Terrazzo / Marble-Effect Epoxy Resin Floor

A terrazzo or marble-effect epoxy resin floor is a seamless layer 2 to 4 mm thick, poured directly onto the base. A guide price is €75.00 per m². The price depends mainly on the base and the pattern. Terrazzo is simpler than marble.

Updated 09/2026·13 min read·5 price list items
Standard labour price
€75.00/ m²
Indicative range
€60.00 - €97.50
60 m² flat
€11250.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Terrazzo / Marble-Effect Epoxy Resin Floor

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Flooring5 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Specialist flooring cost

Epoxy poured floor with Terrazzo/Marble patternm²€75.00 / m²m²enter quantity-
Dry screed installation up to 200 mm - expanded claym²m²-
Installing Rigidur gypsum fibre floor panels, adhesive-bondedm²€12.50 / m²m²enter quantity-
Polyurethane decorative poured floorm²m²-
Epoxy poured floor up to 4mmm²m²-
Total labour
- enter quantity
Create quote from price list →

What a patterned poured epoxy floor is and when it suits

This is a decorative floor that imitates stone but has no joints. It is chosen for kitchens, hallways, living rooms, bathrooms and shops where people want the look of stone without grout lines and with easy cleaning. Within flooring work it is one of the most craft-dependent finishes.

The result is not a finished product out of a box. Each floor is created on site and is unique, so much depends on the skill of the floor layer and the condition of the base. Two floors made from the same colours never look exactly alike. A repaired area will not blend in perfectly with its surroundings, even years later. For a plain, single-colour finish, an epoxy resin floor up to 4 mm without a decorative pattern is the more straightforward option.

This floor makes most sense when:

  • You want a continuous surface without joints where dirt and water can collect.
  • You want to link several rooms with one surface, without thresholds between tiles and other floor coverings.
  • You have a sound concrete or sand and cement screed, or firmly bonded old tiles, and do not want to break them out.
  • You are looking for a striking decorative surface that is hard to achieve with laid materials.

It is less suitable if the base is timber or flexes, if moisture rises from it, or if you want a warm, soft surface underfoot. Epoxy feels cooler and hard to the touch, much like stone or tiles. If a softer feel matters, a designer polyurethane poured resin floor is worth comparing.

Terrazzo or marble: the difference and when to choose each

The base is the same for both patterns: a two-part epoxy, meaning resin and hardener, mixed before pouring in the ratio specified by the manufacturer. The difference lies in how the decoration is created.

  • Terrazzo effect is made with coloured flakes (often sold as chips), which are small pieces of plastic, stone or glass. The floor layer broadcasts them into the fresh layer and then seals them with a further coat of epoxy. The pattern looks calm, hides small specks of dirt well and suits busy areas.
  • Marble effect is created by so-called live marbling. Several shades are poured into one layer at the same time and the floor layer blends them into veins with a trowel or brush. It looks luxurious, but every mistake in a stroke shows, so it is a more demanding technique.
  • Metallic pigments are added when you want depth and a pearlescent sheen. They are often combined with marbling.

Think about the lighting when choosing. The same pattern looks different in daylight and under spotlights. It is worth asking for a sample or a trial area and looking at it in the room itself.

For marble, say in advance whether you want fine, sparse veins or a bold, dense pattern. A vague brief such as "like marble" means something different to everyone, and if there is a complaint later there is nothing to compare against. For terrazzo, the density and size of the flakes are what matter. A dense broadcast hides more small specks of dirt, a sparse one looks more delicate.

What to decide before placing the order

A poured floor is difficult to alter once cured. Most things should therefore be agreed in advance, ideally in writing.

  • Pattern and colours. Approve a specific sample or a photograph of the trial area. This then serves as the benchmark at handover.
  • Gloss level. A gloss finish brings out the depth of the pattern but shows scratches and dust. Matt is more practical for hallways and kitchens.
  • Slip resistance. Advisable in bathrooms, at entrances and on stairs, because smooth epoxy is slippery when wet.
  • Floor height. The layer itself is only a few millimetres. If the base needs levelling with a smoothing compound, the floor will rise more. Check that doors will still close and how the transition to the neighbouring floor will look.
  • Finish at the wall. The options are a skirting board, an epoxy skirting turned up the wall, or a coved corner. In bathrooms and kitchens a resin skirting is often chosen so that water cannot get under a board.
  • Underfloor heating. If you have it or plan it, say so in advance, because it affects the choice of system and the schedule.
  • Movement joints. If there are movement joints in the screed, they must be carried through into the epoxy. Agree where they will run so that they do not break the pattern in an awkward place.
  • Timing and access. Nobody may enter the area during pouring and curing. You need to know how you will reach the other rooms and whether the work will be done in stages.

