A standard installation for a split air conditioning system (one indoor and one outdoor unit, pipe run up to 3 m) costs, according to the NUMIQ price list, 299,30 € per unit. The price includes pipework, power cable, bracket, trunking and commissioning. Each additional metre of pipe run costs from 32,50 €/m, wall chasing 24,95 €/m, making good 10,50 €/m and a longer power supply run 13,50 €/m. The final cost is most influenced by the length of the pipe run, the wall material and access to the outdoor unit.
Up to 3 m is standard; each additional metre is extra, based on the unit's capacity.
Surface trunking is included; wall chasing and core drilling are extra.
Power supply up to 3 m is included; a longer run is an additional cost.
Roofs, installations under windows or heights above 3 m are non-standard.
Air conditioning installation price list 2026
The installation price isn't a single number. First, see what's included in a standard installation, then add the cost for extra pipe run metres and any building work your walls require.
- Installation and commissioning of one indoor and one outdoor unit under standard conditions
- Interconnecting copper pipework in vapour-proof insulation up to 3 m long
- Electrical power supply and interconnecting cable up to 3 m long
- 1x wall penetration through a standard wall and gravity-fed condensate drainage to the outdoor unit
- Installation accessories, such as a wall bracket for the outdoor unit
- Aesthetic surface trunking including fittings to conceal the pipe run
- Nitrogen pressure test, system evacuation and test run
- User training and completion of the commissioning record
The items listed describe the scope of a standard installation. The current price is displayed in the price book according to the selected region.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
| Klimatizácia | ||||
| Split air conditioning installation (indoor/outdoor unit) up to 3m pipe run | pc | 299,30 € / pc | pc | enter quantity- |
| Multi-split air conditioning installation (2 indoor + 1 outdoor unit, up to 3 m pipe run) | set | set | - | |
| Multi-split AC installation (3 indoor + 1 outdoor unit) incl. pipework up to 3 m | set | set | - | |
| Chasing walls for air conditioning pipework | m | 24,95 € / m | m | enter quantity- |
| Making good chases after air conditioning pipework installation | m | 10,50 € / m | m | enter quantity- |
| Electrical cable supply line | m | 13,50 € / m | m | enter quantity- |
| Hole through non-load-bearing wall up to 100 mm thick | ea | 25,00 € / ea | ea | enter quantity- |
| Core drill penetration load-bearing wall up to 25 cm | pc | 40,00 € / pc | pc | enter quantity- |
| Refrigerant pipe run extension over 3 m, 2.5 to 3.5 kW unit | m | 32,50 € / m | m | enter quantity- |
| Refrigerant pipe run extension over 3 m, 5 kW unit | m | 36,60 € / m | m | enter quantity- |
| Refrigerant pipe run extension over 3 m, 7 kW unit | m | 40,70 € / m | m | enter quantity- |
| Lightweight mobile aluminium scaffold tower for exterior work up to 2 storeys | storey | 100,00 € / storey | storey | enter quantity- |
| Unit capacity | Typical use | Price per metre |
|---|---|---|
| 2.5 and 3.5 kW | bedroom, children's bedroom, small flat | 32,50 €/m |
| 5 kW | living room with kitchen | 36,60 €/m |
| 7 kW | open-plan space, house | 40,70 €/m |
More powerful units require larger diameter pipework, which is why the cost per metre is higher. The price includes material and labour.
The surcharge depends on the complexity of the task and will be determined during a site survey.
Types of work and their prices
The most common solution for a single room or bedroom, includes a pipe run up to 3 m.
One outdoor unit serves multiple rooms, but involves more pipework and connections.
Concealed pipe run in brick or blockwork. Not typically done in structural concrete without consent.
Power supply over 3 m, typically a dedicated circuit from the consumer unit.
Method of work
- 01Site survey: unit positions, pipe run length, condensate drain method and required capacity are confirmed.
- 02The indoor unit's mounting plate and the outdoor unit's bracket are fixed to a solid structural layer.
- 03A core hole is drilled through the wall with a slight downward fall to the outside, and channels are chased if required.
- 04The insulated copper pipework, condensate drain and interconnecting cable are installed without kinks.
