Building work price list: Plasterboard Partition with Knauf Diamant Boards (Impact Resistance and Acoustics)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Plasterboard systems cost | ||||
| High-impact plasterboard partition | m² | €24.00 / m² | m² | enter quantity- |
| Single-layer plasterboard stud partition | m² | €23.50 / m² | m² | enter quantity- |
| Double-layer plasterboard stud partition | m² | m² | - | |
| Plasterboard wall lining | m² | €18.00 / m² | m² | enter quantity- |
| Plasterboard flat ceiling | m² | €23.00 / m² | m² | enter quantity- |
| Sloped ceiling plasterboarding | m² | €28.00 / m² | m² | enter quantity- |
| Lay-in grid ceiling (incl. gridwork) | m² | m² | - | |
| Vapour barrier installation in plasterboard ceiling | m² | €1.40 / m² | m² | enter quantity- |
| Stud wall insulation | m² | €2.50 / m² | m² | enter quantity- |
| Lightweight mobile aluminium scaffold tower for high ceilings | m² | €3.00 / m² | m² | enter quantity- |
| Mineral wool thermal insulation in a plasterboard ceiling (up to 100 mm) | m² | €4.00 / m² | m² | enter quantity- |
What a Diamant board partition is and when it is worth it
A partition clad in Knauf Diamant boards looks like an ordinary metal stud plasterboard wall. Instead of standard boards, it uses high-density boards with a denser core. The surface is harder, dents less on impact and, because the boards are heavier, the wall reduces sound better. It is often chosen for dividing rooms in a flat, separating a bedroom from a living room, and in children's rooms and hallways. For an overview of related work, see the section on plasterboard work.
The same boards are also used for wall linings. A wall lining does not stand freely in the room but sits just in front of an existing wall. It suits situations where you want better sound insulation on a party wall, need to hide services, or want to straighten an uneven old wall without replastering. The frame either stands independently on its own studs with a small gap from the wall, or is fixed to the wall with brackets. An independent lining does not touch the wall, so it performs better acoustically, but it takes up more space.
Compared with standard plasterboard, Diamant pays off where the wall takes knocks from children, furniture, pushchairs or bicycles in the hallway, and where quiet matters. For a simple partition in a dressing room or storeroom, where there is no noise and nothing hits the wall, a standard single-layer plasterboard partition is often enough.
Diamant or Habito: what is the difference
Both are high-hardness plasterboards. Compared with standard board they have a higher density, a tougher surface and a stronger core. The difference lies mainly in what each one is designed for.
- Knauf Diamant is a general-purpose high-density board. It suits places where you want better acoustics and a tougher wall, such as a bedroom, child's room or office. The board is marked with the classification DFH2IR. This means higher density, a glass-fibre reinforced core that improves fire performance, reduced water absorption (it is moisture-resistant), a harder surface and higher strength. Thanks to its moisture resistance it is also suitable for a bathroom in a flat.
- Habito (Rigips Habito in continental Europe, Gyproc Habito from British Gypsum) is stronger still and is designed mainly for fixing. According to the manufacturer, light and medium-weight items such as a television or shelves can be fixed directly into the board without finding a stud. Check the exact load per fixing point and the moisture properties in the technical data sheet for the specific board type.
If you know the wall will carry kitchen units, a bookcase or heavier equipment, consider Habito. Even with Habito, however, kitchen units and other heavy assemblies usually need noggins or pattressing built into the frame. For a quieter and tougher partition without heavy loads, Diamant is usually sufficient.
The fire resistance of the whole partition is not determined by the board alone. The manufacturer states it for a specific system build-up, meaning the type of studs, the number of board layers and the insulation. If the partition must meet fire requirements, for example next to a common corridor in a block of flats, the build-up from the manufacturer's documentation must be followed.
What to decide before placing the order
Most things that affect the result cannot be changed once the boards are on. Boards can be taken off, but the job is delayed and the material is often wasted. It is therefore worth clarifying in advance:
- What the partition is mainly for. For quiet, the key factors are two layers of board, a deeper cavity with mineral wool and thorough sealing around the perimeter. For strength and fixing, the key factors are the board type and the noggins.
