Building work price list: Eaves drip edge installation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Flashing cost | ||||
| Install drip edge | lm | €10.00 / lm | lm | enter quantity- |
| Chimney flashing | lm | €22.00 / lm | lm | enter quantity- |
| Wall / penetration flashing | lm | €16.00 / lm | lm | enter quantity- |
| Capping wall / gable | lm | lm | - | |
Why a roof needs an eaves drip edge
Under the tiles or metal sheeting of a pitched roof there is almost always a secondary waterproofing layer, usually a breathable membrane. It catches water blown under the covering by the wind, snow that works its way underneath and condensation. This water runs down the membrane to the eaves. If the membrane ends loose in mid-air or on a timber board, the water drips onto the rafter ends and into the soffit. The timber there gradually becomes damp and rots, and stains appear on the soffit.
The drip edge is a strip of metal to which the bottom edge of the membrane is bonded. Water runs off it over the edge into the gutter. The tile manufacturer Bramac, in its documentation for the drip edge, refers to roof design standards that require the secondary waterproofing to be drained at the eaves, and it states the use of a drip edge as a condition of its guarantee on the roof's performance.
A drip edge should not be confused with a gutter. The gutter collects water from the roof covering, while the drip edge carries away water from beneath the covering. Fitting gutters and brackets is covered in our article on fitting eaves gutters and gutter brackets.
What needs to be decided before work starts
Metal or plastic drip edge
- a metal drip edge made of galvanised steel with a coloured coating is the most common. For example, drip edges for tiled roofs are 0.55 mm thick, around 20 cm wide and 1.85 m or 2.75 m long. Longitudinal ribs make them stiffer,
- a plastic drip edge made of PVC is also produced in dark colours, is joined with connectors and nailed to the edge board of the roof boarding,
- a PVC-coated metal drip edge is used where the membrane is not bonded to the drip edge but hot-air welded onto it.
Material to suit the gutter and roof covering
The drip edge should be made of a material compatible with the gutter and the other sheet metal components. With copper components, copper should not be placed above zinc, titanium zinc, galvanised steel or aluminium, because run-off from copper corrodes them. Fixings should be of the same metal or stainless steel.
System or made to measure
Roofing manufacturers offer system drip edges with a ready-made profile and a self-adhesive strip for the membrane. A roofing sheet metal worker can also fold one to measure from a flat sheet in the same colour as the gutters. A system drip edge is quicker to fit, while a made-to-measure one suits non-standard eaves.
Fitting on a new or existing roof
On a new roof the drip edge is fitted before the covering and the job is short. On a finished roof where the drip edge is missing, the first courses of the covering have to be removed, the membrane trimmed and adjusted, the drip edge fitted and the covering put back. Retrofitting like this is considerably more labour-intensive.
Eaves flashing on a flat roof
On a flat roof, eaves flashing means the metal trim along the roof edge to which the roof waterproofing is connected. This is not about draining a breathable membrane but about terminating the waterproofing at the roof edge. The detail depends on the waterproofing system and is often made of PVC-coated metal onto which the membrane is welded. Similar work is described in our article on parapet wall flashing on a flat roof.
How the work is done step by step
- Gutter brackets: the gutter brackets are fitted first, because they are fixed into the rafters or the roof boarding, which the drip edge will later cover.
- Positioning the drip edge: the drip edge is laid on the edge board or the first batten so that its lower edge points into the gutter. If the gutter is lower, water from the drip edge falls straight into it.
- Laps and joints: metal drip edges are laid from one end of the roof and overlap each other. For example, one manufacturer of drip edges for tiled roofs specifies a lap of around 5 cm, with one end a few millimetres wider so the pieces slot into each other. Plastic drip edges are joined with connectors.
- Fixing: the drip edge is nailed or screwed into the timber. For plastic drip edges the manufacturer specifies holes along the whole length at 200 mm centres.
- Connecting the membrane: the breathable membrane is brought out over the drip edge and bonded to it. Bonding is done with the self-adhesive strip on the drip edge, double-sided tape, butyl tape or a sealant recommended by the membrane manufacturer. With a PVC-coated drip edge the membrane is welded on.
- Counter battens and battens: the counter battens are stopped just short of the drip edge fold. One membrane manufacturer gives approximately 5 cm for one of its details. The tiling battens are then fitted.
- Ventilation grille: a protective grille or strip against birds and insects is fitted at the eaves. It must not block the ventilated gap beneath the covering.
- Roof covering: only then does the first course of tiles or metal sheeting go on. For metal roofing the manufacturer specifies one screw in every corrugation at the eaves.
In systems where the gutter sits below the battens and the membrane at the eaves is more exposed to the sun, the membrane manufacturer recommends covering its lower part with a UV-resistant strip. This is a detail set by the design or by the roofing sheet metal worker according to the specific roof.
What affects the price
The indicative labour price in our price list is €10.00 per linear metre of eaves edge, excluding materials. The final amount depends mainly on the following:
- new or existing roof: on a new roof the drip edge is simply laid, fixed and the membrane bonded to it. Retrofitting with removal and relaying of the covering is a different job and is priced separately,
- length and complexity of the eaves: straight eaves on a rectangular roof are quick. Hipped roofs, hip corners and cut-outs around dormers mean more cutting and more joints,
- system or folded drip edge: folding to measure from a flat sheet takes more work,
- method of connecting the membrane: bonding to a self-adhesive strip is quick, welding and sealing take longer,
- access: working from scaffolding at first-floor level is safer and faster than from a ladder. Scaffolding is charged separately,
- materials: the drip edge, tape or sealant and fixings are not included in the labour price.