Preparing the base for an epoxy floor

In practice, a handsome pattern often starts to peel or crack after a year. The fault is almost never in the epoxy but underneath it. Epoxy is a thin, rigid layer, so it faithfully follows every movement and every crack in the base.

  • Concrete or sand and cement screed must be sound, dry and free of surface laitance. The permitted moisture content is set by the system manufacturer and is measured before work starts.
  • Anhydrite (calcium sulphate) screed is sensitive to moisture. Its surface usually has a thin smooth layer of laitance that must be ground off, otherwise the epoxy will not bond. Moisture is measured by the CM (carbide) method and the limit is stricter than for cement screed; the exact value is given by the system manufacturer. Only then is a suitable primer applied.
  • Old ceramic tiles can often stay if they are firmly bonded. They are ground, the joints are filled and a primer designed for non-absorbent substrates is used.
  • Timber and OSB bases move with moisture and temperature. A poured epoxy floor is not normally recommended on them, unless the specific system expressly allows it. The same applies to dry screed boards such as those used in a dry screed system with Rigidur floor panels - check with the resin manufacturer first.

The strength of the surface can be checked simply at the survey. If the screed crumbles or dusts when scratched with a key, or if the tiles sound hollow when tapped, expect more thorough repair of the base. A new screed needs weeks to dry, not days. Whether it is ready is decided by measurement, not by eye. Specify the screed flatness class in the contract: SR1 allows a gap of no more than 3 mm under a 2 m straightedge, SR2 5 mm and SR3 10 mm (BS 8204).

If moisture can rise from the base, for example in a cellar or an old house without a damp-proof membrane, it must be dealt with before pouring. Otherwise blisters form under the epoxy. If the floor build-up is also being changed, or the work affects load-bearing structures or common parts of the building, it belongs to a specialist, and in a block of flats it needs the consent of the freeholder or management company. Check with your local building control whether any approval is needed.

How the work is carried out step by step

  1. Measure the moisture and strength of the base and check for cracks.
  2. Grind or plane the base, remove old coatings, adhesives and grease. On anhydrite, grind off the surface layer. In homes built before 2000, have suspect materials, such as old floor adhesives, tested for asbestos before grinding. Asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
  3. Vacuum the area thoroughly with an industrial vacuum cleaner.
  4. Apply a primer that evens out absorbency and consolidates the surface.
  5. Repair cracks and unevenness, and level with a smoothing compound if needed, according to the manufacturer's system.
  6. Respect movement joints around the perimeter and at transitions, and mask walls, thresholds and door frames.
  7. Before each layer, measure the substrate temperature and air humidity and check that the substrate is sufficiently above the dew point.
  8. Mix the epoxy with pigments, pour the base coat with a notched trowel at an even thickness and go over it with a spiked roller to release air bubbles.
  9. For terrazzo, broadcast the flakes into the fresh layer. Once cured, sweep off loose flakes, flood the area with a clear epoxy coat and spike-roll that too.
  10. For marble, pour a layer with several shades and blend them into veins. The spiked roller is not used here, as it would smear the veins. Bubbles are removed with hot air or, carefully, with a flame.
  11. Once cured, apply a protective topcoat in gloss, matt or anti-slip.
  12. Leave the floor to cure and protect it from dust, moisture and loads.

The floor can usually be walked on after about 24 hours. Full loading, such as furniture or rugs, is generally allowed by manufacturers only after about a week. Pouring normally requires a temperature of around 15 to 25 °C and relative humidity below about 75 %. The substrate temperature should be at least 3 °C above the dew point, otherwise moisture condenses on the surface. Exact values are given in the technical data sheet of the specific system.

Mixed epoxy has a limited working time. It is therefore mixed in smaller batches with a low-speed paddle mixer, and the area is poured continuously without breaks.

Uncured epoxy and hardener can cause an allergy on skin contact, which then persists. Operatives therefore wear nitrile gloves and eye protection, and a respirator for longer work in enclosed spaces. There is a strong smell in the room and ventilation is needed. Children, pregnant women and pets should stay out of the home during pouring and the first days of curing.

