Price list 2026 · Europe

Wood fibre underlay board 20 mm (thermal and impact sound insulation)

A 20 mm rigid underlay board for thermal and impact sound insulation goes under a floating screed and reduces footstep noise. Laying costs roughly €23.00 per m², depending mainly on the subfloor and the room layout.

Updated 09/2026·13 min read·14 price list items
Standard labour price
€23.00/ m²
Indicative range
€18.40 - €29.90
60 m² flat
€3450.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Wood fibre underlay board 20 mm (thermal and impact sound insulation)

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Flooring14 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Preparation

Wood fibre underlay board 20 mm (thermal and impact sound insulation)m²€23.00 / m²m²enter quantity-
Removal of existing floating flooringm²€2.80 / m²m²enter quantity-
Skirting board removalm€1.20 / mmenter quantity-
Removal of glued linoleum flooringm²€4.50 / m²m²enter quantity-
Grinding concrete subfloorm²€9.50 / m²m²enter quantity-
Subfloor sanding before levelling (adhesive/tar removal)m²€4.50 / m²m²enter quantity-
Subfloor priming + corner caulkingm²€3.50 / m²m²enter quantity-
Subfloor primingm²€1.90 / m²m²enter quantity-
Self-levelling compoundm²€6.90 / m²m²enter quantity-
Perimeter expansion tapelm€2.50 / lmlmenter quantity-
Expanded clay (Liapor) levelling fillm²€14.50 / m²m²enter quantity-
Install OSB boarding to floorm²m²-
Torch-on bitumen felt (1 layer)m²m²-
Force-fit joint stitching with resin and wave connectorspc€18.00 / pcpcenter quantity-
Total labour
- enter quantity
Create quote from price list →

What the board is and what it does

This underlay board is a rigid slab made of mineral fibres, specifically stone wool. It is stiff enough to carry a screed and normal floor loads, yet resilient enough to absorb impacts from walking. That is why it is called impact sound insulation. Several insulation manufacturers make comparable stone wool slabs for floating floors.

The board is not an underlay for laminate or vinyl. It is part of a floating floor build-up, one of the core jobs in flooring work. The board is laid on the structural slab or base concrete, a separating membrane goes on top, and the screed is poured onto the membrane. The screed touches neither the walls nor the slab. It "floats" on the insulation. The finished floor covering, such as tiles, parquet, laminate or vinyl, is laid only once the screed has dried.

Why does this build-up reduce noise? A heavy screed on a resilient layer works like a damper. Impacts from footsteps and dropped objects reach the slab and the flat below only in a weakened form. This works only if the screed has no rigid contact with walls, the slab or pipes anywhere. Such a point is called a sound bridge, and it reduces the whole effect.

The thermal benefit of a 20 mm layer is secondary. The floor feels less cold to the touch, but it does not replace proper floor insulation above an unheated cellar or on a ground-bearing slab. Thicker thermal insulation in the floor build-up is needed for that.

The board is typically used when refurbishing a flat in a block with concrete floors, where the old screed is broken out and a new floor is built, in new builds, and when renewing floors in houses where the floor is rebuilt from the structural slab up.

What to decide before laying starts

The board is only one layer of the build-up. Whether the floor performs well also depends on the screed and the floor covering. The full build-up should therefore be known before the boards are ordered.

Which screed goes on the board and how long it takes to dry

A sand-cement screed or an anhydrite (calcium sulphate) screed is laid on the board. On insulation it must be thicker than on a rigid base so that it does not crack under load. A cement screed on an insulation layer is usually about 50 mm or more, an anhydrite screed usually 35 to 50 mm. With underfloor heating the thickness increases by the pipes. The exact thickness is set by the design or the screed data sheet.

The screed must dry before the floor covering is laid, and this needs to be allowed for in the programme. For cement screed, a rough guide is about a week per centimetre of thickness. Thicker layers and cold or poorly ventilated rooms take longer. Anhydrite screed usually dries faster with good ventilation. Do not rely on the calendar, though. Before the covering is laid, the floor layer measures the residual moisture of the screed, most often by the CM method, and compares it with the value the covering manufacturer permits.

How much the floor level rises

The build-up grows by the 20 mm board, the screed thickness and the thickness of the covering with adhesive. When replacing an old floor, measure in advance how much space is available from the structural slab to the level you need, what step will form towards the hallway or bathroom, and whether doors and door linings will need adjusting.

What load the board takes and how much it compresses

Every impact sound board compresses slightly under load. With mineral wool boards this is a few millimetres, shown in the data sheet as compressibility. The lower the compressibility, the stiffer the board, but the less it dampens footsteps. A board intended for residential use is used in ordinary flats and houses. If the floor has to carry something exceptionally heavy, ask the manufacturer in advance.