- Single or double boarding. One layer of high-density board is tougher than a standard partition, but the acoustics improve significantly only with two layers on each side.
- How much space the partition can take. The thickness depends on the stud width and the number of layers, described in more detail below.
- Doors. Position, width and type of door lining, or a sliding pocket door in the wall. The door opening needs reinforced studs, which go in together with the frame.
- Services. Where sockets, switches, lights and possibly water supply or waste pipes will be. Services are run after the first side is boarded and before the second side.
- Fixing points. Television, kitchen units, shelves, washbasin. These positions are reinforced according to the load while the frame is being built.
- Finish. Whether the wall will be painted, papered or tiled. For tiling, closer stud centres or double boarding are used.
In a block of flats it is worth informing the managing agent or freeholder before starting; leaseholders may need the landlord's consent under the lease. Whether a change of layout needs building regulations approval depends on the scope of work, so check with your local authority building control. Electrical work in the partition should be connected by a qualified electrician. A new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. Ordinary fixing of tracks and brackets into walls, floor and ceiling is part of the installation. In homes built before 2000, have suspect materials tested before you drill or demolish; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor. Work on load-bearing walls and common parts of the building, such as chasing, demolition or new openings through floors, requires consent and a specialist. In Scotland, structural alterations, extensions and loft conversions need a building warrant from the council before work starts.
The partition build-up and why it matters
The result depends not only on the board but on the whole build-up, meaning all the layers together.
- Metal frame of perimeter U track (UW) and vertical C studs (CW). Studs are usually at around 600 mm centres, matched to the board width, and closer for heavier loads or tiling.
- Acoustic sealing tape under all sections touching the floor, ceiling and walls. It reduces the transfer of vibration into the surrounding structure.
- Mineral wool in the cavity. It absorbs sound that would otherwise bounce around an empty cavity like a drum. More on this in the section on installing acoustic and thermal insulation.
- Boarding in one or two layers on each side. Two layers greatly improve sound insulation and strength; the joints of the second layer are staggered against the first.
Why does weight help against noise? A heavier board vibrates less in response to sound, so less energy passes to the other side. That is why high-density board in two layers with insulation reduces speech or television noise noticeably better than a lightweight partition.
Sound always finds the weakest point, though. A gap at the ceiling, a socket directly opposite another socket or a standard door without seals can undermine even a very good build-up. With a lining on a party wall, it is important that the frame touches the original wall as little as possible.
How thick the partition will be and how well it insulates sound
The thickness is easy to work out: stud width plus all the board layers. Studs are commonly around 50, 75 or 100 mm wide (exact sizes vary by system), and Diamant board is most often 12.5 mm thick.
- 75 mm stud and one board on each side: the partition is about 100 mm,
- 75 mm stud and two boards on each side: about 125 mm,
- 100 mm stud and two boards on each side: about 150 mm.
A deeper cavity holds more insulation and larger services such as waste pipes, but takes space from the room. With a wall lining, the gap from the original wall is added to the thickness.
The sound insulation of a partition is expressed as Rw in decibels. The higher the number, the less sound the wall lets through. The manufacturer states it in the technical data sheet for each system build-up, meaning a specific combination of studs, boards and insulation. If quiet matters to you, ask the installer which build-up is proposed and what Rw the manufacturer gives for it. The actual result in a flat is usually somewhat lower, because sound also travels through the surrounding walls, ceiling and doors.
How the installation works step by step
- Set out the partition position, mark it on the floor and transfer it to the ceiling with a laser or plumb line.
- Apply sealing tape to the U track, fix it to the floor and ceiling, then fit the end C studs against the walls.
- Insert C studs at the specified centres and fit reinforced door studs at the openings.
- Add noggins or pattressing where heavy items will hang, if the system requires it for the load.
- Board one side.
- Run electrical cables or pipework in the cavity and fit mineral wool without gaps and without compressing it.
- Board the second side and cut openings for socket and switch back boxes.
