Building work price list: Gypsum Plasterboard Furring Wall Installation (without Insulation)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Plasterboard systems cost | ||||
| Plasterboard wall lining | m² | €18.00 / m² | m² | enter quantity- |
| Single-layer plasterboard stud partition | m² | €23.50 / m² | m² | enter quantity- |
| Double-layer plasterboard stud partition | m² | m² | - | |
| Plasterboard flat ceiling | m² | €23.00 / m² | m² | enter quantity- |
| Sloped ceiling plasterboarding | m² | €28.00 / m² | m² | enter quantity- |
| Lay-in grid ceiling (incl. gridwork) | m² | m² | - | |
| High-impact plasterboard partition | m² | m² | - | |
| Vapour barrier installation in plasterboard ceiling | m² | €1.40 / m² | m² | enter quantity- |
| Stud wall insulation | m² | €2.50 / m² | m² | enter quantity- |
| Lightweight mobile aluminium scaffold tower for high ceilings | m² | €3.00 / m² | m² | enter quantity- |
| Mineral wool thermal insulation in a plasterboard ceiling (up to 100 mm) | m² | €4.00 / m² | m² | enter quantity- |
What a furring wall is for and when to choose one
A furring wall, often called a wall lining or independent lining, does not change the layout of a room. It only makes the room a few centimetres smaller. It is used most often when renovating older flats and houses. Typical reasons are walls that are uneven or cracked, or cables, water pipes and waste pipes that need to be hidden without chasing into the masonry.
A furring wall is often confused with a partition. A partition stands freely and divides a room, as described under single-layer drywall partition walls. A furring wall follows the existing wall and is mainly a technical and visual improvement. If the layout stays the same and the aim is a flat wall ready for paint, wallpaper or tiles, this is the right choice. It is one of several systems covered under plasterboard work.
The version without insulation in the cavity makes most sense in these situations:
- old, uneven plaster that would otherwise need extensive patching or replastering,
- hiding services where chasing into the wall is not wanted or not allowed,
- a quick upgrade in an occupied home, avoiding wet plastering and long drying times,
- hallways, offices and rooms with no particular acoustic or thermal requirements.
When is something else better? If noise from the neighbours is the problem, an empty cavity helps very little and the wall can even sound hollow. In that case a lining with mineral wool is the better option, see installation of acoustic and thermal insulation. On external walls, take care with internal insulation. Without a design by a specialist and a correctly detailed vapour control layer, there is a risk of condensation behind the board.
Decisions to make before installation
Most problems with a furring wall start at the planning stage. If something is forgotten, the finished wall has to be opened up. That is always more work than sorting it out in advance. Before placing the order, be clear about:
- Where sockets, switches and lights will go. Plasterboard needs special dry lining back boxes. Their positions are fixed before boarding, and the wiring is done by a qualified electrician to BS 7671:2018+A4:2026, the current IET Wiring Regulations.
- What will hang on the wall. Kitchen units, wall cupboards, a wall-mounted TV, bookshelves or a wall-hung WC need noggins or pattresses in the frame. Write down what will be fixed and at what height, so the installer puts the noggins in the right place.
- What finish is required. Many system manufacturers grade the plasterboard finish from Q1 to Q4. Q2 is a standard finish for matt emulsion. Q3 and Q4 involve full-surface jointing compound and more sanding. They are worth it under gloss or dark paints and thin wallpapers, and on walls lit from the side by a window. A lower grade is enough under tiles. A full plaster skim is a common alternative for a high-quality finish.
- What stays behind the wall. Valves, stopcocks, water meters, junction boxes and rodding eyes on waste pipes must remain accessible. Access panels are fitted at these points.
- How much space the wall can take. In a narrow hallway or next to doors and windows, the thickness of the lining can decide whether the reveal or door lining still fits. Approximate dimensions are given in the questions below.
If shared services in a block of flats, such as water, waste or gas risers, are to be boxed in behind the wall, agree this with the freeholder or managing agent first. Any work on gas must be carried out by a Gas Safe registered engineer, so check the back of their ID card to see which work they are qualified for. Gas pipework is never covered without their assessment.
Materials and construction options
- Furring channels (CD) with perimeter channels (UD) and direct fixing brackets. This is the slimmest option. Shallow channels are fixed into brackets anchored to the existing wall. It suits walls that are sound, not too far out of true and have no bulky services in front of them.
- C studs (CW) and U tracks (UW) in the width required. Narrower studs are usual for linings, wider ones only for taller walls or larger pipes. Compared with furring channels they leave more space in the cavity and allow greater wall heights.
- Standard plasterboard for dry rooms, moisture-resistant plasterboard for bathrooms and kitchens. Where tiles go into a shower, the board also needs a tanking system.
- Single or double boarding. Two layers of board are stronger, deflect less and cope better with shelves or cupboards.
- Braced lining with C studs. The vertical studs are fixed to the existing wall with brackets at regular intervals up the height. This makes the wall stiffer, but the existing wall must be strong enough to take the fixings.
