Installation of Acoustic/Thermal Insulation

Insulating a plasterboard structure means fitting mineral wool into a partition, wall lining, ceiling or loft for sound and heat. A guide price is €2.50 per m². Thickness, number of layers and the vapour control layer affect the cost.

Updated 09/2026·13 min read·11 price list items
Standard labour price
€2.50/ m²
Indicative range
€2.00 - €3.25
60 m² flat
€375.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Installation of Acoustic/Thermal Insulation

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Plasterboard and dry lining11 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Plasterboard systems cost

Stud wall insulationm²€2.50 / m²m²enter quantity-
Single-layer plasterboard stud partitionm²€23.50 / m²m²enter quantity-
Double-layer plasterboard stud partitionm²m²-
Plasterboard wall liningm²€18.00 / m²m²enter quantity-
Plasterboard flat ceilingm²€23.00 / m²m²enter quantity-
Sloped ceiling plasterboardingm²€28.00 / m²m²enter quantity-
Lay-in grid ceiling (incl. gridwork)m²m²-
High-impact plasterboard partitionm²m²-
Vapour barrier installation in plasterboard ceilingm²€1.40 / m²m²enter quantity-
Lightweight mobile aluminium scaffold tower for high ceilingsm²€3.00 / m²m²enter quantity-
Mineral wool thermal insulation in a plasterboard ceiling (up to 100 mm)m²€4.00 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

Acoustic and thermal insulation in plasterboard: what it does and when it is needed

A plasterboard stud wall without insulation is essentially an empty cavity. It carries sound well and, in a loft, does not hold heat. Insulation is therefore usually fitted in new partitions between rooms, in walls being soundproofed against the neighbours and in habitable lofts. It is one of the standard stages of plasterboard work.

In a partition or wall lining, the wool goes in once one side of the frame has been boarded and the other side is still open. In a loft there is no first side of plasterboard. The wool is fitted from below between the rafters and held by friction or by extra retaining fixings. Only then do the vapour control layer and the ceiling follow.

In an ordinary partition between rooms, the insulation has mainly an acoustic role. Wool in the cavity dampens conversation, television or music from the next room. It does not perform miracles, though. If sound travels through the ceiling, the floor or poorly sealed joints, the wool alone will not stop it. A combination of wool, double boarding and resilient connections to the surrounding structure helps far more.

In a loft and in a wall lining on an external wall, the main concern is heat. Simply fitting wool is not enough here - a vapour control layer on the room side also matters. Without it, moisture from inside gets into the insulation. It can condense there and gradually cause mould.

Why is mineral wool almost always used in plasterboard rather than polystyrene? Wool is soft, fills the cavity without gaps, is non-combustible when unfaced and dampens sound much better. Polystyrene is rigid, tends to transmit sound and is not usually suited to plasterboard construction.

Fitting wool into a straight partition in one room is usually a matter of hours. A loft with several layers and a vapour control layer takes considerably longer, often several days. The insulation should be ordered together with the drylining work, not as a separate job at the end.

What to decide before the structure is built

Insulation is not something to decide once one side is already boarded. Much of it is determined by the frame, so it is worth agreeing the details with the dryliner in advance.

  • What the structure needs to achieve: sound between rooms, noise from neighbours, heat in the loft or fire resistance. This determines the thickness, type of wool and number of board layers.
  • Stud width: this sets how much wool fits into the wall. A wider partition takes more space from the room but holds thicker insulation.
  • Single or double boarding: a basic single-layer plasterboard partition suits many rooms, but for a wall expected to give better sound insulation it is worth planning for two layers of board on each side. This is decided before work starts, not afterwards.
  • Wall to the neighbours: here an independent frame set away from the existing wall makes more sense than studs fixed directly to it.
  • Position of sockets and switches: if there are sockets on both sides of the partition, they should not be directly back to back. It is sensible to offset them by at least one bay between studs.
  • Insulating an external wall from inside: a wall lining with wool on an external wall is internal insulation. It carries a moisture risk, because the point where vapour condenses can move to the junction between the insulation and the masonry. Have a condensation risk assessment carried out before deciding. A vapour control layer alone, without such an assessment, does not guarantee that the wall will stay dry.
  • Roof build-up in the loft: find out what membrane lies under the roof covering and whether a ventilated gap must remain above the insulation. This determines how thick the wool between the rafters can be.
  • Fire resistance: it needs to be known in advance whether the wall must meet a fire rating. This changes the choice of materials and the way services are run.
  • Who supplies the materials: whether the contractor buys the wool and membrane, or the client does. When buying your own, the exact thickness and type of wool must be known.

How insulation is fitted step by step

Partitions and wall linings follow a different sequence from lofts, so the method is split into two parts.

