Perimeter Expansion Strip for Levelling

A perimeter expansion strip is a flexible foam strip fixed to the walls before levelling compound or screed is poured, so the floor does not crack. Guide price: €2.50 per running metre, depending mainly on room shape and pipe penetrations.

Updated 09/2026·10 min read·14 price list items
Standard labour price
€2.50/ lm
Indicative range
€2.00 - €3.25
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Perimeter Expansion Strip for Levelling

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Flooring14 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Preparation

Perimeter expansion tapelm€2.50 / lmlmenter quantity-
Removal of existing floating flooringm²€2.80 / m²m²enter quantity-
Skirting board removalm€1.20 / mmenter quantity-
Removal of glued linoleum flooringm²€4.50 / m²m²enter quantity-
Grinding concrete subfloorm²€9.50 / m²m²enter quantity-
Subfloor sanding before levelling (adhesive/tar removal)m²€4.50 / m²m²enter quantity-
Subfloor priming + corner caulkingm²€3.50 / m²m²enter quantity-
Subfloor primingm²€1.90 / m²m²enter quantity-
Self-levelling compoundm²€6.90 / m²m²enter quantity-
Expanded clay (Liapor) levelling fillm²€14.50 / m²m²enter quantity-
Install OSB boarding to floorm²m²-
Wood fibre underlay board 20 mm (thermal and impact sound insulation)m²m²-
Torch-on bitumen felt (1 layer)m²m²-
Force-fit joint stitching with resin and wave connectorspc€18.00 / pcpcenter quantity-
Total labour
- enter quantity
Create quote from price list →

What a perimeter expansion strip is and when it is needed

The strip separates the new floor layer from walls, columns and pipes. This lets the floor move slightly with changes in temperature and moisture without cracking. Once the compound has cured, the strip stays in the gap at the wall and is later hidden by the skirting board.

It is needed for every levelling job, from a small bathroom to a large living room. It matters even more with underfloor heating. The strip is a small item within flooring work. If it is missing or badly fixed, the fault shows across the whole floor and the repair is expensive.

Why a floor needs a gap at the wall

Every material in a floor moves. It expands slightly when warm and contracts when cool. A poured compound also shrinks a little as it dries. If levelling compound is poured hard up against the wall, this movement has nowhere to go. The stress is released where the layer is weakest and a crack forms, often in corners or at doorways.

The strip creates a compressible layer around the perimeter. When the floor expands, the strip compresses. When the floor contracts, the strip recovers. In addition, it:

  • stops impact noise from travelling from the floor straight into the walls,
  • protects the bottom of the walls from compound running onto them and soiling them,
  • gives a clean, straight edge for the final floor finish to meet.

A perimeter strip is not enough everywhere

The strip only deals with the junction between the floor and the walls and penetrations. In doorways between rooms the floor narrows, and that is usually its weakest point, so a separate movement joint is often formed there, for example by inserting a strip or cutting through the layer. Large areas, long narrow rooms and heated floors are divided into smaller bays according to the instructions of the compound manufacturer, the heating system supplier or the design. If the floor needs this, agree it with the tradesperson in advance, as it is separate work beyond the perimeter strip.

What to decide before ordering

The strip is chosen according to what is being poured and what will be under the floor. Before work starts, it should be clear:

  • how thick the levelling compound or screed will be, as this determines the height of the strip,
  • whether there will be underfloor heating, in which case a thicker strip is used,
  • whether the pour goes onto insulation or uses a very fluid compound, where a strip with a polythene skirt is worth using,
  • what the final floor finish will be, because under tiles the strip is trimmed later, not straight after curing,
  • which penetrations pass through the floor: heating pipes, waste pipes, columns, chimney breasts, door frames. Each one needs wrapping,
  • who supplies and fits the strip: whether it is part of the levelling quote or a separate item.

Choosing the thickness and height of the strip

The most common type is polyethylene foam strip. It is light, flexible, does not absorb water and bends easily into corners.

Strip height

The strip must always be taller than the planned layer of levelling compound or screed. It is commonly sold in heights from about 50 to 150 mm. A thin levelling layer needs a lower strip, while a thick screed, especially on insulation and with underfloor heating, needs a taller strip that covers the full floor build-up. If the strip is too low, the compound flows over it onto the wall and the movement joint does not work. The excess is trimmed off later.

Strip thickness

For a thin levelling layer in a flat, a strip about 5 mm thick is usually sufficient. With a thicker screed and with underfloor heating the floor moves more, so a thicker strip is used, typically 8 to 10 mm. With underfloor heating, follow the heating system manufacturer's instructions, as they usually specify the thickness of the perimeter joint.

Self-adhesive strip and strip with a polythene skirt

A self-adhesive backing holds the strip on the wall during the pour, so it does not slide or come away. A strip with a polythene skirt has a band of film at the bottom that is laid on the base facing into the room. The poured compound weighs the film down and seals the joint between the strip and the floor. With very fluid self-levelling compounds and when pouring onto insulation, this is the more practical choice, because the compound cannot run under the strip.

