles all go into the plan.
A screed is never judged by eye or by how long ago it went down. The fitter measures the moisture with the carbide (CM) method. As a rough guide, a cement screed should usually read no more than about 2% and an anhydrite screed about 0.5%, and lower still with underfloor heating. What the flooring and adhesive manufacturers require always has the final say. A subfloor that is not dry enough is the most common reason for complaints about wood floors.
Old adhesive, soft surface layers and local bumps come off. The subfloor has to be firm and free of anything that would stop the primer or adhesive from sticking properly.
The primer is chosen to suit the type of subfloor and how absorbent it is. Flatness is checked with a two-metre straightedge. A common requirement is 2 to 3 mm over 2 m, and tighter for vinyl. If the subfloor falls short, the fitter applies a levelling screed at the thickness the manufacturer's system calls for.
Before starting, the fitter decides the laying direction, how wide the edge rows will be, how the floor runs between rooms, how stairs are finished and where the perimeter gaps go. That way you do not end up with thin cut strips or joints in awkward places.
Method of work
- 01The fitter measures the net floor area and the perimeter of each room, and counts the doors, alcoves and pipes coming through the floor.
- 02Next comes a check of the subfloor for flatness, strength and residual moisture. The findings are written down before anything covers it.
- 03Any loose or weak layers come off, the surface is vacuumed and, where needed, sanded, primed or levelled.
- 04The flooring is left to acclimatise in the room where it will go, usually 48 hours for laminate and 48 to 72 hours for wood, or whatever the manufacturer specifies.
- 05The fitter marks out the laying direction and pattern. For a floating floor on concrete, a vapour barrier goes down first (0.2 mm PE film, unless the underlay already includes one), followed by a suitable underlay. For a glued-down floor, the adhesive is spread on the subfloor with a notched trowel, not on the back of the planks.
- 06The floor goes down row by row or in the chosen pattern. The fitter keeps checking the joints, the flatness and the expansion gap around the edges, usually 8 to 10 mm from the walls for a floating floor. On large areas the floor is split at doorways.
- 07Neat cuts are made around doors, pipes and fixed fittings, leaving the floor free to move.
- 08Once the floor is down, the skirting boards and transition profiles go on. Skirting boards are fixed to the wall, never through a floating floor into the subfloor.
- 09Finally the room is cleaned and handed over, with advice on loading, cleaning, indoor climate and how to start up underfloor heating for the first time.
- Two-metre straightedge and a wedge gauge for checking substrate flatness
- An instrument for professional measurement of residual screed moisture
- An industrial vacuum cleaner and a sander with dust extraction
- A mixing paddle, buckets, levelling trowels and a spiked deaerating roller
- A mitre or plunge saw with dust extraction, selected according to the type of covering
- Spacer wedges, a tapping block and installation tools recommended by the manufacturer
5 common mistakes
Bumps and dips make the planks flex and creak, and they put extra strain on the click joints. A thicker underlay will not fix an uneven subfloor and can actually make the movement worse.
A screed can feel dry on top and still be wet inside. Sealing it in before it has dried out can damage the wood, the adhesive and the backing of the flooring.
Nothing should pin a floating floor down tight, whether it is a skirting board, door frame, kitchen unit or a screw. The floor needs room to expand and shrink as temperature and moisture change.
What counts is the thermal resistance of the whole build-up, not just the flooring itself. The fitter also checks that the underlay and adhesive are suitable and what maximum surface temperature the manufacturer allows.
If the finished floor height is not settled in advance, doors can catch, a transition profile can leave a ridge and a skirting board may not cover the edge gap. These details get planned before any levelling starts.
Specialist floors and dry construction build-ups
A dry floor made of gypsum fibreboard panels sits loose on a bed of expanded clay granules. The panels come from the factory as two layers with a rebated edge, and they are glued and screwed together without any metal profiles. The clay granules act as insulation, and for underfloor heating in a dry build-up a grooved system board with heat-spreading plates does the job. A poured epoxy or polyurethane floor and an electric heating mat are built up and installed differently. None of these can stand in for an ordinary floating floor. Before you choose, the load-bearing capacity, moisture, available height, expansion joints, heating and how the room will be used all need assessing. That is why the price list shows them as separate items.