Partition and wall lining:

  1. Frame and first side: the metal stud frame is built. Sealing tape is applied under the perimeter tracks and studs at the floor, ceiling and walls. One side is then boarded with plasterboard.
  2. Services: the electrician runs cables in the cavity and fits back boxes. If water or heating pipes also run through the wall, the plumber completes and tests them. Everything must be finished before the wool goes in. In a fire-rated partition, back boxes and penetrations are made only as the system allows - a standard box or an unsealed opening can compromise the wall's fire resistance.
  3. Measuring and cutting: the mineral wool is cut slightly wider than the clear distance between studs, usually by about a centimetre. This lets it wedge between the studs without slipping.
  4. Fitting: the wool is fitted from the bottom up. Slabs or batts butt tightly together, with no gaps and no unnecessary compression.
  5. Cutting around obstacles: the insulation is cut around boxes, pipes and cables, not left out. Small gaps are filled with offcuts.
  6. Vapour control layer on an external wall: if it is a wall lining on an external wall and the assessment requires it, the membrane is fitted on the room side, joints are taped and it is sealed tightly to the surrounding structure.
  7. Inspection and boarding: the whole area is checked before boarding. The second side is then boarded so that screws do not hit cables.

Loft and ceiling below an unheated space:

  1. Roof check: confirm that the underlay beneath the roof covering is intact. If it is not vapour-permeable, a ventilated gap is left above the insulation and the wool must not be pushed up against the membrane. With a breathable membrane, the insulation can go up to it if the roof build-up allows.
  2. First layer between rafters: the wool is cut slightly wider than the gap between rafters, wedged in place and secured against falling out if needed.
  3. Ceiling support frame: the ceiling channels are fixed below the rafters, usually on hangers, as for a standard plasterboard or suspended ceiling installation.
  4. Second layer below rafters: if the build-up includes another layer, it goes between the ceiling channels. Joints are staggered against the first layer so the gaps do not line up.
  5. Services: cables for lights and sockets are routed so they pass through the vapour control layer no more than necessary, and each penetration is sealed.
  6. Vapour control layer: fitted from below, on the room side, under the whole insulation. Joints are taped and the membrane is sealed tightly to walls, roof windows, chimneys and beams.
  7. Boarding: finally the plasterboard ceiling is fixed. Screws go into the channels and must not puncture the vapour control layer anywhere else.

What thickness of acoustic and thermal insulation to choose

Insulation thickness in a partition usually follows the stud width. A partition with 50 mm studs takes wool of roughly the same thickness, wider studs - for example 75 or 100 mm - take thicker wool. For acoustics, the wool does not have to fill the cavity to the last millimetre. A layer slightly thinner than the stud still gives most of the benefit. Large empty bays, gaps at the studs and compressed wool, however, do harm.

For heat it is different. In a loft and in a wall lining, full thickness without air gaps is assumed, often in several layers. The layer between rafters must not take up the ventilated gap under the roof covering if the roof build-up requires one. The required thickness is set by the design or a thermal calculation. Insulation on renovations and extensions in England must currently meet Approved Document L (2021 edition); the new 2026 edition (Future Homes Standard) takes effect on 24 March 2027.

Which material to choose

  • glass mineral wool is light, cuts easily and is entirely adequate for ordinary partitions and lofts, including for soundproofing,
  • stone mineral wool (rock wool) is heavier and denser, chosen mainly where higher fire resistance is needed, and in the cavity of an ordinary partition it dampens sound comparably to glass wool,
  • acoustic slabs or batts are made specifically for partitions and wedge easily between studs,
  • rolls suit lofts and ceilings, where they are laid between and below rafters.

Faced wool, meaning wool with bonded paper or foil, may have a different reaction-to-fire class from unfaced wool. For fire-rated partitions, it is therefore not just the wool that matters but the whole system. The type of insulation, its density, the board build-up, back boxes and service penetrations are set by the system manufacturer or the design. If the wall must meet a fire resistance requirement, the specified build-up must be followed exactly.

Price of insulating plasterboard per m² and what affects it

The guide labour price is €2.50 per m². It is calculated on the area of the structure being insulated. When comparing quotes, check whether the price includes materials, the vapour control layer and removal of offcuts, or labour only. The amount of work, and so the price, rises with:

  • thickness and number of layers: each additional layer means more cutting and fitting and is usually priced separately,
  • services in the wall: many boxes, cables and pipes to cut around significantly slow down otherwise quick work,
  • irregular stud spacing: when bays are not the same width, every piece is cut to size,
  • sloping ceilings, corners and work between rafters: in a loft the work is slower than on a straight partition,
  • overhead work: in ceilings the wool must be secured and the work is harder,
  • vapour control layer: fitting it, taping joints and sealing around roof windows, chimneys and beams is a separate, time-consuming part of the job,
  • fire-rated partition: system back boxes and sealed service penetrations add both labour and materials,
  • room height: tall walls and spaces needing scaffolding or a mobile tower,
  • material: stone wool and special acoustic slabs cost more than standard glass wool and are harder to handle,
  • small jobs: for a few m², the price per m² is usually higher, because preparation and travel take the same time.