- With double boarding, fit the second layer with staggered joints.
- Fit corner beads, tape and fill joints and screw heads according to the manufacturer's system, and seal the perimeter with a permanently flexible sealant.
- Once dry, sand, prime and prepare the surface for painting.
If the partition will contain a riser or services that will need attention later, an access panel should be planned in.
For a wall lining the process is similar, but only one side is boarded. With an independent frame, the sections are fixed only to the floor and ceiling; with a bracket-fixed frame, the studs are fixed to the original wall via brackets.
Cost of installing a Diamant board partition per m²
The approximate labour price is €24.00 per m². The wall area is measured, meaning length times height. Door openings are deducted or charged separately, as agreed. When comparing quotes, check whether the price is for single or double boarding and whether it includes jointing and insulation.
High-density boards are heavier than standard plasterboard, harder to cut and need screws designed for this type of board. An ordinary drywall screw often will not sink in or will snap. The work therefore takes longer than a standard plasterboard partition, and the boards need two people to handle them.
The price also goes up with:
- Double boarding. Twice as many boards are screwed and jointed on each side, so labour and materials rise significantly, roughly by half or more compared with a single layer.
- Room height. Above standard height, longer studs, board extensions, scaffolding or a mobile tower are needed.
- Uneven ceiling or floor. Track has to be packed and cut, the perimeter gap is irregular and harder to seal.
- Door openings, corners, sloping ceilings and junctions with windows. Each opening and corner means door studs, board cutting and corner beads, so they are often priced as a separate item.
- Higher acoustic requirements. A separate frame for each side, a deflection head at the ceiling or careful sealing of every penetration add time.
- Many services, sockets and noggins in the partition. Noggins are made to measure, and every back box means a cut opening and sealing.
- Surface quality. Standard jointing for paint is cheaper than a full skim for strong side lighting or gloss paint.
- Restricted access. Carrying heavy boards up stairs without a lift or through narrow corridors is usually charged extra.
What makes the job easier and what slows it down
The job goes faster in a level, dry, prepared room with a clear plan for services and agreed positions for wall-hung furniture. On the customer's side, it helps most to:
- clear the area around the future partition for at least two metres on each side,
- provide a place where the boards can lie flat and dry, as boards stored on edge tend to bow,
- arrange the lift, parking for the van and delivery time with neighbours or the managing agent in advance,
- have sockets, lights and positions for the television or units drawn or marked before the installers arrive,
- coordinate with the electrician so that cables are run straight after the first side is boarded and the installers do not have to wait,
- have power and normal room temperature in the room, as jointing compound dries more slowly in an unheated space.
The job is slowed down by changes during installation, such as moving a door after the studs are in, extra sockets after boarding, or wet trades in the same room, such as a new screed or plaster, which raise the humidity.
Mistakes that spoil even good materials
Missing sealing tape or a rigid connection to the surroundings
If the sections touch the ceiling and walls without tape, sound travels through the surrounding structure. Footsteps, slamming doors and loud voices are then heard even though the partition itself is good.
A cavity without mineral wool or with gaps in the insulation
The partition loses much of its acoustic performance. It sounds hollow when tapped and sound bounces around the empty cavity, so it insulates far worse than it could.
Studs spaced too far apart
The partition flexes and the joints crack. Cracks appear especially around doors, where the partition is shaken every time the door closes.
Too few screws or the wrong screws
Proud heads or ordinary screws instead of screws for high-density board show up as screw heads visible through the paint, boards standing off in places and coming loose on impact.
Sockets directly back to back
They create an acoustic weak spot. Noise from the next room is heard precisely around the sockets.
A rigid connection to a ceiling that can deflect
In this case a deflection head is used. Without it the ceiling loads the partition and a horizontal crack forms at the junction. This also matters when the partition meets a plasterboard or suspended ceiling.
Rushed jointing
If the compound does not dry properly, hairline cracks appear. They usually show a few weeks after painting, directly over the board joints.
Perimeter filled with rigid filler instead of flexible sealant
With small movements of the structure, the filler parts from the wall and a gap opens in the corner.