When to choose this board and when other insulation

The board suits situations where a new screed is laid and the main aim is reducing footstep noise, for example between flats. Other materials serve other purposes:

  • Expanded polystyrene (EPS): insulates well against heat loss and is also used under cement or anhydrite screeds. Standard polystyrene, however, dampens footsteps less well than a mineral impact sound board. On ground floors, thicker polystyrene for heat is often combined with a thinner impact sound layer.
  • Soft mineral wool: absorbs sound very well but cannot be walked on. It belongs between battens and joists, not under screed.
  • Wood fibre underlays and boards: are designed for dry laying directly under a floating floor covering, without screed. They are chosen where wet trades are to be avoided.
  • Cork and thin underlays: are thin and go under laminate or vinyl where height must be saved. They usually do not improve acoustics or thermal performance significantly.
  • Acoustic underlay under the covering: a thin acoustic underlay is sometimes added under laminate or vinyl on a finished screed. It mainly reduces footstep noise within the room itself. Noise to the flat below is reduced chiefly by the floating screed on the insulation board, and the underlay adds only a little.

Underfloor heating

With underfloor heating, the impact sound board goes under the heated screed, never above it. Insulation above the pipes would hold back heat meant for the room. Under the pipes, the board is often combined with a system panel or thermal insulation that directs heat upwards. The build-up is set by the heating design. Wet underfloor heating should be installed and pressure-tested to BS EN 1264-4 before the screed is laid.

Work in a block of flats

Laying the boards is quiet, but breaking out the old screed and preparing the subfloor are noisy. Plan this work according to the building rules and your lease. If the floor replacement involves larger alterations, contact the managing agent or freeholder. A new screed is heavy, so in older buildings, especially with timber joist floors, a structural engineer should assess the load-bearing capacity. Changing the structural floor itself is a building alteration that must be assessed by a professional. Check with building control what approval it requires.

How laying the board works step by step

  1. Preparing the subfloor: the old floor, and the old screed if needed, is removed, and the subfloor is cleaned of mortar, adhesive residues and grit and then vacuumed. Stubborn residues are dealt with by grinding off old adhesive and bitumen.
  2. Checking flatness: the subfloor is checked with a long straightedge. The board must bear on its full area and must not rock on high spots. Larger irregularities are corrected, for example by grinding and levelling the concrete subfloor.
  3. Services in the floor: if pipes or conduits run across the floor, they are first brought to one level. The space between them is filled with a levelling layer, such as bonded fill or lightweight concrete, or levelling insulation of the same height is fitted between the pipes. The board is laid only on this flat surface above the services, and the screed must never sit directly on pipes.
  4. Protection against moisture from below: on ground floors, a damp-proof membrane or vapour control layer is provided under the insulation layers as per the design.
  5. Perimeter strip: a foam perimeter expansion strip is fixed around the room, around columns and door linings. It runs from the subfloor to above the future finished floor level.
  6. Laying the boards: the boards are laid tightly butted, without gaps, with joints staggered against the adjacent row. If two layers are laid, the joints of the second layer are offset from the first.
  7. Cutting to fit: edge pieces are cut with a long knife or fine saw so they fit tightly against the perimeter strip. Gaps are not filled with mortar or foam.
  8. Separating membrane: polythene sheeting is laid over the boards with overlaps, usually about 10 cm, the joints are taped and the membrane is turned up onto the perimeter strip. It stops water and cement slurry from the screed running into the board joints, where they would harden, create a rigid connection to the slab and reduce sound insulation.
  9. Screed: the screed is laid at the specified thickness and left to dry.
  10. Floor covering and trimming the strip: the covering is laid on the dried screed. The protruding perimeter strip and membrane are trimmed only after that, just above the level of the covering, and then the skirting is fitted. The skirting is fixed to the wall, not to the floor.

Cost of laying the board: what it depends on

The guide labour price in the price list is €23.00 per m². Check against the price list item or the tradesperson's quote whether it includes materials, meaning the boards, perimeter strip and membrane. Laying boards on a prepared subfloor is quick work. The final cost of the floor is therefore driven mostly by everything that has to happen before and after.

  • Condition of the subfloor: a flat, clean slab means quick laying. High spots, mortar residues or hollows must be removed and levelled, which is charged separately and on a poor subfloor can cost more than laying the boards.
  • Breaking out the old screed: in refurbishments this is usually the most expensive preparation item, together with removing the rubble. Carrying it out without a lift makes the work noticeably dearer.
  • Services in the floor: pipes and conduits between which the subfloor has to be levelled add labour and materials.
  • Room layout: many corners, recesses, doorways and risers mean many precise cuts and more perimeter strip. A small hallway with several doors works out much more expensive per m² than a large rectangular living room.
  • Floor area: on small areas, travel, setting up and cutting make up a large share of the price, so the rate per m² tends to be higher.
  • Number of layers: if the build-up specifies two layers of boards or a combination with thermal insulation, the work increases by roughly one more layer.
  • Related work: the screed, its levelling and the floor covering are separate items not included in the board price.

