Price list 2026 · Europe

Dry Screed System Installation - Rigidur Floor Panels

A Rigidur dry screed is gypsum fibre floor panels laid on dry levelling fill, with no water. A typical flat takes one to two days. Guide price: €12.50 per m², depending mainly on fill depth and the subfloor.

Updated 09/2026·12 min read·5 price list items
Standard labour price
€12.50/ m²
Indicative range
€10.00 - €16.25
60 m² flat
€1875.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Dry Screed System Installation - Rigidur Floor Panels

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Flooring5 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Specialist flooring cost

Installing Rigidur gypsum fibre floor panels, adhesive-bondedm²€12.50 / m²m²enter quantity-
Dry screed installation up to 200 mm - expanded claym²m²-
Polyurethane decorative poured floorm²m²-
Epoxy poured floor up to 4mmm²m²-
Epoxy poured floor with Terrazzo/Marble patternm²m²-
Total labour
- enter quantity
Create quote from price list →

What a Rigidur dry screed is and when it makes sense

A dry screed system made from Rigidur panels is a base for the final floor covering. It consists of a dry levelling fill and gypsum fibre floor panels. No water is used, so there is no drying time. It is chosen mainly for refurbishing flats and houses, in loft conversions, in timber frame buildings and anywhere a heavy, wet sand and cement screed would cause problems. It is one of several options covered under flooring work.

Why not a traditional screed? A sand and cement or anhydrite screed brings a lot of water into the building and takes weeks to dry. It is also much heavier. A 50 mm cement screed weighs roughly 100 kg per m², while a 25 mm panel weighs about 30 kg per m². An older timber floor or a loft will notice that difference. The laid panels can be walked on during installation, and the floor covering can go down as soon as the adhesive in the joints has cured.

Typical situations where a dry screed pays off:

  • an old house with suspended timber joist floors that a heavy screed would overload,
  • loft conversions and timber frame buildings, where moisture from a wet screed is unwelcome,
  • refurbishing an occupied flat, when there is no time to wait weeks for drying,
  • an uneven existing floor that needs levelling by several centimetres without adding much weight.

Build-up of a dry screed and panel options

The build-up is simple. A protective layer goes onto the structural base, then a dry levelling fill that evens out irregularities, or a rigid insulation board where needed, and the floor panels go on top. An edge strip is fixed around the perimeter of the room to separate the floor from the walls.

A Rigidur floor panel is made of two gypsum fibre boards bonded together with an offset. This creates a rebated edge - a step into which the neighbouring panel fits. The joint is coated with adhesive and secured with screws or staples according to the manufacturer's instructions. The result is a solid, continuous surface. Panels are usually 1500 × 500 mm, so one person can carry them easily.

Panel thickness. Panels are mainly made in 20 mm (two 10 mm boards) and 25 mm (two 12.5 mm boards). The thinner panel is usually enough for flats and houses with normal loads. The thicker one is chosen where more people walk or where heavy furniture and appliances stand.

Insulated panels. Versions with bonded polystyrene or mineral wool improve thermal insulation and reduce impact sound. Neighbours in a block of flats will appreciate this in particular.

Levelling fill. The manufacturer's own dry levelling fill or expanded clay granules are used. System fill is normally just screeded level with a straightedge and not compacted. Loose fill is typically laid from about 10 mm to 100 mm deep; the exact limit for a given system is set by the manufacturer. Larger height differences are dealt with according to the system, for example with bonded fill or a combination of fill and rigid insulation boards. A simple rule for estimating quantities: 1 cm of depth over 1 m² needs about 10 litres of fill.

Protective layer. This depends on the base. On a timber joist floor, the manufacturers' systems specify a vapour-permeable paper or fleece. It stops the fill trickling through gaps but does not trap moisture in the timber. An impermeable polythene sheet could harm the timber there. On concrete, especially ground-bearing slabs or over unheated spaces, a sheet membrane is laid to protect against moisture from below.

