Building work price list: Core drilling holes in concrete
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Concrete cutting cost | ||||
| Core drilling holes ø up to 100 mm | pc | €90.00 / pc | pc | enter quantity- |
| Core drilling holes ø 100-200 mm | pc | €140.00 / pc | pc | enter quantity- |
| Core drilling holes ø over 200 mm | pc | €220.00 / pc | pc | enter quantity- |
| Cutting RC panel up to 10 cm | lm | €35.00 / lm | lm | enter quantity- |
| Cutting RC panel up to 15 cm | lm | €50.00 / lm | lm | enter quantity- |
| Cutting concrete walls up to 150 mm thick | lm | €50.00 / lm | lm | enter quantity- |
| Cutting concrete floors up to 100 mm deep | lm | €25.00 / lm | lm | enter quantity- |
| Forming opening in RC panel up to 10 cm | pcs | €75.00 / pcs | pcs | enter quantity- |
| Forming opening in RC panel up to 15 cm | pcs | €105.00 / pcs | pcs | enter quantity- |
| Installation of steel support structure (welded) | pcs | pcs | - | |
| Trimming metal door frames in RC up to 10 cm | pcs | €105.00 / pcs | pcs | enter quantity- |
| Trimming metal door frames in RC up to 15 cm | pcs | €125.00 / pcs | pcs | enter quantity- |
| Chasing for services (electrical, water) | lm | lm | - | |
| Cutting out window or door opening | pcs | pcs | - | |
| Cutting opening in reinforced concrete panel | pcs | pcs | - | |
| Cutting asphalt surfaces | lm | €15.00 / lm | lm | enter quantity- |
When core drilling is worth it
You can make a hole in concrete with a breaker. However, a breaker hammers the structure, the vibration travels into floors and neighbouring walls, and the edge of the hole ends up ragged. A core drill does not smash the structure, it cuts it. The hole has smooth sides and an exact diameter, and needs no further work. That is why core drilling is chosen wherever the rest of the building stays in use and vibration would cause damage: above all in concrete panel blocks of flats, in occupied houses and in load-bearing walls.
The most common uses are penetrations for:
- drainage and water: a waste pipe through the floor slab to the storey below, a water supply through a wall, a penetration into a service shaft,
- ventilation and cooker hoods: extract air from a kitchen or bathroom through an external wall, cooker hood ducting, heat recovery ventilation,
- air conditioning: refrigerant lines, cable and condensate drain between the indoor and outdoor unit when installing air conditioning,
- heating and gas: pipes through a wall or slab, flue gas outlets,
- cables: power and data lines, service connections, cable ducts between buildings,
- anchoring: holes for anchors of steel structures, railings and posts.
According to manufacturers and contractors, rig-mounted drills handle diameters from a few centimetres up to several tens of centimetres, and can drill horizontally, vertically or at an angle. For holes in reinforced concrete panels, which mostly concern owners of flats in panel blocks, you will find details in the articles on cutting a hole in a concrete panel up to 10 cm and up to 15 cm.
What to decide before drilling
Hole diameter
The hole is made slightly larger than the outside diameter of the pipe or cable bundle. The gap then takes a sleeve, a sealing collar or insulation, and the pipe can be fitted without forcing it. For air conditioning, tool manufacturers say the most common diameter is around 55 to 70 mm. For cooker hood and ventilation ducting, the deciding factor is the duct diameter recommended by the hood manufacturer. On forums, people mainly debate whether to make the hole for a 125 or 150 mm duct, because a smaller diameter increases resistance and extractor noise.
The diameter also changes the price band. Holes up to 100 mm, 100 to 200 mm and over 200 mm are charged at different rates. If you are on the borderline, for example with an insulated pipe, it is worth agreeing the core bit size in advance.
Direction and fall
A hole through an external wall is not drilled perfectly level. For air conditioning, a slight fall towards the outside is recommended, in the order of 5 to 10 degrees, so that condensate drains out and rainwater does not run in. Penetrations for cooker hoods and ventilation are handled the same way. Through a floor slab the hole is drilled vertically, and you need to check beforehand exactly where it will come out on the floor below.
Wet or dry drilling
- wet drilling is standard in concrete and reinforced concrete. Water cools the bit and flushes away the dust. It does, however, produce slurry, which has to be caught and vacuumed up. When drilling a floor slab, water can run through to the storey below if nobody plans for it,
- dry drilling is used mainly in masonry, brick and aerated concrete. There is no water, but there is dust, so drilling is done with extraction.