How the installation works step by step

  1. Measuring: the tradesperson measures the room perimeter, including recesses, piers and the area around the door. The levelling thickness is also checked so the right strip height is chosen.
  2. Cleaning the walls: dust, grease and loose plaster or paint are removed from the bottom of the walls. Self-adhesive strip will not stick to a dusty surface.
  3. Priming the base: by this stage the base has usually already been primed, or priming before levelling is done straight after the strip is fixed, according to the compound manufacturer's method. The primer must dry fully before the strip is fixed and before the pour.
  4. Fixing the strip: the strip is fixed in one continuous line along all walls, tight to the floor.
  5. Corners and joins: in corners the strip is not cut, only folded. Joins are butted tightly or overlapped slightly so that no gap is left anywhere.
  6. Penetrations: the strip is wrapped around everything that passes through the floor. These points are a common source of cracks.
  7. Polythene skirt: if the strip has one, it is laid flat on the base facing into the room.
  8. Checking during the pour: the strip is watched to make sure it stays in place and the film lies flat.
  9. Trimming: the excess is cut off flush with the floor using a sharp knife. Under vinyl, laminate or wood flooring this is done once the compound has cured. Under tiles the strip is trimmed only after the tiles are laid, so that neither the tile adhesive nor the tiles bridge the gap at the wall.

The rest of the strip stays in the gap permanently and is later covered by the skirting board. This part acts as the movement joint for the whole life of the floor, so it is not pulled out.

What affects the price

The strip is priced per running metre, by the length of the perimeter, not by floor area. The guide labour price is €2.50 per running metre. The final cost depends mainly on:

  • perimeter length: the sum of all wall lengths, including recesses and piers. A room with walls of 3 m and 4 m has a perimeter of 14 running metres, plus an allowance for joins and wrapping penetrations,
  • an irregular layout: many corners, recesses and piers slow the work, so each metre costs more than in a simple rectangular room,
  • the number of pipes and penetrations: the strip has to be wrapped neatly around each pipe. A small bathroom with many services therefore costs more per metre than an empty living room,
  • wall condition: uneven, crumbly or dusty walls must be cleaned or consolidated first, otherwise the strip will not stick,
  • strip type: a taller, thicker strip with a skirt for thick screed or underfloor heating costs more in materials and takes longer to fit,
  • access: areas behind radiators or under fitted furniture are slow and awkward to reach.

When comparing quotes, check whether the strip is included in the levelling price or charged separately, and whether the quote covers the strip material as well as labour. Movement joints in doorways and dividing large areas into bays are usually separate items.

How to prepare so the work runs without delays

The strip is fixed immediately before the pour, so any delay here holds up the whole levelling job. It helps when:

  • the room is cleared and the bottom of the walls is accessible along the whole perimeter,
  • services in the floor are finished and tested, so nothing needs moving once the strip is fixed,
  • door frames are fitted, or at least their positions are known,
  • the old floor covering and skirting boards have been removed and the waste taken away, including grinding off old adhesive and bitumen where needed,
  • any grinding and levelling of the concrete subfloor has been completed,
  • the air in the room is dry and the temperature suits the levelling compound, so the primer and the strip adhesive dry properly.

The job takes longer if it turns out on site that the levelling thickness is unclear and the strip brought along is too low. Problems also arise when a wall is still damp from fresh painting or plastering and the self-adhesive backing will not hold.

Typical mistakes and how they show later

Gaps in the strip. A short stretch of wall without strip, for example behind the door, is enough for the compound to bond to the wall. A crack often forms at that point.

Forgotten penetrations. A heating pipe set solid in the compound transmits movement and sound, and the floor around it cracks.

Strip too low. The compound flows over the top and bonds to the wall. The movement joint does not work at that point.

Strip coming away. On a dusty or damp wall, self-adhesive strip peels off during the pour and the compound runs behind it.

Corners cut instead of folded. A gap forms in the corner, compound runs through to the wall, and the corner becomes the most likely place for a crack.

Strip trimmed too early under tiles. The tile adhesive or the tiles themselves bond to the wall and bridge the gap. Tiles at the wall may then crack or debond.

No movement joint in the doorway or across a large area. The floor cracks across the threshold or in the middle of a large room, even though the perimeter strip is fine.

Substitutes made of cardboard or polystyrene offcuts. Cardboard soaks up water and goes soft. Polystyrene has little spring and does not recover once compressed, so the joint stops working after the first floor movement.

Pulling out the remaining strip after curing. An empty gap is left, which fills with dirt over time and loses its flexibility.

How to check the finished work

The strip is worth checking twice: before the pour, while everything can still be corrected, and after the compound has cured.

  • before the pour, go round the whole perimeter, including behind the door, the corners and every penetration, and look for gaps,
  • press the strip by hand in several places, it must not stand away from the wall,
  • compare the strip height with the planned level of the compound, the strip must be taller,
  • the film, if the strip has one, lies flat on the base and is not folded back,
  • after the pour, check that the compound is not bonded directly to the wall anywhere,
  • with tiles, check that the strip still stands proud before tiling and is trimmed only afterwards,
  • after trimming, the edge is straight and flush with the floor and there is still foam in the gap,
  • there are no visible cracks or lifted areas at the walls or in doorways.

Tips for DIYers

If the levelling is being done on a DIY basis, the strip can be fitted without professional help. The method is the same as in the steps above. All that is needed is a tape measure, a sharp knife and a little patience in the corners. Points to watch:

  • buy strip with a margin, as some is used for wrapping penetrations and overlapping joins as well as the perimeter,
  • choose a taller strip if in doubt, excess can be cut off but a missing piece cannot be added,
  • fix only to a dry, absorbent wall and press the strip along its full length, not just at the ends,
  • go round the perimeter again just before the pour and press back any areas that have lifted,
  • under tiles, leave the strip standing proud until the tiles are laid.

With underfloor heating, follow the heating system manufacturer's instructions. If heating or water pipes in the floor need moving, that is no longer a DIY job.

Frequently asked questions

A guide price is €2.50 per running metre. Expect to pay more for an irregular room with many corners and penetrations, poor wall condition and a thicker strip with a skirt. Check whether the quote includes the strip material.