Epoxy floor price per m²: what it depends on

The guide price for labour in the price list is €75.00 per m². The final cost of a particular floor may differ considerably, depending on these factors:

  • Condition of the base. Level, dry, sound concrete means only grinding and priming. Old adhesives, bitumen from former parquet, cracks or unevenness that need levelling compound add whole stages of work and noticeably increase the price. Dealing with rising moisture is a separate and often more expensive task.
  • Size of the area. Preparation, mixing and cleaning tools take a similar time on a small or larger area. A small hallway or a single bathroom therefore costs more per m² than a large continuous area.
  • Room shape and details. Many corners, door frames, a step, drains, a shower area and transitions to another floor slow the work and raise the price more than their area would suggest.
  • Complexity of the pattern. Single-colour terrazzo is the simplest. Multi-coloured marble, metallic veins or an inlaid logo need more material, more people during pouring and greater skill.
  • Number of coats and type of topcoat. A UV-stable or anti-slip topcoat is an extra layer and an extra day of waiting.
  • Skirting and edge details. An epoxy skirting turned up the wall takes more work than a standard skirting board.
  • Stages. If the area must be poured in sections so the home can still be moved through, there are extra visits and extra work joining the sections.

When comparing quotes, check whether the price includes base preparation, primer, levelling, topcoat and skirting, or only the decorative layer itself.

How to prepare the home before the floor is poured

A poured floor is the last major job in a room and is sensitive both to dust and to people moving around. It helps if the client arranges the following:

  • The area is completely cleared, including furniture, rugs and the contents of cupboards that would be opened during the work.
  • Other dusty and wet trades are finished, such as plastering, the first coat of paint, wall tiling and chasing.
  • Doors are taken off, or it is agreed who will remove and trim them.
  • There is working power for the grinder and vacuum, and access to water for cleaning tools.
  • A steady temperature can be maintained, with heating in cold weather, but without draughts that bring in dust.
  • It is agreed how people will reach the other rooms, and arrangements are made for children and pets during pouring.
  • The managing agent and neighbours know when grinding will take place, as it is noisy and dusty.

The job takes longer if other work is still being finished after pouring. Dust from the next room sticks to the fresh topcoat, and every visit in shoes before curing can mean re-sanding and recoating.

Typical mistakes and how they show up later

Underestimated base preparation. Dust, grease or a damp screed lead to poor adhesion, bubbles and delamination. It often shows only after months, when the layer starts to come away in pieces or sounds hollow when tapped.

Inaccurate mixing. If the ratio of resin to hardener is wrong or the mix is poorly combined, soft and sticky patches remain that will never cure. Such an area has to be removed and poured again.

Unsuitable conditions. In a cold, damp room epoxy cures slowly. If the substrate is too close to the dew point, a greasy film (amine bloom) forms on the surface. The floor turns dull and cloudy, and the next coat bonds poorly.

Bubbles. If the base or clear coat is not spike-rolled, small bubbles and pinholes remain in the floor. With marble the opposite causes damage: a roller used on the finished pattern smears the veins.

A failed marble pattern. The pattern looks random, or a visible line appears where two sections meet. A well-planned pour and enough people to pour the area in one go help.

Movement joints not carried through and cracks not repaired. A crack in the screed will eventually reflect through the epoxy as a straight line across the pattern. The floor will also crack over a movement joint that has simply been poured over.

Poor detailing at walls and drains. In a bathroom, water gets under the skirting or around the drain and the base beneath becomes damp. This shows as discolouration, blisters or a smell.

Smooth topcoat in a wet area. Without an anti-slip finish, a bathroom or entrance floor is dangerously slippery when wet.

Early loading. Laying a rug or moving furniture back too soon can leave permanent marks in the floor.

How to check the finished floor at handover

At handover, look at the floor in daylight and also with a torch held at a low angle. Raking light reveals unevenness that cannot be seen in normal lighting.

  • The surface is continuous, without bubbles, craters, dust particles, greasy film or sticky patches.
  • The pattern matches the agreed sample in colour and in the density of flakes or veins.
  • No visible line shows where sections meet.
  • Edges at walls, door frames and thresholds are clean and the walls have not been splashed with resin.
  • Movement joints are carried through where agreed and neatly filled with a flexible sealant.
  • At drains and in the shower area, water runs in the right direction and does not pond anywhere.
  • The topcoat has the agreed gloss level and an anti-slip finish where it was ordered.
  • The floor does not sound hollow when tapped.
  • Doors open without catching and the transition to the neighbouring floor is smooth.
  • You have received written instructions on curing, cleaning and maintenance, and the name of the system used.

Frequently asked questions

A guide price is €75.00 per m². The final price is mostly affected by the condition of the base, the size and shape of the area, the complexity of the pattern and whether a skirting, anti-slip or UV-stable topcoat is included.