The driller decides which method to use according to the material. You should know whether water is acceptable in the room and prepare the space accordingly.
Structural safety and approvals
A small penetration through a partition wall is routine work. A hole in a load-bearing wall, a floor slab or the external envelope, however, is an intervention in the load-bearing structure and in the common parts of the building. For larger holes, for a series of holes side by side or for slabs, a structural engineer should therefore confirm whether the structure can take the opening and where it may go. Before working in a block of flats, it is wise to inform the building manager and check with the local building authority whether the work needs to be notified. On forums there are recurring cases where a neighbour or the building manager raised a hole in the facade only afterwards, for example for air conditioning, and the owner had to move the unit.
Services and reinforcement in the structure
Before drilling you need to know where electrical cables, water, heating and gas run. A project drawing, old photos from construction or a detector will help. The core bit will also cut through steel reinforcement in reinforced concrete. For exactly this reason, in load-bearing structures the hole is positioned so that it does not cut the main reinforcing bars, and if in doubt, the structural engineer decides.
How the job is done step by step
- Survey and marking out: the driller marks the centre of the hole, the diameter and the angle with you, and checks both sides of the wall or slab.
- Checking for services: the spot is checked with a detector or against the drawings. Affected circuits nearby are switched off and the water is shut off if it runs close by.
- Covering and protection: the floor and furniture are covered with sheeting. When drilling a slab, the space below is also protected, because the core drops out at the end and water can run through.
- Fixing the rig: for larger diameters the drill is mounted on a rig, which is anchored to the structure or held by a vacuum base on a flat surface.
- Connecting water or extraction: for wet drilling, water is connected and a collection ring or a slurry vacuum is placed under the hole. For dry drilling, an industrial vacuum is used.
- Starting and drilling: the bit is started slowly so it does not wander, then advances steadily. In thick structures the bit is extended or the core is removed in sections.
- Removing the core and cleaning up: the core is pulled out, the slurry is vacuumed and the area is washed down.
- Checking and finishing: the diameter and direction of the hole are checked and the rig anchor holes are made good. Fitting the pipe or sleeve and sealing the penetration are separate jobs.
What the price depends on
The price list charges core drilling per hole in a standard wall or slab thickness. For thick structures, such as foundations or external walls over 30 cm, firms often charge a depth surcharge. Indicative labour rates are:
- diameter up to 100 mm: €90.00 per piece,
- diameter 100 to 200 mm: €140.00 per piece,
- diameter over 200 mm: €220.00 per piece.
The final amount is then mainly affected by:
- diameter: a larger bit cuts more material, costs more and wears faster,
- thickness of the structure: in a thick foundation or external wall drilling takes longer and the bit has to be extended, so a depth surcharge is often added to the price per hole,
- material: reinforced concrete with dense reinforcement drills more slowly than brick or aerated concrete and wears the bit more,
- drilling direction: a vertical hole overhead into a slab or an angled hole is more demanding than a horizontal hole in a wall,
- access: a hole high up under the ceiling, in a narrow shaft or right next to a corner needs scaffolding or a different way of fixing the rig,
- water and cleanliness: protecting a furnished flat, catching slurry and cleaning up all add time,
- number of holes in one place: for a single small hole, preparation and travel make up a large part of the price. Ask in advance whether the firm charges a minimum call-out fee,
- related work: a structural assessment, fitting the pipework, sealing the penetration and making good the plaster are not included in the drilling price.
If you need a larger rectangular opening, for example for a door or window, that is not core drilling but concrete cutting with a wall saw.
What should be ready
- it is clear exactly where the hole goes, at what diameter and at what angle,
- for a load-bearing structure there is a structural engineer's opinion, and in a block of flats the building manager knows about the work,
- you know where the services run and the affected circuits can be switched off,
- there is a 230 V socket nearby and, if agreed, a water supply,
- the area around the hole is cleared and there is room for the drill rig,
- the other side of the wall or the space below the slab is accessible and secured so that nobody stands there when the bit breaks through,
- if the hole comes out in a neighbour's property, the neighbour knows and will let you in.
Typical mistakes and how they show up later
Drilling without checking for services
The core bit cuts through everything in its path. A severed cable or pipe then has to be repaired by breaking out around the new hole, which is exactly what core drilling was meant to avoid.