- 05The pipework is cut, deburred and flared. Connections are tightened to the correct torque with a torque wrench.
- 06The circuit is pressurised with oxygen-free nitrogen and all joints are checked for leaks.
- 07The circuit is evacuated to below 500 microns (approx. 67 Pa) and the vacuum is held for 10 to 15 minutes to check for leaks.
- 08Service valves are opened, the unit is energised, and the condensate drain is tested with water.
- 09The supply air temperature, temperature differential and current draw are measured.
- 10Only after a successful leak test are the chases made good, trunking fitted and the user shown how to operate the unit.
- Two-stage vacuum pump and digital vacuum gauge
- Nitrogen cylinder with regulator
- Flaring tool and torque wrench
- Pipe cutter, deburring tool and pipe bender
- Core drill
- Refrigerant leak detector
Reveals any leaks in the connections before the refrigerant is released.
Removes air and moisture that damage the oil and compressor.
Checks temperatures, pressures, condensate drainage, vibrations and noise levels.
| Checklist Point | Correct Execution | Warning Sign |
|---|---|---|
| Copper pipework | No kinks, joints accessible and insulated | Hidden kink under insulation |
| Condensate drain | Continuous fall, tested with water | Counter-fall or drain terminates on facade |
| Electrics | Dedicated circuit, wires terminated with ferrules | Loose stranded wires under terminal |
| Outdoor unit | Solid bracket and anti-vibration mounts | Vibrations transferring into the wall |
| Commissioning | Pressure test, vacuum and logged readings | Just opening the valves without any checks |
What's included in a standard installation and what costs extra
A standard split air conditioning installation is a clearly defined package. The price includes the installation and commissioning of both units, one wall penetration through a standard wall, copper interconnecting pipework and electrical wiring up to 3 metres, gravity-fed condensate drainage to the outdoor unit, a wall bracket for the outdoor unit, aesthetic surface trunking with fittings, user training, and a commissioning record. You can find a complete list and current prices in the price book above.
Three groups of work are typically charged as extras:
- Longer pipe runs. Every metre over the standard 3 metres is charged based on the unit's capacity, as more powerful units require larger diameter pipework.
- Building work. Chasing channels into walls and making good, a second hole, or core drilling through reinforced concrete or externally insulated walls.
- Non-standard conditions. Installation on a roof, under a window, or at a height above 3 metres requiring scaffolding or a platform. The surcharge is determined by the complexity during a site survey.
This is precisely why itemised quotes make more sense than a single lump sum. The customer can check such an offer and the tradesperson can justify it, because every metre and every hole has its place.
Split, multi-split and installing air conditioning in a flat
A 'split' system consists of one indoor and one outdoor unit. It is the cheapest, most reliable, and easiest solution to service. A 'multi-split' connects two or more indoor units to a single outdoor unit, most commonly two or three in residential properties. This saves space on the facade or balcony, but the pipe runs are longer, there are more connections, and a fault in the outdoor unit will shut down the system in all rooms at once. For two adjacent rooms, the difference is often small, but for three rooms, a multi-split starts to make sense.
If you're looking for air conditioning for a flat with installation, always factor in two parts of the price: the equipment, based on brand and capacity, and the installation, based on the price list. If you receive an 'all-in-one' price for the unit and installation, be sure to break it down. These offers often hide very short pipe runs, cheap insulation, or the lack of proper evacuation and pressure testing.
Flat vs. house: how the installation differs
A flat in a block of flats. The pipe run is usually short, with the outdoor unit placed on a balcony or on the facade directly behind the indoor unit. The constraints are more often legal and structural. The external wall and facade are common parts of the building, so if you are a leaseholder, you must verify the requirements and obtain consent, a 'Licence for Alterations', from your freeholder or managing agent before ordering the installation. In concrete-panel buildings, horizontal chases in load-bearing walls are not typically made without a structural engineer's report and the freeholder's consent. The pipe run is usually concealed in trunking or passed directly through the wall behind the indoor unit. Flats do not benefit from permitted development rights, so planning permission may be required for any external unit. Always check with your local planning authority.
