Building work price list: Grinding Subfloor before Levelling, Removing Adhesive and Bitumen
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Preparation | ||||
| Subfloor sanding before levelling (adhesive/tar removal) | m² | €4.50 / m² | m² | enter quantity- |
| Removal of existing floating flooring | m² | €2.80 / m² | m² | enter quantity- |
| Skirting board removal | m | €1.20 / m | m | enter quantity- |
| Removal of glued linoleum flooring | m² | €4.50 / m² | m² | enter quantity- |
| Grinding concrete subfloor | m² | €9.50 / m² | m² | enter quantity- |
| Subfloor priming + corner caulking | m² | €3.50 / m² | m² | enter quantity- |
| Subfloor priming | m² | €1.90 / m² | m² | enter quantity- |
| Self-levelling compound | m² | €6.90 / m² | m² | enter quantity- |
| Perimeter expansion tape | lm | €2.50 / lm | lm | enter quantity- |
| Expanded clay (Liapor) levelling fill | m² | €14.50 / m² | m² | enter quantity- |
| Install OSB boarding to floor | m² | m² | - | |
| Wood fibre underlay board 20 mm (thermal and impact sound insulation) | m² | m² | - | |
| Torch-on bitumen felt (1 layer) | m² | m² | - | |
| Force-fit joint stitching with resin and wave connectors | pc | €18.00 / pc | pc | enter quantity- |
What subfloor grinding is and when it is needed
When old parquet, vinyl sheet or carpet comes up, a layer of adhesive or black bitumen is usually left on the concrete. Pouring levelling compound onto that surface is a risk. Grinding the subfloor removes these residues mechanically and gives an even surface, so that the primer and the levelling compound have something sound to grip. It is one of the preparation stages within flooring work.
It is needed in almost every case where a new levelling layer goes down after the old floor covering has been stripped out. A typical example is the refurbishment of an older flat or a brick-built house. New LVT, laminate, tiles or carpet all need a flat, sound base. The result of this work is invisible once the floor is finished, yet it decides whether the new covering lasts for years or starts cracking and sounding hollow after a few months.
Why levelling compound does not hold on old adhesive and bitumen
Old adhesive and bitumen are often soft, greasy or only weakly bonded to the concrete. The levelling compound flows over them, but it bonds only to the residue, not to the sound subfloor. When the old adhesive moves under load or with changes in temperature, the levelling layer debonds, cracks or leaves a void underneath. After a few months this shows up as a hollow sound when tapped, cracked tiles, or vinyl that flexes and marks over the loose areas.
Grinding therefore has two jobs: to remove everything that is not sound, and to roughen the surface so that the primer soaks in and the levelling compound adheres.
First, find out what adhesive is on the floor
Before the grinder is switched on, it is worth knowing what adhesive is actually on the floor. In older flats and houses this is not just a technical question but a health one.
- Glossy black bitumen under old parquet may be coal tar based. These adhesives can contain harmful polycyclic aromatic hydrocarbons (PAHs), which are released into the dust during grinding.
- Old vinyl or thermoplastic floor tiles and some adhesives from past decades can contain asbestos. If there is any suspicion, the material should be tested. Asbestos removal must be left to a suitably licensed contractor. Guidance is available from the Health and Safety Executive.
- Ordinary water-based adhesives under carpet or vinyl tend to be lighter in colour and softer, and they smear rather than crumble when ground.
With black bitumen, or old tiles that you are not sure about, have a sample tested before work starts. Once the material has been ground, the dust is already in the room and precautions come too late.
The subfloor itself also needs assessing. A sound sand and cement screed is ground differently from a crumbling old screed or a timber subfloor. Timber is worked more gently so that it is not ground too thin. It also needs a levelling compound that the manufacturer expressly approves for timber.
What to decide before grinding
Grinding is only one step in a sequence. If it is not clear in advance what comes next, the subfloor can easily be prepared differently from what the levelling compound or the new floor needs.
- What floor goes on top: thin vinyl or glued carpet shows every defect in the base, so it needs more thorough preparation than floating laminate on an underlay.
- Which levelling compound is used: different compounds make different demands on the subfloor and primer. The floor layer should grind with the technical data sheet of the specific product in mind.
- Who does the follow-on work: it helps when one firm carries out the grinding, priming and levelling. When the work is split between several trades, it is harder to establish who is responsible for a debonded levelling layer.
- Who deals with the waste: dust and adhesive residue have to be taken away. Waste from coal tar bitumen and materials containing asbestos is hazardous waste. It does not go into an ordinary skip but must be handed to a firm authorised to accept it.