Floor covering. Laminate, vinyl, wood, carpet and tiles can all be laid on a dry screed. Floating floors usually go directly onto the panels. For glued coverings and tiles, the surface is normally primed and, depending on the covering, skimmed with a levelling compound. Tiles need a flexible adhesive - choose one classified to BS EN 12004 (e.g. C2 for demanding substrates) and a grout classified to BS EN 13888 (e.g. CG2). Bathrooms need waterproofing, as gypsum fibre board on its own is not suitable for wet areas.

What to decide before placing the order

Most important decisions need to be made before the fill goes down. They are hard to change later.

  • Finished floor height: add up the fill, any insulation, the panel and the floor covering. The total must work with thresholds, doors, door linings and the floors in adjoining rooms.
  • Final floor covering: this determines whether the surface will be primed and skimmed and which adhesive will be used. Seamless poured finishes such as an epoxy resin floor up to 4 mm, a terrazzo or marble-effect epoxy resin floor or designer polyurethane poured resin flooring have their own substrate requirements, so check with the system manufacturers whether they are approved on a dry screed before choosing.
  • Panel type: standard, thicker for heavier loads, or with bonded insulation.
  • Underfloor heating: it must be a system the manufacturer approves for this build-up. Decide in advance, as heating cannot be added after the panels are laid without taking the floor apart.
  • Services in the floor: pipes and cables must be finished and run in protective conduit before the fill goes down, so they do not create high spots. In England and Wales a new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. All new electrical work should be designed, installed and certified to BS 7671:2018+A4:2026, the current IET Wiring Regulations.
  • Condition of the timber floor: in older houses it is worth checking the joists first. If the floor is springy or the timber is affected by rot or insect attack, a structural engineer should assess it. After the old floorboards are removed, there are often voids and gaps between the joists. These must be closed with boards or filled as specified, otherwise the fill will fall through.
  • Blocks of flats: before starting, agree the work with the managing agent or freeholder and check your lease, mainly because of noise and impact sound insulation towards the neighbours. Check with local authority building control whether replacing the floor needs any approval.

Installing a dry screed step by step

  1. Acclimatising the material: the panels are laid flat in advance in the room where they will be installed, so they adjust to its temperature and humidity. The time is set by the manufacturer, usually at least a day.
  2. Preparing the base: the old covering and loose layers are removed, the base is cleaned and checked to be sound and dry. On a timber floor, voids and larger gaps are closed.
  3. Setting the level: the highest point of the floor is found and the finished floor height is set from it.
  4. Protective layer: laid to suit the base, with overlaps, and turned up the walls.
  5. Edge strip: fixed around the perimeter and around fixed elements such as risers or a chimney breast.
  6. Levelling fill: poured and screeded level with a straightedge along guide rails.
  7. Insulation boards: laid on the fill if the build-up requires them.
  8. First row: the rebate is cut off on the wall side, and panels are laid from a straight wall towards the edge strip.
  9. Bonding and fixing the joints: adhesive is applied to the joints, the panels are placed and the joints are secured with screws or staples. Nobody walks on the levelled fill - only on panels already laid.
  10. Staggering the rows: each new row is offset so the cross joints do not line up.
  11. Ongoing checks: flatness is checked with a long straightedge during laying, not just at the end.
  12. Finishing: once the adhesive has cured, squeezed-out residue is scraped off and the surface is vacuumed. The protruding edge strip is trimmed only after the floor covering is laid, so neither covering nor adhesive reaches the wall.

Price of a Rigidur dry screed per m²: what it depends on

The guide price for labour is €12.50 per m². Several factors affect the final cost:

  • Condition of the existing base: removing old layers, adhesives and bitumen paper is separate work. On old floors it can take as long as the installation itself. Closing voids in a timber floor is another extra item. In homes built before 2000, have suspect materials tested before you drill or demolish; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
  • Fill depth: each centimetre of levelling adds about 10 litres of fill per m², and labour with it. If the depth exceeds the limit for loose fill, bonded fill or insulation boards are added.
  • Panel type: thicker panels and insulated versions cost more in materials, but can save a separate insulation layer.
  • Floor plan: alcoves, narrow hallways and doorways mean more cutting and waste. Small, broken-up areas cost noticeably more per m² than a large rectangular room.
  • Services in the floor: pipes and cables that need cutting around and careful filling slow the work considerably.
  • Access: carrying panels and bags of fill to an upper floor without a lift, or up narrow stairs into a loft, adds handling cost.
  • Preparation for the covering: priming, skimming or bathroom waterproofing are usually charged separately.