A house. You do not need your neighbours' consent, but pipe runs can be longer, often passing through insulated walls, and the outdoor unit may be ground-mounted or on a bracket near a patio. With an insulated facade, the wall penetration must be sealed correctly to prevent thermal bridging and water ingress behind the insulation. The condensate can be routed to a soakaway or a rainwater drain. For multiple rooms on different floors, a multi-split or two separate split systems are more commonly used. Installation is often covered by permitted development rights, but it is always wise to check with your local planning authority, particularly for listed buildings and conservation areas, or if the unit will be close to your boundary.
Choosing the right air conditioning capacity
People often ask about the unit's capacity along with the price, which is the right approach. An undersized unit will run at full power constantly, while an oversized one will cycle on and off frequently when the cooling demand drops below its lowest modulated output. The table below gives a rough guide based on floor area, assuming a standard ceiling height and average insulation. Large south-facing windows, a room in a converted loft, or an office with several people will push the required capacity up a level. The final design should be specified by the installer during a site survey.
| Room area | Approx. cooling capacity | Typically |
|---|---|---|
| up to 25 m² | 2.5 kW | bedroom, children's bedroom |
| 25 to 35 m² | 3.5 kW | living room in a flat |
| 35 to 50 m² | 5 kW | living room with kitchen |
| 50 to 70 m² | 7 kW | open-plan space, loft |
Approximate guide for ceiling heights up to 2.7 m and standard insulation. Large south-facing windows, a loft room or a high-occupancy room will require the next size up. The installer will make a precise recommendation during the site survey.
Copper pipework and insulation: no place for shortcuts
The interconnecting pipework is connected to the units with flared joints; any other joints in the run are made by brazing. The entire circuit operates under high pressure and must remain hermetically sealed for the lifespan of the equipment. Modern units primarily use R32 refrigerant, with newer models also using R290. High-GWP refrigerants such as R410A are being phased out of new equipment. UK placing-on-the-market rules are evolving, so it is best to check the current requirements at the time of purchase and installation.
- Wall thickness of 0.8 mm. For common pipe dimensions of 1/4", 3/8", and 1/2", this is the standard for refrigeration pipework according to EN 12735-1, designed for the pressures of modern refrigerants.
- 99.9% copper purity. Refrigeration-grade Cu-DHP copper is annealed, internally dried, and sealed at the factory with plugs to prevent moisture or dirt from entering.
- Vapour-proof insulation. Closed-cell insulation prevents condensation from forming on the cold pipework. Outdoors, it must be UV-resistant, otherwise it will disintegrate after two or three seasons.
Why not use standard plumber's copper from a DIY store? Not because it's too thin, as EN 1057 copper often has a 1 mm wall thickness. The problem is that it is usually supplied in a hard temper, making it difficult to bend. Its interior is not dried or sealed, and its metric dimensions do not fit imperial flare nuts. Moisture and impurities in the circuit will contaminate the compressor oil and are the most common cause of a seized compressor.
Copper pipe should be bent using a proper pipe bender or spring to precise radii. A kink under the insulation may not be visible, but the restricted cross-section increases noise, compressor load, and energy consumption. An overly short pipe run is just as damaging. Manufacturers specify a minimum line length because the pipework helps to dampen vibrations and ensures proper oil distribution within the circuit.
Condensate drainage without neighbourly disputes
When cooling, the indoor unit removes moisture from the air, and this condensate must drain away somewhere. In a block of flats, condensate is the most common cause of disputes with neighbours and damage to walls.
- A fall of at least 1%. That's one centimetre for every metre, along the entire length and with no upward gradients.
- No unnecessary bends. Every high point can trap dirt, leading to a blocked drain over time.
- Insulated drain hose. Airborne moisture will condense on an uninsulated hose inside a wall chase, leading directly to damp within the wall structure.
If the drain doesn't have a consistent fall, water will find its way where it shouldn't, almost always into the wall beneath the indoor unit. Connecting to the flat's internal waste system is a neat solution, but only through a suitable trap with a dry seal or a waterless membrane, which will prevent odours even if the water in a traditional trap evaporates in winter. Terminating the drain on the facade is the simplest option, but if water drips onto a neighbour's balcony or a public footpath, conflict is certain. In winter, water produced outdoors during the heating and defrost cycle must also be safely drained to prevent slip hazards caused by ice.