The cheapest case is a straight partition with regular stud spacing, where the wool simply goes into prepared bays.

How to prepare so the work does not stall

  • Trades follow one another: if the dryliner arrives and cables or pipes are still missing from the wall, they must wait or leave, and the whole programme slips.
  • Materials are on site in time and kept dry: damp or soaked wool must not be fitted into a wall. Packs belong in a dry room, not on a balcony or under an open window.
  • There is space to cut: cutting wool needs a clear area of floor to lay out slabs and batts.
  • The room is cleared: mineral wool sheds dust and fibres settle on furniture and fabrics. Anything that cannot be moved out should be covered.
  • Waste removal is agreed: packaging and wool offcuts are bulky. It helps to know in advance who will take them away.

Typical mistakes and how they show up later

Insulation can be in the wall and still not work as it should. The problem usually appears only after boarding, when it can no longer be easily put right.

  • Gaps between pieces of wool or empty spaces at studs: sound and heat escape through them. More is heard from the next room than expected, and cold spots may appear in the loft in winter.
  • Over-compressed wool: wool insulates through the air in its pores. Squashed into a thinner layer, it performs worse than its thickness would suggest.
  • Wool cut too narrow: over time it slips and leaves a void at the top of the wall. This is invisible from outside but shows as poorer sound insulation or a cold upper part of the wall.
  • Missing or damaged vapour control layer, or untaped joints: dark stains, mould in corners, a musty smell and damp rafter timber appear later.
  • Wool pushed against a non-breathable membrane with no ventilated gap: moisture has nowhere to go. The result is wet insulation, dripping from the ceiling and rotting rafters.
  • Internal insulation of an external wall without assessment: mould appears at the bottom of the wall or behind furniture, often only after one or two winters.
  • Sockets back to back on both sides of a partition: this creates an acoustic hole through which sound passes almost unhindered.
  • No sealing tape under the perimeter tracks: the partition is rigidly connected to the ceiling and floor and gaps remain at the junctions. Sound travels round the sides through joints and adjoining structure, so the wall performs worse than it could with the same wool.
  • Wrong material or non-approved penetrations in a fire-rated partition: the wall looks the same but does not achieve the required rating. At a building control or fire safety inspection, this can mean stripping out and rebuilding.

How to check finished insulation at handover

The most important check happens before the second side is boarded - after that, the inside of the wall cannot be seen. If a site visit is not possible, ask for photographs of the whole area before boarding.

Before boarding

  • the cavity is filled across its full area and height, with no gaps at studs, floor or ceiling,
  • the wool stays in place by itself, without sagging or slipping,
  • insulation thickness matches the stud width or the agreed build-up,
  • with several layers, the joints between layers are staggered,
  • there are no voids around boxes and services, and sockets are not back to back,
  • sealing tape is fitted under the perimeter tracks,
  • in the loft there is a ventilated gap above the insulation where the roof build-up requires it, and the underlay is undamaged,
  • the vapour control layer is continuous, joints and junctions are taped and the membrane is not torn or punctured away from the channels,
  • in fire-rated partitions, exactly the material, back boxes and penetrations specified by the system have been used.

At handover of the finished wall

  • the area in m² on the invoice matches the area measured independently, and the number of layers matches what was done,
  • photographs of the insulation and vapour control layer before boarding are attached to the handover record,
  • the invoice states the same material, type of wool and thickness as agreed in the quote,
  • for a fire-rated partition, there is documentation of the system and materials used, such as delivery notes and data sheets,
  • offcuts have been cleared and the area vacuumed.

DIY guide: insulating a plasterboard partition

Fitting wool into a partition within a room is within the reach of a capable DIYer. Leave electrical work to a qualified electrician. A new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. Leave lofts, internal insulation of external walls and fire-rated partitions to a professional, as the details matter there. When handling mineral wool, wear gloves, safety glasses, a dust mask and long sleeves.

  1. Check that all services in the wall are complete and signed off by the electrician.
  2. Measure the clear distance between studs at several heights.
  3. Cut the wool with a long, sharp knife on a board, slightly wider than measured.
  4. Fit the wool into the bays from the bottom up and wedge it gently between the studs.
  5. Butt pieces tightly together, leaving no gaps at the floor or ceiling.
  6. Cut the wool around boxes and pipes, and fill small gaps with offcuts.
  7. Before boarding, run a hand over the wall to check that no wool is missing or protruding past the studs.
  8. Clear away offcuts and dust and ventilate the room.

Frequently asked questions

The guide price is €2.50 per m² of structure area. The final price depends on thickness and number of layers, the amount of services in the wall, whether it is a straight partition or a loft with sloping ceilings, and whether a vapour control layer is included. Check whether the quote covers materials and removal of offcuts.