Which floor suits which room
You don't choose a floor only by how it looks. What matters more is what will happen in the room. Will people walk in with outdoor shoes? Could water get spilt? Do children or a dog run around the house? Is there underfloor heating underneath? A material that lasts for years in a bedroom can look tired after a few seasons in a hallway or kitchen.
- Laminate: copes well with scratches and is one of the more affordable options. Its resistance to wear is shown by AC classes. AC4 is the usual choice for a home, and a higher class makes sense for busy areas. The core is fibreboard, though, and it swells when water gets into the joints. That is why laminate doesn't belong in a bathroom.
- Vinyl: water doesn't bother it, it is quieter and feels warmer underfoot. How long it lasts depends on the thickness of the wear layer, the clear top layer that takes the traffic. Vinyl with a rigid mineral core keeps its size better. Flexible vinyl follows the subfloor more closely, but it also shows every bump in it.
- Wooden floor: a natural material you can refinish several times. It reacts to air humidity, though, and sharp objects leave marks on it.
- Tiles: very hard-wearing in kitchens, hallways and bathrooms, and they work very well with underfloor heating. They feel cold and hard underfoot.
Do you have large south-facing windows or a conservatory? Floating vinyl heats up and expands in direct sunlight. In rooms like that, fitters often lay vinyl glued over the whole area, so it can't move.
Subfloor: flatness and residual moisture
A good floor is only as good as the subfloor under it. Lay a floating floor on an uneven surface and it will flex and creak underfoot, and the click joints will get damaged over time. Thin glue-down vinyl shows every ripple and every grain of sand. So the fitter checks flatness with a long straightedge. High spots get ground down, and dips get filled with a self-levelling compound.
New screed is full of water, and it takes weeks, sometimes months, to dry out. If wood or a glued covering goes down too early, that moisture moves into the floor. Wood swells, vinyl comes unstuck, and mould can grow under a floating floor. The fitter measures residual moisture directly in the screed using the calcium carbide method, often called the CM test. As a rough guide, wooden floors on cement screed need around 2 % and on anhydrite (calcium sulphate) screed around 0.5 %. With underfloor heating the values should be even lower. The exact limits always come from the manufacturer of the covering and the adhesive.
Laying a new floor over old tiles or an existing floor? First make sure the base is solid and doesn't move anywhere. Deep grout lines in old tiles need filling. Otherwise, after a while, their pattern shows through thin vinyl and you will see it on the floor.
Underlay, vapour barrier and footstep noise
A floating floor needs an underlay. It evens out small irregularities, reduces noise and protects the click joints. On concrete or anhydrite screed, laminate and wood also need a vapour barrier membrane. The fitter overlaps and tapes its joints so it stops moisture rising from below. Some underlays already have a vapour barrier built in. If your vinyl comes with an integrated underlay, don't add another one, because the joints would be overloaded.
In a flat, you also need to think about impact sound, meaning the noise of your footsteps travelling into the flat below. Laminate on a thin underlay sounds hollow and loud, while vinyl and glued floors are quieter. If you're replacing carpet with a hard floor, a good acoustic underlay is worth it. Otherwise, expect complaints from the neighbours downstairs. A thicker underlay isn't automatically better, though. For click vinyl and for underfloor heating, manufacturers specify exact values, and you should stick to them.
Before you start, check your lease or the house rules. In many blocks of flats the lease or the owners' association sets conditions for hard floors, for example a minimum sound insulation or a requirement to ask the building management first. Rules on noisy work hours are also common. If the job goes beyond the floor covering, for example breaking out screed, moving pipes or touching the structure, ask your local building authority beforehand what permission you need.
Floating floor: expansion gaps, transitions and kitchen units
A floating floor isn't fixed to the subfloor. It expands and shrinks with temperature and humidity, so it needs a gap all the way round the room. The skirting board then hides that gap. In long rooms and where the floor narrows, for example in doorways, the fitter adds an expansion joint covered with a transition strip. The manufacturer tells you how long a floor can run without one.