A condensate pump is the solution where a gravity drain isn't possible. However, it operates cyclically and can be heard in a quiet room. Only choose a pump for a bedroom or children's bedroom if there is truly no other option, and always opt for a quiet model.
Electrics and circuit protection
An electrical supply of up to 3 metres is part of a standard installation. A longer supply, typically a new dedicated circuit from the consumer unit, is charged as an extra per metre. The circuit breaker (MCB) and cable size are chosen according to the manufacturer's requirements and installation conditions, such as the length of the run and how the cable is installed. For units up to 3.5 kW, a 10 A to 16 A MCB and a 1.5 mm² or 2.5 mm² 3-core cable are typical. The stranded conductors of the interconnecting cable must be terminated with ferrules, otherwise they can loosen under the terminal screw over time, causing the connection to overheat. In England and Wales, a new electrical circuit is notifiable work under Part P of the Building Regulations and must be installed and certified by a registered electrician.
Getting permission for the installation
In a block of flats, both the outdoor unit and the hole through the wall affect common parts of the building. If you are a leaseholder, you will almost certainly need formal consent from the freeholder or managing agent before any work begins, a process known as applying for a 'Licence for Alterations'. Installing a unit without permission can lead to enforcement action and the cost of removal. For installations on a balcony or loggia, the rules might be simpler, but you should still check with your managing agent in advance, as the hole still passes through a shared structural wall. Flats do not benefit from permitted development rights, so planning permission may be required for any external unit. Always check with your local planning authority, particularly if your property is listed or in a conservation area.
A request to your freeholder or managing agent should contain at least the following information:
- The leaseholder's name, flat number, floor, and contact details.
- The make, model, and capacity of the unit, plus the dimensions, weight, and noise level (in dB) of the outdoor unit.
- The precise proposed location of the outdoor unit, ideally with a photograph or sketch.
- The proposed route for the pipework, the method of drilling, and how the condensate will be drained.
- Details of the installation company, including their F-gas company certificate number, and the lead engineer's F-gas qualification.
- A commitment to return the facade to its original condition upon removal and to be responsible for any damage caused.
Example wording: “I am writing to request consent for the installation of an air conditioning outdoor unit at [location] for flat no. [number], and for a core drill of [diameter] mm through the external wall. Condensate will be drained via [method]. The installation will be carried out by the F-gas certified company [Company Name, certificate no.]. I undertake to bear all maintenance costs and to restore the facade to its original condition upon any future removal.” Always verify the required format and content with your managing agent before submitting. This is general information and not legal advice.
Certification and F-gas regulations
Air conditioners containing refrigerants like R32 or R410A contain fluorinated greenhouse gases. Any work on the refrigerant circuit, including flaring pipes, evacuating the system, and opening the service valves, may only be carried out by a person with a valid F-gas certificate, for example City & Guilds 2079 Category I. The installation company must also hold F-gas company certification. Manufacturers will usually void the warranty without proof of professional installation by a certified engineer. While you can prepare chases or mount the bracket yourself, the electrical supply is a job for an electrician, and connecting the refrigerant circuit and commissioning the system must be done by a certified technician who will record the values in the commissioning log.
Frequently asked questions
Yes, a standard installation includes copper pipework and power cable up to 3 metres, an outdoor unit bracket, surface trunking, and all necessary fixings. The air conditioning unit itself is not included in the installation price.
This depends on the capacity of the unit. For 2.5 kW and 3.5 kW units, the cost per metre is lowest. For 5 kW and 7 kW units, it is more expensive because larger diameter pipework is required. You can find the current rates in the table of surcharges.
For a flat, you typically need consent from the freeholder or managing agent, not your neighbours. For a house, neighbour consent isn't required, but you must comply with planning rules and any local restrictions. It is always best to check with your local planning authority.
A standard split unit installation typically takes 3 to 5 hours. A multi-split system, chasing walls, or working at height can extend the installation to a full day.
Yes. A vacuum and pressure test can be performed even in light frost, and installers often have better availability in winter. If the outdoor temperature doesn't allow for a full cooling test, the heating mode will be tested as per the manufacturer's instructions, and the cooling performance can be fully checked on the first warmer day.
