Building work price list: Levelling Underfill Expanded Clay (Liapor) Lightweight Granules
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Preparation | ||||
| Expanded clay (Liapor) levelling fill | m² | €14.50 / m² | m² | enter quantity- |
| Removal of existing floating flooring | m² | €2.80 / m² | m² | enter quantity- |
| Skirting board removal | m | €1.20 / m | m | enter quantity- |
| Removal of glued linoleum flooring | m² | €4.50 / m² | m² | enter quantity- |
| Grinding concrete subfloor | m² | €9.50 / m² | m² | enter quantity- |
| Subfloor sanding before levelling (adhesive/tar removal) | m² | €4.50 / m² | m² | enter quantity- |
| Subfloor priming + corner caulking | m² | €3.50 / m² | m² | enter quantity- |
| Subfloor priming | m² | €1.90 / m² | m² | enter quantity- |
| Self-levelling compound | m² | €6.90 / m² | m² | enter quantity- |
| Perimeter expansion tape | lm | €2.50 / lm | lm | enter quantity- |
| Install OSB boarding to floor | m² | m² | - | |
| Wood fibre underlay board 20 mm (thermal and impact sound insulation) | m² | m² | - | |
| Torch-on bitumen felt (1 layer) | m² | m² | - | |
| Force-fit joint stitching with resin and wave connectors | pc | €18.00 / pc | pc | enter quantity- |
Expanded clay (Liapor) under a floor: when it makes sense
This underfill is used in refurbishments where the existing floor is uneven, the structure cannot carry a heavy sand and cement screed, and there is no time to wait weeks for a wet layer to dry. Typical cases are older houses with timber joisted floors, loft conversions and flats where a dry floor system is being installed. Liapor is a well-known brand name. The generic material is lightweight expanded clay aggregate. Within flooring work, it sits between subfloor preparation and the final floor finish.
Expanded clay is made by firing clay at a high temperature. The clay bloats and forms a porous granule that is light yet strong enough to support a floor. According to manufacturers' data, it weighs several times less than concrete of the same volume. On an old floor structure, that difference matters.
An underfill is worth considering mainly in these situations:
- the subfloor is uneven and the differences are greater than a levelling compound can handle,
- the floor structure is timber or otherwise weak and cannot take a heavy layer,
- a dry floor is being built without wet trades,
- services need to be hidden in the floor, for example cables or pipes,
- better thermal and acoustic insulation of the floor is wanted.
Why not simply use a screed? A sand and cement screed is heavy and brings a lot of water into the building. At usual thicknesses it takes weeks to dry, and no floor finish can be laid until it does. A dry underfill, once levelled and covered with boards, lets work continue straight away. A screed is the better choice where heavy point loads are expected, in industrial spaces, or where the floor is meant to store heat.
The underfill on its own is not a finished floor. It is a levelling layer that needs covering boards on top. Only then is laminate, vinyl, wood flooring, carpet or tiling laid, depending on what the system allows.
What to decide before ordering the underfill
Most problems with underfill come from decisions made too late or not at all. Before ordering, it helps to be clear about the following:
- Finished floor level: add up the thickness of the underfill, the covering boards and the floor finish. The result has to match thresholds, doors and adjoining rooms. If the floor rises, doors will need trimming or door linings may need replacing.
- Dry floor system: choose the boards before the underfill. The system manufacturer specifies the grading, the minimum and maximum thickness of loose fill and how the boards are laid.
- Loose or bound underfill: for thicker layers, manufacturers often require a bound underfill or an additional layer of boards. This needs to be known in advance because it changes both the method and the timing.
- Floor finish: tiles are heavier and more sensitive to deflection than laminate. The finish affects the choice of boards and whether the floor structure needs assessing.
- Services: decide which cables and pipes will run in the floor and have them installed before the fill goes down. Afterwards they cannot be reached without taking the floor apart.
- Load-bearing capacity: with timber floors in older houses, it is sensible to have a structural engineer assess the capacity, especially if a thicker layer or a heavy finish such as tiling is planned. If the joists or other structural parts of the floor are to be altered, check with your local building control beforehand what approval is needed. In Scotland, structural alterations need a building warrant from the council before work starts. In a flat, inform the freeholder or managing agent about the work.
Expanded clay gradings and maximum underfill thickness
Expanded clay is sold in several granule sizes, known as gradings. For floors, the most common are:
- fine grading, roughly 0-4 mm or 1-4 mm: the usual choice directly under dry floors. Systems with gypsum fibreboard and similar boards normally specify it, because the fine granules screed off to a flat surface and do not shift under the board,
- medium grading, roughly 4-8 mm: more for thicker layers as a bottom fill, topped off with fine granules,
- coarse grading, roughly 8-16 mm: for large level differences, practically always as a bottom layer or in bound form.