- Freestanding lining. The C studs are fixed only to the floor and ceiling, with no brackets. It suits walls that are too weak for fixings, or where more space is needed for services. Taller walls need wider studs.
- Fixings and jointing materials from one system, so that studs, screws, tape and compounds are compatible with each other.
How the installation proceeds step by step
- Surveying: the installer checks the existing wall with a laser or a long straightedge and finds where it bulges most. The new line is set from that point so the frame does not touch the old wall anywhere. In homes built before 2000, have suspect materials tested before drilling; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
- Setting out: lines for the perimeter tracks are marked on the floor and ceiling. At the same time the routes of services and the positions of sockets, switches and heavy items are planned.
- Perimeter tracks: U tracks or perimeter channels are fixed to the floor and ceiling with fixings suited to the substrate, with sealing tape underneath. The tape takes up small irregularities and reduces vibration transfer. Tracks against adjoining walls are fixed the same way.
- Vertical studs: studs are set into the tracks, usually at 600 mm centres so that board edges land on a stud. Under tiles or heavier loads the centres are reduced according to the system manufacturer's instructions, typically to around 400 mm. Each stud is aligned to the line.
- Fixing to the wall: on a braced lining the C studs are fixed to the existing wall with brackets at the spacing given by the system manufacturer. Furring channels are always fixed into direct fixing brackets. On a freestanding lining this step is skipped.
- Noggins and services: noggins go in as planned, the electrician runs the cables and the plumber installs the pipework. This is the last point at which anything can easily be added in the cavity.
- Record: before boarding, the positions of services and noggins are photographed or sketched, so it is clear later where it is safe to drill.
- Boarding: boards are screwed to the studs, usually with screws at around 250 mm centres. A gap of about 10 mm is left at the floor so the board does not draw up moisture and can move. Board joints are staggered, with four corners never meeting at one point. With double boarding, the joints of the second layer are offset from the first.
- Openings: holes are cut for back boxes and penetrations, and access panels are fitted.
- Taping and jointing: joints are filled with reinforcing tape and screw heads are spotted. External corners are reinforced with corner tape or corner bead. Depending on the finish required, one or more coats of compound are applied, each drying before the next.
- Sanding and priming: once dry, the compound is sanded and the surface is checked under side lighting. It is then dusted off and primed ready for decorating or tiling.
Furring wall installation price per m² and what affects it
The guide labour price is €18.00 per m². It is calculated on the wall area. For the same area, however, the final total can vary considerably, because the details determine how much work is involved:
- Area and shape: the cheapest per m² is a flat, solid wall in a rectangular room with no openings. On a small area, such as a single wall behind a basin, surveying, travel and preparation take up much of the time. The price per m² is therefore usually higher.
- Room height: at normal heights the work is done from the floor or a stepladder. High ceilings mean wider studs, more brackets, butt-jointed boards and often a scaffold tower. The effort rises significantly.
- Openings and corners: windows, doors and recesses mean reveals, corner beads and a lot of cutting. Each such detail adds more time than its area would suggest.
- Services and penetrations: many sockets, switches and pipe penetrations, access panels and large pipes behind the wall increase both labour and materials.
- Noggins: these are extra work, and it is sensible to have them priced separately in the quote.
- Boarding and board type: double boarding means roughly twice the board work and more materials. Moisture-resistant boards, closer stud centres and tanking in a bathroom also add to the price.
- Finish grade: a full-surface Q3 or Q4 finish needs more coats of compound and more sanding than standard joint filling.
- Substrate for fixings: soft or crumbly masonry makes fixing harder. It needs different fixings or a freestanding lining.
- Condition of the room: working in an occupied home, with protection, cleaning and moving furniture, takes longer than in an empty space.
When comparing quotes, ask whether the price includes taping and jointing and to what grade, materials, noggins, access panels, corner beads and waste removal. Before offcuts and rubble are taken away, check that the carrier is registered with the Environment Agency and ask for a waste transfer note. Electrical and plumbing work behind the wall are usually separate items.
What can be prepared in advance for a smooth installation
- Clear the wall and the space in front of it, at least wide enough to handle boards and a stepladder.
- Have an agreed plan of sockets, switches and wall-mounted items ready before the first day.
- Book the electrician and plumber to come after the frame is up and before boarding. If the installer has to wait for other trades, the wall stays half finished.
- Arrange access for deliveries. Boards are long and heavy, so check whether they fit in the lift and where the van can park.
- Store boards indoors, flat and dry, so they do not bow and can adjust to the room temperature.
- Keep the room at normal room temperature with gentle ventilation. Compound dries slowly in cold and damp conditions, and draughts and direct sunlight do not help either.
- Provide power for tools and lighting, and in a block of flats check the permitted hours for noisy work.