A condensate pump will be used, which is a separate extra item. For bedrooms, only a quiet-running model is recommended.
Related work
How multi-split air conditioning is installed, when it beats separate units, who may handle refrigerant and how to check the finished work.
Price list for heating work in 2026: radiators, pipework, underfloor heating and boiler connection. What the cost depends on and a quick estimate in NUMIQ.
When and how to drain a central heating system, what to watch for with radiators and underfloor heating, and how to refill and bleed it.
How a radiator is taken off the wall and refitted, what makes the job harder, what to consider in a flat and how to check the finished work.
How a radiator is boxed in with plasterboard, timber, MDF or metal, what to watch with airflow and valves, and how to check the finished cover.
How underfloor heating pipes are covered with screed, which screed to choose, why the pressure test matters and how to heat the floor up for the first time.
How a floor chase for heating pipes is cut, what makes the job harder, what to watch for in a block of flats and how to check the finished work.
How radiator valves are fitted and replaced, which valve types to choose, common mistakes to avoid and how to check the finished work.
How a heating system is filled, what pressure to set, how to bleed radiators and what to check once the work is finished.
When to bleed a radiator and top up heating pressure, how the job is done, common mistakes and how to check the system heats evenly again.
How pipe freezing works, when it beats draining down the heating, what makes the job harder and how to check the finished work.
How a gas or electric boiler is removed, who is allowed to do it, what makes the job harder and how to dispose of the old boiler properly.
How a water heater or hot water cylinder is removed, what makes the job harder, when you need a professional and how to dispose of the old tank.
What smart thermostat pre-wiring involves, where to place the thermostat, what to prepare at the boiler and how to check the finished work.
How a heating or hot water circulation pump is fitted or replaced, how to choose the right type and what to check when the work is finished.
What a low loss header does, when your heating needs one, how it is fitted to an existing system and what to check before you accept the work.
How an expansion vessel in a heating system is fitted or replaced, how the pre-charge is set, which mistakes to avoid and how to check the finished job.
How an underfloor heating manifold is installed, balanced and pressure tested. What to watch out for and how to check the finished work.
How a hot water recirculation loop is installed, when it is worth it, which pump and controls to choose and what to check at handover.
How a hot water recirculation pump is installed, when it pays off, which pump and controls to choose and what to check before you accept the work.
What bonding a heating system means, how the boiler, pipes and cylinder connect to protective bonding, and how to check the finished work.
How threads are cut on steel and galvanised pipe, which thread type suits water, heating and gas, and how to check a threaded joint for leaks.
When steel heating pipework is welded with an oxy-acetylene flame, how the job is done, what to watch out for and how to check the finished weld.
How radiator brackets are fixed to concrete, brick, aerated block and plasterboard, what to watch out for and how to check the finished fixing.
When a thermostatic radiator valve needs replacing, how the job is done, which valve type to choose and what to watch for in flats and houses.
How a radiator lockshield (return) valve is replaced in a house or flat, how to choose the right replacement, how to set it and how to check the work.
How underfloor heating pipes are laid, which systems and pipes to choose, what to prepare before the installers arrive and how to check the finished work.
How underfloor heating system boards are laid, what to prepare, which board types exist, which mistakes to avoid and how to check the work before screeding.
How an air-to-water heat pump is installed, what to prepare, where the outdoor unit should go, which mistakes to avoid and how to check the finished work.
How a gas condensing boiler is installed, why the flue and condensate matter, what to prepare, which mistakes to avoid and how to check the finished work.
How to fill cable chases and back box openings after rewiring, which filler to choose, common mistakes and how to check the wall before painting.
Price list for electrical installation work in 2026: cabling, sockets, switches, lighting and fuse boards. What affects the cost and a quick estimate in NUMIQ.
When you need an electrical condition report for your flat, who may issue it, what is tested and how to check the finished report.
What erecting, hiring and dismantling facade scaffolding up to 10 m covers for external wall insulation, how the job runs and how to check the scaffold.
How coloured wall painting is done, which paint to choose, what makes the job harder and how to check the result. Practical advice for flats and houses.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.