- Whether moisture is measured: with a screed that may have got wet, or on ground floors and in basements, it is sensible to agree a moisture test before levelling. The carbide method (CM) is often used, and in the UK a hygrometer test for relative humidity is also common. For cement screeds a limit of around 2 % CM is usually given for most coverings, for anhydrite screeds around 0.5 % CM, and lower still with underfloor heating. The binding values are those in the data sheets for the levelling compound and the floor covering.
How grinding adhesive off concrete is done step by step
- Clear the room, remove the skirting boards and seal doors, thresholds and openings where dust could escape.
- Scrape off thick deposits of adhesive, which would otherwise clog the tooling unnecessarily.
- Grind the whole area with a floor grinder fitted with coarse diamond tooling and connected to an industrial vacuum.
- Finish edges, corners and areas along walls with a smaller hand grinder where the large machine cannot reach.
- If needed, go over the area with finer tooling to give a uniform surface.
- Vacuum the whole area thoroughly, including corners - sweeping is not enough.
- Check the subfloor for soundness, cleanliness and flatness, and mark areas for repair.
After grinding comes floor priming before levelling, matched to the subfloor and compound, and where needed sealing of corners and service penetrations or fitting a perimeter expansion strip so that the compound does not run into gaps. That, however, belongs to the next work items.
Grinding, scarifying or another solution
Grinding is not always the only option. The floor layer chooses the method according to what is found on the floor.
- A thin layer of adhesive on sound concrete: standard grinding with diamond tooling is enough.
- Very thick deposits of bitumen or adhesive: it is often quicker to scarify or remove them mechanically first and then grind.
- Crumbling, cracked or weak screed: grinding will not solve the problem. The weak layer must be removed and repaired with a repair mortar, sometimes with a new screed. The wider process is covered under grinding and levelling concrete subfloors before installation.
- Large differences in height: grinding does not level a floor. These are dealt with by a levelling compound of suitable thickness or a levelling screed.
- Residues that cannot be removed completely: some manufacturers offer primer systems designed for old adhesive residues. This solution must, however, be expressly allowed in the technical data sheet.
What the price of removing adhesive and bitumen depends on
The guide labour price is €4.50 per m². The difficulty and time can still differ considerably between two flats of the same size. The price depends mainly on:
- Type of adhesive: hard, brittle adhesive grinds relatively quickly. Soft, sticky adhesive smears on the tooling, grinds more slowly, and the tooling needs cleaning or changing more often. This noticeably extends the job.
- Thickness of the layer: a thin film left by carpet is the simplest case. Thick deposits of bitumen may need scarifying or several passes, which can raise the price per m² several times over compared with a thin layer.
- Black bitumen and hazardous materials: with bitumen, dust protection, more thorough extraction and disposal of hazardous waste are also involved. Asbestos is a separate job for a licensed contractor and is not part of the normal grinding price.
- Condition of the subfloor: sound concrete is the cheapest. A timber subfloor needs a gentler, slower approach. Crumbling screed, cracks and holes mean further repairs, charged extra.
- Room layout: many corners, recesses and pipe penetrations mean more work with the small grinder. A bathroom or hallway is therefore usually more expensive per m² than a large rectangular living room.
- Area: on very small areas, travel and machine set-up make up a large share of the cost, so some tradespeople charge a minimum call-out fee.
- Waste removal and disposal: usually a separate item, and more expensive for hazardous materials.
When comparing quotes, ask whether the price includes scraping thick deposits, finishing the edges, vacuuming and waste removal, or only running the grinder over the floor.
What makes the job easier and what slows it down
Preparation by the customer and sensible site organisation save a lot of time.
- An empty room: if the floor layer first has to move furniture, time is lost and the furniture is exposed to dust.
- Old covering already removed: it helps when the old parquet, vinyl or carpet is already up and the thick residues scraped off.
- Power supply: floor grinders and industrial vacuums draw a lot of power. Larger machines may need a higher-rated or three-phase supply, which most homes do not have. Check in advance with the floor layer what is needed and whether it is available.
- Access and removal: a lift, a clear hallway and an agreed place for a skip or waste bags speed up the work.
- Blocks of flats: keep to agreed working hours and arrange access and waste removal with the managing agent or residents' association. Grinding is noisy, and stoppages caused by neighbours' complaints are avoidable.
- Other trades on site: no other tradespeople should work in the room during grinding. Dust gets into fresh plaster or paint, and they in turn dirty the prepared subfloor.
Typical mistakes and how they show later
- Ground only "for show": small islands of adhesive are left on the surface. That is exactly where the levelling layer later debonds and the floor above starts to sound hollow.
- Over-aggressive grinding: grooves and holes appear in the concrete, and timber is weakened. Deep grooves can sometimes telegraph through a thin levelling layer and thin vinyl.
