Roof Timber Treatment Cost per m²

Roof structures, battens, timber boarding and floor joists are usually made of spruce or fir, which on their own will not hold out for long against fungi, mould and wood-boring insects. That is why structural timber is treated with a wood preservative, either brushed or sprayed on. Carpenters simply call this timber treatment.

Updated 11/2026·9 min read·2 price list items
Standard labour price
€3.50/ m²
Indicative range
€2.80 - €4.55
60 m² flat
€525.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Roof Timber Treatment Cost per m²

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Roof carpentry2 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Treatment

Timber impregnation (coating / spray)m²€3.50 / m²m²enter quantity-
Staining timber / wood + cleaningm²€2.50 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

Why and when timber needs treating

Timber in a roof structure faces three main threats: wood-decaying fungi where moisture persists, mould, and wood-boring insects, above all the house longhorn beetle. A preservative containing fungicides and insecticides keeps them out of the wood. The European standard EN 335 divides timber into use classes according to its environment. According to preservative data sheets, a roof structure under cover falls into use classes 1 to 2, while timber outdoors, such as soffits, pergolas or fences, falls into use class 3, which needs stronger protection.

Treatment is most often carried out in these situations:

  • new roof structure: during roof structure installation the timber is treated before fitting, or the finished structure is treated,
  • battens and counter-battens: when battening a roof the battens are treated if they did not arrive pre-treated from the sawmill,
  • cut surfaces: when treated timber is cut to length, jointed and drilled on site, untreated wood inside is exposed and has to be brushed afterwards,
  • roof replacement: with the old roof structure exposed, this is the only chance to reach every beam,
  • timber floors and boarding: joists and boards in floors, in timber joist floors and in soffits.

When treatment is not enough

Insect-infested timber

Exit holes with bore dust beneath them mean that insects are, or have been, in the wood. A surface coating does not reach deep into the beam. On forums people describe beams that looked sound from the outside but turned out badly damaged inside once cut open, and repeated coating of old timber that did not stop the insects. With heavy infestation the answer is to replace the damaged section or splice in a new piece, as designed by a carpenter or structural engineer. Treatment then protects the rest of the structure as a preventive measure.

Rot after leaks

Soft, crumbling timber around a chimney, a valley or under damaged roofing cannot be saved by any product. First the water has to be stopped, the damaged timber replaced, and only then treated.

Wet timber

A preservative needs timber that is not saturated with water. Specialist articles state that above the fibre saturation point, roughly 30 per cent moisture content, treatment is ineffective. Wet timber also splits as it dries, exposing untreated wood in the cracks.

Pressure injection as a miracle cure

For old roof structures, drilling beams and forcing preservative into the holes is often offered. Specialist articles point out that spruce and fir are very difficult to impregnate and the product only spreads a few millimetres from the hole. Injection does not replace an inspection and repair of damaged members.

What to decide before work starts

Type of product

  • preventive products protect sound timber against fungi, mould and insects. They are used on new roof structures and battens,
  • remedial products are intended for timber already infested by insects. They are used when restoring old roof structures,
  • non-leaching products: if the timber will be exposed to rain before the roof is covered, a product that rain will not wash out is recommended, or the timber should be protected from water.

Products are sold clear, brown or green. The colour mainly helps to check where has already been treated. Specialist articles warn, however, that a green colour on its own does not prove proper treatment.

Brushing or spraying

On site, timber is treated with a brush or a sprayer. Spraying is faster on large areas of the roof structure, while brushing works better into joints, tenons and cracks. In practice the two methods are combined. At the sawmill timber is also dipped in a tank, which is usually impractical for a carpenter on site.

Before or after installation

Timber treated before installation has all faces coated, including those that will be inaccessible in the joints. After installation the cut surfaces and holes must be treated as well. Treating a finished roof structure is simpler to organise, but some surfaces in the joints are left without preservative.

Exposed timber

If the roof structure or ceiling is to remain exposed indoors, the colour of the product matters. According to manufacturers, a clear product may slightly yellow the wood, so it is tested on an offcut first. Exposed timber then also receives a top coat, such as a wood stain.

How the work is done step by step

  1. Checking the timber: the carpenter makes sure the timber is dry and free of bark, dirt and old coatings.
  2. Preparing the product: the concentrate is diluted with water exactly as stated in the technical data sheet. For example, Bochemit QB Hobby is diluted 1 : 2 for brushing and spraying.
  3. Covering surroundings: when treating in a finished building, masonry, windows, insulation and the floor are covered so that no product gets onto them.
  4. First coat or spray: applied evenly to all accessible surfaces, paying particular attention to joints, tenons, wall plates and areas next to masonry.
  5. Drying: the next coat is applied only once the first has dried. The Bochemit technical data sheet gives 4 to 24 hours.
  6. Second coat: for outdoor timber and, depending on the data sheet, indoors too. What matters is reaching the specified amount of product per m².
  7. Cut surfaces: beam ends, tenons and holes for screws and bolts are treated separately.
  8. Checking: with a coloured product, look for any pale patches left behind.