What makes the job easier and what slows it down

  • Cleared rooms: boards and screed are done over the whole area at once. If furniture has to be moved around, the work is split into stages and takes longer.
  • Finished services: electrics, water and heating in the floor should be completed and checked before the insulation is laid. Cutting into a finished build-up later damages it. Electrical work must be done only by an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT), as a new circuit or work in a bathroom is notifiable under Part P. Gas work must be done only by a Gas Safe registered engineer.
  • A clear floor build-up: if the screed thickness and covering are known in advance, the tradesperson knows how high the perimeter strip must reach and what the final level will be.
  • Dry storage: the boards must stay dry. Packs left outside in the rain or in a damp cellar cannot be used.
  • Follow-on screeding: laid boards with membrane should not wait long. Ideally the screed follows shortly after laying, before there is much foot traffic and materials being carried across.
  • Access and waste: packs are bulky and demolition rubble is heavy. Agree lift use, a skip location and permitted hours for noisy work with the managing agent in advance.

Typical mistakes and how they show up later

A fault in the insulation often only becomes apparent after the screed is poured or the covering is laid, when it can no longer be fixed without breaking out.

  • Missing or too low perimeter strip: the screed bears against the wall and footsteps transfer into the masonry and to the neighbours. When a floor is replaced because of noise, this is the most common cause of disappointment.
  • Holes and leaks in the membrane: screed runs between the boards, hardens in the joints and forms rigid bridges to the slab. The insulation then dampens far less.
  • Gaps between boards filled with mortar or foam: the same effect as leaked screed, footstep noise passes through these points.
  • Board on high spots or on pipes: the screed lacks even support, cracks at weaker points, and the covering above the crack cracks too.
  • Screed too thin on insulation: it breaks under furniture and at doorways, tiles come loose and crack at the joints.
  • Wet boards: wet mineral wool loses its resilience and takes a very long time to dry under the screed, which can damage the covering.
  • Covering on damp screed: parquet and laminate cup, and adhesive under tiles or vinyl fails. The cause is usually laying by the calendar without measuring moisture.
  • Perimeter strip trimmed too early: if the strip is cut before the covering is laid, the covering may touch the wall and sound transfers again. A skirting screwed into both the floor and the wall does equal harm.
  • Forgotten floor height: doors then do not fit and thresholds between rooms create a step.

How to check the insulation and the finished screed

The most important check is before the screed is poured, because afterwards neither the boards nor the membrane can be seen. At handover, go through these points:

  • the boards do not move or rock underfoot, and there is no grit, mortar or service debris under or between them,
  • the perimeter strip really is everywhere, including behind risers, around door linings and in hard-to-see corners,
  • the membrane has no tears from foot traffic and carrying materials,
  • no pipe or conduit protrudes above the boards,
  • after the screed is poured, it touches no wall or door lining anywhere and the perimeter strip is still visible all round,
  • the screed thickness matches what was agreed, which can be checked by measuring at the edge or against level marks. Its flatness should meet the class specified in the contract: under BS 8204, SR1 allows a gap of no more than 3 mm under a 2 m straightedge, SR2 5 mm and SR3 10 mm,
  • a residual moisture test result for the screed is available before the covering is laid.

DIY guide: what you can do yourself

A capable DIYer can lay the boards and membrane. The method is the same as in the steps above. Pouring the screed, however, demands time and precision and is usually done by a contractor with a screed pump. If you are unsure about the flatness of the subfloor or the services in the floor, have a professional assess them first. For your own work, it helps to:

  • have an insulation knife or a fine-toothed saw, a long straightedge, a tape measure, a marker, membrane tape and a vacuum cleaner ready,
  • work in gloves and long sleeves and wear a dust mask and goggles when cutting, as mineral fibres irritate the skin, eyes and airways,
  • cut on a firm board away from the area being laid and clear offcuts straight away,
  • trace shapes around risers and door linings onto paper first and transfer them to the board using the template,
  • avoid unnecessary walking on the laid area and put down pieces of plywood or OSB for carrying heavy items, so the insulation and membrane are not damaged.

Frequently asked questions

The guide labour price in the price list is €23.00 per m². Expect to pay more for an uneven subfloor, services in the floor, rooms with complex layouts needing many cuts, and small areas. Breaking out old screed, the new screed and the floor covering are charged separately.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.