The main rule is to follow the data from the manufacturer of the dry floor system laid on top. System manufacturers usually state which grading to use, what minimum thickness to keep and up to what thickness the fill may be laid loose. As a guide, the minimum thickness of loose fill is around 1 cm and the maximum is a few centimetres, often around 6 cm. For thicker layers, manufacturers specify a bound underfill or an extra layer of boards so the granules do not move under load. The exact values differ between systems, so the technical data sheet always takes precedence.
The underfill is covered with gypsum fibreboard, cement particle board or proprietary dry floor elements. OSB is also used, but for a floating floor the thickness and jointing must follow the manufacturer's instructions, otherwise the board will flex on the loose base.
Liapor underfill: step-by-step method
- Survey and measuring: the tradesperson measures level differences in the room, finds the highest and lowest points, checks the subfloor and agrees the finished floor level with you, including boards and finish.
- Removing old layers: if part of the job, the old floor covering, wood flooring, dust and loose material are removed. Old adhesive residues or bitumen are dealt with by grinding the subfloor and removing adhesive and bitumen. The subfloor is then vacuumed. In homes built before 2000, have suspect materials such as old floor tiles and adhesives tested for asbestos before they are lifted or ground. Asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
- Checking the subfloor: the moisture of the concrete and the condition of the timber joists and floor boarding are checked. Rotten or damaged parts must be repaired before they are covered. On concrete, high spots and ridges can be removed by grinding and levelling the concrete subfloor.
- Separating layer: on concrete, a polythene sheet is laid with laps and edges turned up the walls. On a timber floor, a vapour-permeable protective layer is used to stop the fill trickling through, as specified by the system manufacturer.
- Edge strip: a perimeter expansion strip is fixed around the walls and around pipe penetrations to separate the floor from the walls.
- Screed rails: these are set level using a spirit level or laser. They define the top of the underfill.
- Filling and screeding off: the expanded clay is poured between the rails and drawn level with a long aluminium straightedge. For large differences, the coarser grading goes in first with the finer one on top.
- Compacting and topping up: the layer is lightly compacted, for example with a board or as the manufacturer describes, and screeded off again.
- Removing the rails: the rails are lifted out and the gaps carefully filled and levelled.
- Checking flatness: the straightedge is run over the whole area and low spots are topped up.
- Laying the covering boards: once the fill is down, people walk only on load-spreading boards, and the covering boards are laid progressively from one corner. Board laying is often a separate item, so check whether it is included in the quote.
Loose underfill in an ordinary room with a straightforward subfloor can usually be done by an experienced tradesperson in one day including preparation, often with the covering boards as well. The finish can go down straight away because the layer contains no water. A bound underfill needs time to cure before it can be walked on and boarded. The manufacturer sets this time, and it is usually at least until the following day, longer for thicker layers.
What affects the price of underfill
The indicative labour price in the price list is €14.50 per m². The final figure may differ depending on the specific room:
- Layer thickness: the biggest factor. Material use rises in direct proportion to thickness, so double the thickness means roughly double the expanded clay and more carrying. For large differences, several layers of different gradings are often needed, which adds work.
- Condition of the subfloor: rotten floor boarding, old wood flooring to remove or joists to repair all lengthen the job and are usually charged separately.
- Loose or bound underfill: bound underfill takes more effort, needs mixing and curing time, and so comes out noticeably more expensive than loose fill.
- Services in the floor: the more cables and pipes there are to work around and carefully cover, the slower the progress.
- Room layout: alcoves, thresholds, transitions to stairs and many penetrations mean more hand levelling than a large rectangular area.
- Access: carrying bags to upper floors without a lift takes longer and may be charged as a supplement for moving materials.
- Small areas: for a single small room, the price per m² often rises because preparation, measuring and travel take the same time as for a larger area.
When comparing quotes, check whether the price includes materials, the separating layer, the edge strip and laying of the covering boards, or only the filling and levelling itself.
How to prepare the site so the work goes quickly
Besides the condition of the room, the way the site is prepared also matters. The work goes faster with:
- a cleared room with no furniture and no materials from other trades,
- services in the floor completed and tested, so the fill does not have to be dug out again,
- the finished floor level agreed and the board system chosen before the tradesperson arrives,
- space to store the bags close to the room, ideally somewhere dry,
- clear access from the van to the house and somewhere to park while unloading,
- an agreement with other trades that nobody walks on the finished underfill until the boards are down.
The work takes longer if the floor level changes during filling, services are added late, or another trade is working in the same room. Draughts and open windows while pouring fine grading make a mess and make the job harder.