Seamless floors running through the whole home without any strips look clean, and more and more people want them. With a floating floor, though, they only work if the manufacturer allows it for that size of area. Otherwise the floor starts to ripple as it moves, or the joints crack. A floor glued over its whole area doesn't have this limit.
Don't stand kitchen units, fitted wardrobes or a heavy kitchen island on a floating floor. They pin it to the subfloor, and the floor can no longer move freely. You have two options: lay the floor only up to the units and leave the subfloor bare underneath them, or fit the units first and lay the floor up to them with an expansion gap. In practice, a floor often lifts after the first winter right next to heavy furniture.
Underfloor heating and floor coverings
Every floor covering holds back some heat. The more it holds back, the less heat reaches the room, and the hotter the water your boiler or heat pump has to produce. This matters even more with a heat pump, which runs most efficiently at low water temperatures. Manufacturers therefore state whether a covering is suitable for underfloor heating. The total thermal resistance of the covering plus the underlay should be low.
Why do fitters recommend glued floors over underfloor heating? Because there is no air layer between the covering and the screed to slow the heat down. For wood, choose a more stable engineered floor and species that don't twist much as they dry. Beech and maple react more strongly to changes in humidity, so they are less suitable. The surface temperature under a wooden floor shouldn't go above the value the manufacturer gives.
Wooden floor: solid, engineered, lacquer or oil
A solid wood floor is one piece of timber through its full thickness, and you can sand it many times. An engineered floor has a thinner top layer of hardwood on a base layer. It keeps its size better, moves less and also works over underfloor heating. How many times you can refinish it depends on the thickness of that top layer.
Lacquer or oil protects the wood. Lacquer forms a tough film, and the floor is easy to clean. If it gets damaged, though, the repair means sanding and relacquering the whole area, otherwise the patch stays visible. Oil soaks into the wood, gives a matt finish and looks more natural. It does need regular care. Its big advantage: you can sand and re-oil just the damaged spot, and the difference won't show.
Wood moves with the humidity in the air. In winter the heating dries the air and gaps open between the boards, and in summer they close again. When humidity drops well below roughly 40 %, wood can crack. When it is very humid, boards cup. A humidifier in winter does both the floor and you some good.
Restoring old parquet
Old parquet, whether from the 1960s to the 1980s or from earlier decades, is often made of good-quality timber, and after restoration it can look almost new. Before sanding, the fitter checks for loose blocks and glues them back. They also check how much wood is left above the tongue, because that decides how many more times the parquet can be sanded. Gaps get filled with a filler mixed with sanding dust, so it matches the colour of the wood.
Sanding goes step by step from coarse to fine grit. Along the walls and in corners, a smaller edging sander finishes the job. Then the dust gets vacuumed up, a base coat of lacquer or oil goes on, and finally the top coats. Before lacquering, find out what the parquet was treated with before. Old wax and some oils stop new lacquer from sticking and have to come off first.
One safety point for older buildings: parquet was often laid in a black bitumen adhesive, and in some older homes this adhesive can contain asbestos. If you plan to lift blocks or sand down into the adhesive, have a sample tested first. If it contains asbestos, removal is a job for a licensed specialist.
Restoring isn't worth it if the parquet has been sanded down to the tongue, has woodworm, has been wet for a long time or has come loose over a large area. In that case, replacing it with a new floor makes more sense.
DIY guide: repairing scratches and dents in a wooden floor
You can often fix small damage to a wooden floor yourself, without calling a floor fitter. The method depends on whether your floor is oiled or lacquered.
- Find out the finish: on lacquer, a drop of water sits on the surface like a bead, while oiled wood soaks it in slightly after a moment.
- For a dent in oiled wood, for example from something you dropped, lay a damp cotton cloth over the spot and briefly run a hot iron over it. The steam lifts the crushed wood fibres.
- Once it's dry, lightly sand the spot along the grain and treat it with the same oil as the rest of the floor.
- Sand a shallow scratch on an oiled floor with fine sandpaper along the grain and re-oil it. After a few minutes, wipe off the excess oil until the surface is dry.