When comparing quotes, ask for an itemised breakdown: removal of the old floor, fill by depth, panel installation, preparation for the covering and delivery. Before you hand over the old floor materials or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note. One contractor may include fill and protective layer in the price per m², another only the panel laying.

How to prepare so the installation goes quickly

  • the room is cleared and furniture is moved out of the area, not just into a corner,
  • plastering, skimming and other wet trades in the property are finished and dry - gypsum fibre boards do not like moisture,
  • services in the floor are finished and tested before the floor fitter arrives,
  • the floor covering is chosen, so the height does not have to be decided on site,
  • materials are delivered in good time and stored flat and dry in the room itself, not on a balcony or in a damp cellar,
  • parking, use of the lift and a place for cutting panels are arranged,
  • the room is at normal room temperature, so the joint adhesive cures properly.

Work is held up when services are added during laying, or when other trades are working in the room at the same time and walking on the levelled fill.

Common mistakes and how they show up later

  • Missing edge strip. The floor touches the walls, transmits noise to the neighbours, and joints can crack as the material moves.
  • Uneven or trodden fill. Hollows remain under the panel, leaving it unsupported. The floor is springy and creaks in those spots.
  • Fill deeper than permitted or non-system fill. Sand or an overly deep loose layer lacks stability, and the floor settles after a few months.
  • Wrong protective layer. Without one, the fill trickles into gaps. An impermeable sheet on timber traps moisture in the joists.
  • Unclosed voids in a joist floor. The fill gradually drops through and the floor settles in those places.
  • Rebate not cut off at the wall. The panel edge is unsupported and cracks or creaks by the wall.
  • Too little adhesive in the joint. Panels move against each other, the joint opens over time and shows as a crack in tiles or skim.
  • Cross joints in line. The surface is weaker there and the joint may show through the covering.
  • Panels not acclimatised. A board brought in from the cold or the damp keeps changing size after laying, and the joints suffer.
  • No waterproofing in the bathroom. Water gets through the tile grout, the boards absorb it and the tiles come loose.

Laying Rigidur panels yourself: points to watch

With a sound base, an accurate spirit level or laser and patience, you can lay the panels yourself. With a timber floor of uncertain strength or services in the floor, it is better to call in a professional. Read the manufacturer's instructions beforehand - they take precedence over this text. The order of steps is the same as above, but these tips help when doing it yourself:

  • Set the guide rails exactly level, screed the fill along them, lift the rails out carefully, then fill and level the channels they leave.
  • Do not screed the whole room at once, but in sections that are covered with panels straight away.
  • Prepare stepping pads - offcuts of board laid on the fill - so you can stand on it without pressing hollows.
  • Push the first row against the edge strip, not directly against the wall.
  • Apply adhesive to the rebate in two continuous beads. When the next panel is placed, a little should squeeze out; if none does, there is too little.
  • Space screws or staples as the instructions for the panel specify, roughly 20 cm for screws and closer for staples. Heads must not stand proud of the surface.
  • Let squeezed-out adhesive cure before scraping it off; fresh adhesive only smears.
  • Cutting produces fine dust, so wear a dust mask and use a saw with extraction.

How to check the finished dry screed at handover

  • the floor is flat; a long straightedge does not show significant gaps or rock anywhere,
  • nothing creaks underfoot and the panels do not flex,
  • the edge strip runs around the whole perimeter and the floor touches the wall nowhere,
  • joints are bonded, fixed and free of adhesive residue,
  • screw heads or staples do not stand proud of the surface,
  • cross joints are staggered in neighbouring rows,
  • the floor height works with transitions and doors,
  • with underfloor heating, you have a record of the pressure test carried out before covering, and the heating works after installation,
  • sockets and lights connected to services in the floor work after installation,
  • the contractor has given you details of the system used and which floor covering and adhesive you can use.

Frequently asked questions

Installing Rigidur floor panels with bonded joints has a guide price of €12.50 per m². Removing the old floor, deeper fill and preparation for the covering are usually added separately - see the price section above for details.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.