How to check the finished partition
Before painting, inspect the wall under side lighting, for example with a torch held close to the surface. At handover it is worth checking that:
- the partition is plumb and straight, without visible flexing when pushed,
- there is a continuous flexible sealant around the perimeter with no gaps,
- screw heads are sunk and filled,
- joints are smooth, without cracks, bubbles or raised tape,
- external corners are protected with corner beads and the edges are straight,
- doors in the partition open freely and the lining is firm,
- the partition does not sound hollow over its whole area when tapped, which would suggest missing insulation,
- you have drawings or photos of the services and noggin positions in the partition,
- sockets and switches are connected by an electrician and are not back to back,
- any agreed access panel opens and is in the right place,
- the surroundings, floor and windows are free of compound and dust.
DIY guide: what to watch out for with high-density boards
A competent DIYer can manage a simple partition without a door in a room of normal height. The process is the same as described above. Leave electrical work to an electrician. Partitions with doors, tall spaces and walls with high acoustic requirements are better left to professionals. Compared with standard plasterboard, you also need to:
- Check the manufacturer's system build-up and specified screws for the chosen board, and buy screws designed for high-density board.
- Use a screwdriver with adjustable depth so that the screw head ends just below the surface without breaking the paper liner.
- Cut boards with a saw or knife and plenty of spare blades, as the hard core blunts blades quickly. Wear a suitable dust mask when cutting and sanding.
- Check the studs with a spirit level before boarding; with high-density board a bent stud shows across the whole wall.
- Fit mineral wool over the full area without gaps, including in corners and around studs.
- Let the compound dry thoroughly before each further coat and before sanding.
A second person is needed for lifting boards to the ceiling or boarding the upper parts. Diamant board is heavier than standard plasterboard and breaks easily or injures someone if dropped.
Frequently asked questions
The approximate price is €24.00 per m². The final price depends mainly on single or double boarding, room height, the number of doors and corners, the amount of services and noggins, and site access.
Habito board is designed for fixing directly into the board, but what it can carry depends on the type of fixing and the weight of the unit including its contents. For heavier assemblies it is worth building noggins into the partition during installation and checking the load capacity in the manufacturer's technical data sheet.
No lightweight partition guarantees complete silence. With the right build-up of mineral wool, sealing tape and double boarding, however, it noticeably reduces speech, television and everyday household noise. A large share of sound can also pass through the door, so consider that too.
It can help, especially if it stands independently with a small gap from the original wall, has mineral wool in the cavity and is sealed around the perimeter. On its own, however, it will not stop noise travelling through the ceiling, floor or risers.
Yes, high-density boards are suitable for tiling. For tiling, closer stud centres or double boarding are usually used. Wall tiling should follow the BS 5385 code of practice, with the background prepared and the adhesive chosen to suit the tile size and weight. Choose a tile adhesive classified to BS EN 12004 (e.g. C2 for demanding substrates) and a grout classified to BS EN 13888 (e.g. CG2). Diamant is moisture-resistant, so it is also suitable for a bathroom in a flat. In areas exposed to splashing, such as a shower or around a bath, a waterproofing (tanking) system should go under the tiles according to the manufacturer's system.
The frame and boarding of a typical room partition usually takes an installer one to two days. Drying time for the compound between coats must be added, so the surface is usually ready for painting a few days later.
Related work
How a single layer plasterboard partition is built, when it is enough, what makes the job harder and how to check the finished wall.
How a flat gypsum board ceiling or suspended ceiling is installed, which boards to choose, what makes the job harder and how to check the result.
How mineral wool is fitted into plasterboard partitions, wall linings and lofts, which material to choose and how to check the finished work.
How a double-layer plasterboard partition is built, when it beats a single-layer wall, which mistakes to avoid and how to check the finished wall.
How a plasterboard furring wall without insulation is built, when it makes sense, which studs and boards to choose and what to check on the finished wall.
How a suspended ceiling with a metal grid is installed, which tiles and grid to choose, what makes the job harder and how to check the finished ceiling.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.