Common mistakes and how they show up later
Forgotten socket or noggin
This shows up when furnishing, when there is nothing solid to fix the kitchen units or TV to. The fix is to open the wall, add what is missing and joint it again.
Studs fixed without checking the line
The wall ends up wavy. After decorating, this shows under side lighting and a straightedge will not sit flat.
Studs, brackets or screws too far apart
The board flexes when pressed, joints crack, and tiles can come loose.
Cross joints in the boards
If joints are not staggered and four corners meet at one point, the wall is weakened there. A cross-shaped crack appears.
Joints without reinforcing tape
Cracks appear after decorating, often during the first winter with the heating on.
Standard board in a bathroom or board touching the floor
The board absorbs moisture, softens and swells. Mould can appear under tiles or paint.
No access to valves and inspection points
When something fails, the wall has to be cut open to reach the stopcock or joint.
No record of services
Hanging a picture or shelf can easily mean drilling through a cable or pipe.
DIY furring wall: points to watch
A competent DIYer can build a furring wall. The method is the same as described above. The differences lie mainly in the tools and in the small details a professional does automatically. Electrical work, however, must be carried out and checked by a qualified electrician. A new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start.
- Have a laser or long spirit level, a drywall screwdriver with depth setting, tin snips, a plasterboard knife and a long straightedge for checking the line.
- Check the line of the studs as the work progresses, not only at the end. Once boarded, no amount of filler will correct an error in the frame.
- Cut boards by scoring the paper face with a knife, snapping the board over an edge and cutting through the back. Chamfer cut edges with a rasp or sandpaper before jointing.
- Set screw heads just below the surface without breaking the paper. A screw that tears the paper does not hold the board.
- Place wedges or offcuts under the boards during fixing to keep the gap at the floor.
- Apply several thin coats of compound rather than one thick one, letting each dry.
- Wear a dust mask and goggles when sanding and seal the room off with plastic sheeting. Gypsum dust spreads through the whole home.
- For a wall carrying heavy items or tiles in a shower, at least get advice from a professional.
If a new ceiling is planned in the same room, it is usually best to coordinate both jobs, see plasterboard ceiling and suspended ceiling installation.
How to check the finished wall
When signing off the work, also look at the wall with a torch held to the side. Raking light reveals unevenness that normal lighting hides.
- the wall is flat and a long straightedge sits against it without significant gaps,
- the board does not flex or creak when pressed,
- joints and screw heads cannot be seen or felt,
- corners and junctions with the ceiling and adjoining walls are clean and free of cracks,
- external corners and reveals are straight and reinforced,
- boards do not stand directly on the floor,
- moisture-resistant boards are used in the bathroom, with tanking wherever water will be present,
- back boxes for sockets and switches are firm and in the planned positions,
- photos or a sketch of the services and noggins behind the wall have been handed over,
- inspection points are accessible and access panels open.
Frequently asked questions
The guide labour price is €18.00 per m² of wall area. The final total rises mainly with high ceilings, many openings and services, noggins, double boarding or a higher finish grade.
Lining walls inside a flat or house does not usually need planning permission. Where the work affects the structure, fire separation or shared services, check the requirements with local building control. Listed buildings need separate consent for internal alterations. In a block of flats, always check the lease and consult the freeholder or managing agent.
It depends on the type of frame, the number of boards and how far out of true the existing wall is. The slimmest option, furring channels on direct fixing brackets with one board, is usually around 4 to 5 cm. With the narrowest C studs and one 12.5 mm board the lining comes to about 6.5 cm, plus any gap to the existing wall. With larger pipes, such as a waste pipe, or with a freestanding lining, the wall will be correspondingly thicker.
Yes, if it is planned in advance. Heavy items are always fixed into noggins or pattresses placed in the frame before boarding. Double boarding makes the wall stronger still. Special plasterboard fixings without a noggin are only intended for lighter items such as pictures or small shelves.
Yes, with moisture-resistant boards and, in wet zones, a tanking system under the tiles. Stud centres are reduced under tiles so that the wall does not flex.
An experienced installer can often frame and board a smaller wall in a day. Jointing needs drying time between coats. For a standard finish, the wall is usually ready for decorating in 2 to 4 days. A full-surface finish, a cold or damp room, or waiting for the electrician or plumber makes it take longer.
Related work
How a single layer plasterboard partition is built, when it is enough, what makes the job harder and how to check the finished wall.
How a flat gypsum board ceiling or suspended ceiling is installed, which boards to choose, what makes the job harder and how to check the result.
How mineral wool is fitted into plasterboard partitions, wall linings and lofts, which material to choose and how to check the finished work.
How a double-layer plasterboard partition is built, when it beats a single-layer wall, which mistakes to avoid and how to check the finished wall.
How a suspended ceiling with a metal grid is installed, which tiles and grid to choose, what makes the job harder and how to check the finished ceiling.
How plasterboard sloped ceilings and flat ceilings are fitted in an attic, what goes into the build-up, where mistakes happen and how to check the work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.