The Bochemit QB Hobby technical data sheet specifies one to two coats for indoor timber at a consumption of at least 80 g of concentrate per m², and two coats and 160 g per m² for outdoor timber. It is applied at temperatures from 5 to 30 °C.

What affects the price

The guide price for labour in the price list is €3.50 per m² of treated timber surface. The timber surface is not the roof area. You count the surface of every member, that is, the perimeter of the cross-section multiplied by the length. A 14 × 16 cm beam has a perimeter of 60 cm, so one linear metre of beam has 0.6 m² of surface. The final cost depends mainly on the following:

  • new or existing structure: loose timber laid on the ground is treated quickly, while an old roof structure in a loft means working in a cramped space and covering the surroundings,
  • number of coats: outdoor timber needs two coats, indoors one to two are often enough,
  • cleaning old timber: dust, cobwebs, pigeon droppings and old coatings must be removed before treatment. For old timber, timber cleaning helps,
  • access: low lofts, insulated areas and spots next to masonry are treated slowly, by hand with a brush,
  • preventive or remedial product: treating infested timber is more demanding and the products tend to cost more,
  • materials: product consumption depends on the area and number of coats. Products should be compared by cost per treated m², not per litre.

In practice, treatment is priced together with the carpentry work. You can work out the total cost of the roof structure in the carpentry structures price list.

What should be ready

  • the timber is dry and protected from rain,
  • with an old roof structure, dust, dirt and loose old coatings have been removed,
  • damaged members have been replaced or their repair has been agreed,
  • the product, its colour and the number of coats have been agreed,
  • no food, animal feed or items that must not be sprayed are stored in the loft,
  • children and animals stay away from the area during the work and while it dries.

Typical mistakes and how they show up later

Treating wet timber

The product does not penetrate the wood, and as it dries cracks appear with untreated wood inside.

Forgotten cut surfaces

Beam ends and tenons are the most vulnerable spots and are exposed when treated timber is cut to length. If they are not coated, the protection in the structure has gaps.

Over-diluted product or too few coats

The timber looks coloured, but it holds less product than the technical data sheet requires. The protection then does not work as the manufacturer promises.

Leachable product and rain

Timber treated with a leachable product and left out in the rain for weeks loses part of its protection before the roof is even covered.

Coating old infested timber instead of repairing it

The insects or fungus carry on working inside the beam. The problem only shows up at the next renovation, when the damage is greater.

Treatment as a substitute for a sound roof

If the roof leaks or the loft is not ventilated, the timber stays damp. Specialists stress that stopping leaks and reducing timber moisture is often more important than the chemicals themselves.

How to check the finished work

  • with a coloured product, the timber is evenly coloured with no pale patches, including the underside of beams and next to masonry,
  • beam ends, tenons and holes for fixings have been treated,
  • there are no runs of product on walls, windows or insulation,
  • the tradesperson can tell you which product was used, at what dilution and how many coats,
  • on exposed timber the colour is uniform and the wood is not blotchy.

Keep a note of the product name and the date of treatment. For outdoor timber, manufacturers state a limited service life for the protection and recommend regular checks; for Bochemit QB Hobby, for example, 10 years and then a check every two years.

DIY guide: what to watch out for

A non-professional can manage treating a smaller quantity of timber or battens. With an old roof structure where insects or rot are suspected, a carpenter, and possibly a structural engineer, is needed. For a DIYer the key points are:

  1. Read the technical data sheet and safety data sheet of the product before buying it.
  2. Treat only dry, clean timber without bark.
  3. Dilute exactly according to the instructions, not by eye.
  4. Coat all faces, including ends and cut surfaces.
  5. Observe the drying time between coats and the working temperature.
  6. Take leftover product and containers to a hazardous waste collection point; do not pour them down the drain or onto the ground.

Wood preservatives are biocides. According to its safety data, Bochemit QB Hobby causes severe skin burns and eye damage and is toxic to aquatic life. When working, wear rubber gloves, protective clothing, goggles or a face shield and, when spraying, a respirator as well.

Frequently asked questions

The guide price for labour in the price list is €3.50 per m² of timber surface, excluding the product. You count the surface of all beams and battens, not the roof area. Treating an old roof structure in a lived-in loft and remedial treatment of infested timber cost more.