- Cover a shallow scratch on a lacquered floor with a touch-up pen or wax in the colour of the wood. For deeper damage to the lacquer, sand and relacquer a larger area.
- Stick felt pads under the legs of chairs and furniture, and put a protective mat under your office chair, so the damage doesn't come back.
What to check when you take over the finished floor
- The floor is flat, doesn't flex and doesn't creak or click at the joints when you walk on it
- The board joints are tight, with no raised edges and no gaps
- Skirting boards cover the expansion gap all round, and they are not fixed to the floor
- Transition strips sit firmly and doors open without rubbing
- A glued floor doesn't sound hollow when you tap it
- You have received a record of the subfloor moisture test and care instructions for the finish
- A few boards from the same production batch are set aside for any future repair
Frequently asked questions
Related work
When to grind a concrete subfloor before new flooring, how the job is done, what makes it harder and how to check the surface is ready.
How laminate and other floating floors are laid, what the subfloor needs, which underlay to choose and how to check the finished floor.
How a floating click timber floor is laid: subfloor preparation, underlay, the method, common mistakes and checking the finished floor.
How click vinyl flooring is laid: subfloor preparation, underlay, expansion gaps and trims. Common mistakes and how to check the finished floor.
How to fill the gap between skirting board and wall, when to use acrylic caulk or silicone, and what to check in the finished job.
How skirting boards are fitted, which material and fixing method to choose, and how to handle the expansion gap, corners and uneven walls.
How nailed and bitumen-bonded parquet is lifted, what makes the job harder, and how to clear bitumen residue and prepare the subfloor.
How to lift old parquet without damage, mark every block to a laying plan, then clean and store it so it can be relaid later.
How a subfloor is ground clean of old adhesive and bitumen before levelling, what makes it harder, common mistakes and how to check the result.
How to fit a perimeter expansion strip before pouring levelling compound or screed, which strip to choose and how to check the finished work.
How to prime a floor before levelling, which primer suits which subfloor, when to seal corners and gaps, and how to check the floor is ready.
When self-levelling compound makes sense, how to prepare the subfloor, how to pour it properly and what to check before laying a new floor.
How a thin poured epoxy floor up to 4 mm is laid, which subfloors suit it, the surface options and what to check at handover.
How a poured epoxy floor with a terrazzo or marble effect is made, what the subfloor needs, where mistakes happen and how to check the finished floor.
How designer polyurethane poured flooring is laid, where it works well, what makes the job harder and how to check the finished surface.
How a 20 mm wood fibre underlay board is laid under a new floor, what it does for warmth and footstep noise, and what to watch with the subfloor.
How a Rigidur dry screed floor is installed: levelling fill, edge strips, bonded joints, typical mistakes and checks before laying the floor covering.
How OSB boards are laid on floors: preparing the base, choosing thickness and grade, screwing, expansion gaps and checking the finished work.
How original parquet blocks are lifted, cleaned and relaid, which adhesive suits solid wood and what to check on the finished floor.
How full surface bonding of wood flooring works, what the subfloor needs, which adhesive to choose and what to check when the job is handed over.
How a full parquet restoration works: sanding, gap filling and three coats of varnish. What affects the job, which finish to choose and how to check it.
How a single layer of bitumen membrane is torched onto floors, roofs and walls, which membrane to choose, common mistakes and how to check the work.
How a dry expanded clay levelling fill goes under floor boards, which grain size to choose, what to watch out for and how to check the finished layer.
How a dry screed of expanded clay fill and Rigidur boards is laid to level, when it makes sense instead of a wet screed and what to check afterwards.
How a floor is primed and its edges sealed with acrylic, when you need it, which materials are used, common mistakes and how to check the work.
How parquet blocks are laid and bonded: subfloor preparation, adhesives, patterns, underfloor heating and how to check the finished floor.
How chevron parquet is laid and bonded, what subfloor and adhesive it needs, how it differs from herringbone and how to check the finished floor.
How an electric heating mat goes under tiles: preparation, laying, floor sensor, resistance tests, connection by an electrician, curing times and checks.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.