No outward fall
With air conditioning or extract ducting through the facade, condensate or rainwater runs back into the wall. Damp patches appear on the plaster over time.
Diameter too small
The insulated or sleeved pipe will not fit and the hole has to be drilled again with a larger bit. The second drilling costs almost as much as the first.
Space below the slab not protected
The core drops out all at once and water and slurry run down. If nobody has planned for it, it damages the floor or fittings on the storey below, often in a neighbour's home.
Main reinforcement cut without an engineer
The hole looks fine but has weakened the load-bearing structure. In a slab or with a series of holes side by side, this can have consequences that only show up later as cracks.
A breaker instead of a core bit
A hole knocked through a concrete panel with a breaker has broken edges, usually with fallen plaster and cracks around it. Such a hole is hard to seal and repair.
How to check the finished work
- the hole diameter matches what was agreed and the pipe or sleeve fits,
- the hole has the agreed direction and angle, falling slightly outwards in a facade,
- the sides of the hole are smooth and the surrounding area is free of cracks and fallen plaster,
- there is no damage or water marking on the other side of the wall or below the slab,
- circuits and services nearby are working,
- the rig anchor holes are made good and the area is cleaned up.
DIY guide: what to watch out for
A small hole in brick or aerated concrete can be made with a handheld drill and a masonry core bit. For concrete, reinforced concrete and concrete panels, it is better to call a firm with a rig-mounted machine. If you want to hire a core drill, watch out for the following:
- Before drilling, check for services in the wall with a detector and switch off nearby circuits.
- For a load-bearing wall or slab, consult a structural engineer first.
- Do not drill larger diameters freehand. If the bit jams, the drill twists violently, so it belongs on an anchored rig.
- For wet drilling, use only a drill with a PRCD safety switch and make sure water does not run onto the cable or socket.
- Start slowly until the bit has bitten in, and do not force it.
- Secure the other side of the wall or the space below the slab where the core will drop.
Wear safety glasses, ear defenders and gloves, and for dry drilling a dust mask as well.
Frequently asked questions
The price is charged per hole according to diameter. As a guide, it is €90.00 per piece for diameters up to 100 mm, €140.00 per piece for 100 to 200 mm and €220.00 per piece over 200 mm. Fitting the pipework and making good are paid for separately.
Per hole. The listed price applies to a standard wall or slab thickness, and a depth surcharge is added for thicker structures. For a single small hole, though, it is worth asking whether the firm charges a minimum call-out fee.
For air conditioning, around 55 to 70 mm is most common. For a cooker hood, the duct diameter specified by the extractor manufacturer decides, and the hole is slightly larger so the duct and its seal will fit.
For a partition wall, usually not. A load-bearing wall, slab or external envelope is an intervention in the load-bearing structure and, in a block of flats, in the common parts as well. In that case consult a structural engineer, inform the building manager and check with the local building authority whether the work needs to be notified.
Yes, a diamond core bit will cut through steel reinforcement. Whether it may be cut is a structural question, however. In load-bearing structures the hole is positioned so that it does not hit the main reinforcement.
It is noisy, but there is no vibration. Wet drilling produces minimal dust but does create slurry. With dry drilling, the dust is removed with a vacuum.
A breaker smashes the edges of the hole, the vibration spreads through the structure and plaster usually falls away around it. The hole is then harder to seal and make good. Core drilling gives a precise, clean hole.
A pipe or sleeve is fitted and the gap is sealed, against water in a facade and often with fire stopping in a slab. This work is not part of the drilling.
Related work
How a reinforced concrete panel up to 10 cm thick is cut, what to prepare before the cutter arrives, how linear metres are measured and how to check the work.
How door and window openings are cut in reinforced concrete panels up to 15 cm thick, when you need a structural engineer and how to check the result.
How a welded steel frame is fitted in a new opening in a load-bearing wall, what the structural engineer decides and how to check the finished work.
How a steel door frame is cut out of a reinforced concrete wall up to 10 cm thick, what to prepare, what to watch for in a flat and how to check the work.
How a metal door frame cast into a concrete panel up to 10 or 15 cm thick is cut out, what affects the job and how to check the result.
How a hole up to 10 cm is core drilled through a reinforced concrete panel, what to agree first and how to check the finished opening.