- Wrong tooling: soft adhesive needs different tooling from hard concrete. The wrong choice means slow work and an uneven result.
- Grinding without extraction: dust spreads through the whole flat, and a fine layer on the floor reduces primer adhesion. The levelling compound then bonds to dust, not to concrete.
- Ignoring moisture: a damp screed must be identified before levelling. The permitted moisture level is set by the manufacturer of the levelling compound and the floor covering, and is usually stricter for anhydrite screeds than for cement screeds. Otherwise there is a risk of blistering, debonded coverings and mould.
- Grinding unknown black bitumen without testing: an unnecessary health risk for both the tradespeople and the occupants, with dust settling throughout the home.
- Neglected edges and corners: the middle of the floor is clean, but a strip of adhesive remains along the walls. That is where the levelling layer starts to lift and crack.
How to check the ground subfloor
Before priming and levelling, inspect the subfloor yourself or together with the floor layer. In practice a problem is often discovered only after the compound has been poured, when it is too late.
- no continuous adhesive or bitumen residue is visible on the surface,
- the subfloor is sound and does not crumble or dust when scratched with a key,
- no hollow areas can be heard when tapped,
- the surface is evenly roughened, without deep grooves or holes,
- edges, corners and areas along walls are as clean as the middle,
- the area is vacuumed and no dust remains on your palm when you run it over the surface,
- larger irregularities and cracks are marked for repair,
- the moisture content of the subfloor is known or a test before levelling has been agreed,
- the grinding waste has been removed and, in the case of hazardous materials, disposed of in line with the regulations.
What you can do yourself
Grinding with a floor grinder is physically demanding, and without experience it is easy to grind too deep into the concrete or, conversely, leave adhesive behind. Savings can still be made on preparation, which is safe and simple:
- Clear the room, including curtains and items on the walls that would get dusty.
- Remove the skirting boards.
- Strip out the old covering - carpet, vinyl or parquet - provided there is no suspicion of asbestos or coal tar bitumen.
- Scrape thick adhesive deposits with a hand scraper or a long-handled floor scraper, wearing gloves and a respirator.
- Sweep up and take out the waste so that the floor layer can start grinding straight away.
With glossy black bitumen and old vinyl or thermoplastic tiles, do not start stripping or scraping until the test result is known.
Frequently asked questions
The guide price is €4.50 per m². The final amount depends mainly on the type and thickness of the adhesive, whether it is black bitumen, the condition of the subfloor, the room layout and whether waste removal is included.
In most cases it is not suitable. The compound would bond only to the adhesive, not to the sound subfloor, so there is a risk of debonding and cracking. The exception is systems that the manufacturer expressly states are designed for old adhesive residues, and even then only on thin, firmly bonded layers.
It can be. Older black adhesives were often coal tar based and can contain harmful substances that get into the dust during grinding. If this is confirmed, the work should be done by a firm equipped for such material, with extraction, enclosure of the area and FFP3 respirators. The waste is disposed of as hazardous waste.
It depends on the area, the thickness of the adhesive and the room layout. A room of around 15 to 20 m² with a thin layer of adhesive on sound concrete is usually finished in half a day to a day, including edges and vacuuming. Thick bitumen deposits, soft adhesive or a whole flat can take several days.
With a grinder connected to an industrial vacuum, most of the dust is captured during the work. Even so, it is sensible to seal the doors, switch off any ventilation to other rooms and remove items that could get dusty.
Floor grinders can be hired, but besides the machine you need suitable diamond tooling, an industrial vacuum and the experience to judge how long and with what pressure to grind. The result also decides whether the levelling layer will hold. It is more sensible to prepare the room yourself as described above and leave the grinding to a floor layer.
Grinding itself does not wet the subfloor, so levelling can follow soon after. In between, however, the subfloor must be vacuumed, the marked areas repaired and the primer applied and left to dry as stated in the technical data sheet. If the screed is suspected of being damp, levelling waits for the moisture test result.
Related work
When to grind a concrete subfloor before new flooring, how the job is done, what makes it harder and how to check the surface is ready.
How to fit a perimeter expansion strip before pouring levelling compound or screed, which strip to choose and how to check the finished work.
How to prime a floor before levelling, which primer suits which subfloor, when to seal corners and gaps, and how to check the floor is ready.
When self-levelling compound makes sense, how to prepare the subfloor, how to pour it properly and what to check before laying a new floor.
How a 20 mm wood fibre underlay board is laid under a new floor, what it does for warmth and footstep noise, and what to watch with the subfloor.
How OSB boards are laid on floors: preparing the base, choosing thickness and grade, screwing, expansion gaps and checking the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.