The drip edge is usually fitted together with other roofing sheet metal components. You can price the whole package in our roofing sheet metal work price list.
What needs to be ready
- the roof structure and the roof boarding or edge board at the eaves are complete,
- the gutter brackets are fitted at the height and fall specified in the design,
- it is clear which membrane will be used and what it will be bonded to the drip edge with,
- the drip edge is in the right colour and material to match the gutters and roof covering,
- scaffolding or other safe access to the eaves is in place.
Typical mistakes and how they show up later
Membrane not brought out onto the drip edge
The membrane ends on a board or under a batten, not on the drip edge. Water drips from it onto the rafter ends and into the soffit. Over time stains appear on the soffit and the timber starts to rot. Specialist construction articles list this among the most common mistakes at the eaves.
Drip edge does not end in the gutter
The edge of the drip edge stops short of the gutter or overshoots it. Water runs down the fascia or drips past the gutter onto the wall and the ground.
Membrane not bonded
The membrane just lies loosely on the drip edge. The wind lifts it and water gets underneath, straight into the roof boarding.
Small or reversed laps
Drip edge joints without a lap, or lapped against the direction of water flow, let water into the roof boarding.
Blocked ventilation gap
The grille or the drip edge closes off the air inlet beneath the covering. The roof is poorly ventilated and moisture stays trapped under the covering.
Incompatible metals
A copper drip edge above a galvanised gutter, or fixings of a different metal, cause corrosion where water runs from one metal onto the other.
Drip edge missing altogether
This happens mainly on older roofs. It shows up as damp rafter ends and stains on the soffit, even though the roof does not leak from above.
How to check the finished work
- before the covering is laid: the membrane is brought out over the drip edge and bonded along its whole length,
- the drip edge is straight, without sags, and its edge points into the gutter,
- joints overlap in the direction of water flow and are firmly fixed,
- at corners and hips the drip edge is cut and folded so that water has no way in,
- the ventilation grille is fitted and does not restrict airflow,
- after rain or a test with a hose, no water runs down the fascia or into the soffit.
Once the covering is laid, the drip edge is usually hidden by the first course of tiles. It is therefore worth checking it, or asking for photos, before the roofing sheet metal worker and the roofer move on from that area.
DIY guide: what to watch out for
Fitting a drip edge on a new roof is not technically demanding, but it is work at height at the roof edge. A non-professional should not attempt it without scaffolding or fall protection. If you do take it on, follow these points:
- Work from scaffolding, not from a ladder leaning against the gutter.
- Fit the gutter brackets first, then the drip edge.
- Lay the drip edges from one end of the roof with the lap specified by the manufacturer and with the edge over the gutter.
- Bring the membrane out over the drip edge and bond it along its whole length with a tape or sealant intended for that membrane.
- Use fixings of the same metal or stainless steel.
- When retrofitting on a finished roof, consider using a roofing sheet metal worker. Removing and relaying the covering at the eaves requires experience.
Frequently asked questions
The indicative labour price in our price list is €10.00 per linear metre, excluding materials. For retrofitting on a finished roof, removal and relaying of the first courses of covering are added, plus scaffolding if needed.
Yes. Both terms refer to the metal strip along the bottom edge of the roof to which the membrane is bonded. Eaves flashing is sometimes also used for the metal trim on the edge of a flat roof or on a parapet.
Usually after. The brackets are fixed into the rafters or roof boarding and the drip edge is laid over them. The exact sequence may be adjusted by the roofing manufacturer's instructions.
On top of it. The membrane is brought out over the drip edge and bonded to it so that water from the membrane runs down the drip edge into the gutter.
Yes, if there is a breathable membrane under the covering. Water from the membrane has to be drained somewhere, regardless of whether the roof is covered with tiles or metal.
Yes, but the first courses of covering at the eaves have to be removed, the membrane adjusted, the drip edge fitted and the covering replaced. It is worthwhile if the rafter ends or the soffit are damp.
As specified by the manufacturer. System metal drip edges overlap by approximately 5 cm, plastic ones are joined with connectors. The lap must follow the direction of water flow.
With the self-adhesive strip on the drip edge, double-sided or butyl tape, or a sealant recommended by the membrane manufacturer. With a PVC-coated drip edge the membrane can be hot-air welded on.
Related work
How chimney flashing is fitted, which parts and materials to use, why sealant alone fails, when a back gutter is needed and how to check the work.
What a roof replacement costs: stripping, checking the roof structure, underlay, tiles or metal, flashings, asbestos cement and a 150 m² labour example.
Price list for sheet metal works in 2026: gutters and downpipes, chimney flashing, sills, cappings and metal roofs. What drives the cost and a NUMIQ estimate.
How torch-on bitumen membrane goes on basement walls and parapets: substrate prep, top termination, laps, corners, mistakes and checks before backfill.
How angle standing seam metal facade cladding is installed, which metals are used, what makes the job harder and how to check the finished work.
How eaves guttering is fitted: brackets, fall, joints, outlet and water test. What to consider when choosing materials and checking the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.