Typical mistakes and how they show up later
A few mistakes come up repeatedly in practice and only show once the finish is laid:
- insufficient levelling and compaction: the fill settles later and the floor flexes or creaks,
- missing edge strip: the board touches the wall, transmits footfall noise and has no room to expand,
- wrong separating layer: no moisture protection on concrete, or an unsuitable impermeable sheet on a timber floor,
- wrong grading for the thickness: coarse granules in a thin layer are not stable and shift under the board,
- underestimated floor height: the thickness of boards and finish is forgotten, so doors will not close or a step forms into the hallway,
- walking directly on the fill: this leaves hollows that cannot be repaired once the boards are on,
- loose fill thicker than permitted: the granules move under load, the floor becomes wavy over time and tile joints may crack,
- board resting directly on a pipe or cable: this creates a hard spot, the board bends around it and the service can be damaged.
Most of these mistakes cannot be put right without lifting the boards and relevelling the fill. That is why checks are done before covering, not after the finish is laid.
How to check the finished underfill
Before the underfill is covered with boards, it is worth going through this list:
- the fill is flat, with no gaps under a 2 m straightedge larger than the board manufacturer allows,
- there is a continuous edge strip around the walls,
- the separating layer is intact and the edges are turned up the walls,
- services are covered and no board will rest directly on them,
- there are no footprints in the fill or hollows left by the screed rails,
- the level matches the plan, including boards and finish.
Immediately after laying the covering boards, also check that:
- the floor does not flex, even when walking next to walls and in corners,
- the boards do not touch the walls and the edge strip stands above their surface,
- transitions at doors and into adjoining rooms work without unexpected steps.
DIY guide: dry underfill under floor boards
With a sound floor structure and work in a single room, a homeowner can lay the underfill. The method is the same as in the steps above. The main difference is the patience needed to get it flat. For larger unevenness, prepare screed rails, a long aluminium straightedge and a spirit level or laser. Loose fill in a thickness the board manufacturer allows without binding is the most suitable option for DIY.
A few extra practical tips:
- start filling in the furthest corner and work towards the door, so there is no need to cross the finished area,
- have several load-spreading boards ready for kneeling and walking, and move them ahead as you go,
- fill the rail gaps in small amounts once the rails are out and level them straight away with the straightedge,
- cover services so there is enough material above them and no board rests directly on them,
- wear a dust mask or respirator when pouring fine grading, as it creates dust.
Leave electrical connections to a qualified electrician and pressure testing of water pipes to a plumber. A new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P. Use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. Any work on joists or other structural parts of the floor is not a DIY job and should be carried out by a professional after assessment by a structural engineer. New or altered floor joists should be designed to Eurocode 5 (BS EN 1995-1-1) with the UK National Annex.
Frequently asked questions
The price list gives roughly €14.50 per m². The final price depends mainly on layer thickness, the condition of the subfloor, whether the fill is loose or bound, the amount of services and access to the site.
Each m² of floor area needs roughly 10 litres of material per centimetre of thickness. On an uneven subfloor, calculate with the average thickness and add a margin for compaction and topping up. Exact compaction data is given by the manufacturer.
Yes. Expanded clay does not rot and is not affected by mould. The build-up matters, though: covering boards suitable for wet areas, tanking above the boards and well-sealed penetrations and corners as specified by the system manufacturer.
It can, but the build-up should be designed by a specialist. There are dry underfloor heating systems on boards that are laid over loose fill. Wet underfloor heating should be installed and pressure-tested to BS EN 1264-4 before the screed is laid. If the floor is meant to store heat, a calcium sulphate (anhydrite) screed can be laid over the lightweight layer, for example. It is not poured onto loose expanded clay, however, but onto a bound underfill or a solid base. On a timber floor, a liquid screed adds considerable weight, so it is not suitable without assessment by a structural engineer.
It depends on the unevenness and on the system laid on top. Dry floor manufacturers state both a minimum and a maximum thickness for loose fill, roughly from about 1 cm up to a few centimetres, and these values should be followed. For large differences, the layer is built up in stages or bound.
Yes, but only lightly. The aim is for the granules to settle together so the layer does not move later. Heavy compaction is not needed and does not improve the insulating properties of the fill.
The most common cause is uneven or poorly compacted fill that lets the board flex, or a missing edge strip. Sometimes the boards are badly jointed. The repair usually means lifting the boards and relevelling the fill.
Related work
When to grind a concrete subfloor before new flooring, how the job is done, what makes it harder and how to check the surface is ready.
How a subfloor is ground clean of old adhesive and bitumen before levelling, what makes it harder, common mistakes and how to check the result.
How to fit a perimeter expansion strip before pouring levelling compound or screed, which strip to choose and how to check the finished work.
How to prime a floor before levelling, which primer suits which subfloor, when to seal corners and gaps, and how to check the floor is ready.
When self-levelling compound makes sense, how to prepare the subfloor, how to pour it properly and what to check before laying a new floor.
How a 20 mm wood fibre underlay board is laid under a new floor, what it does for warmth and footstep noise, and what to watch with the subfloor.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.