Building work price list: OSB Flooring Installation and Fixing
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Preparation | ||||
| Install OSB boarding to floor | m² | €19.50 / m² | m² | enter quantity- |
| Removal of existing floating flooring | m² | €2.80 / m² | m² | enter quantity- |
| Skirting board removal | m | €1.20 / m | m | enter quantity- |
| Removal of glued linoleum flooring | m² | €4.50 / m² | m² | enter quantity- |
| Grinding concrete subfloor | m² | €9.50 / m² | m² | enter quantity- |
| Subfloor sanding before levelling (adhesive/tar removal) | m² | €4.50 / m² | m² | enter quantity- |
| Subfloor priming + corner caulking | m² | €3.50 / m² | m² | enter quantity- |
| Subfloor priming | m² | €1.90 / m² | m² | enter quantity- |
| Self-levelling compound | m² | €6.90 / m² | m² | enter quantity- |
| Perimeter expansion tape | lm | €2.50 / lm | lm | enter quantity- |
| Expanded clay (Liapor) levelling fill | m² | €14.50 / m² | m² | enter quantity- |
| Wood fibre underlay board 20 mm (thermal and impact sound insulation) | m² | m² | - | |
| Torch-on bitumen felt (1 layer) | m² | m² | - | |
| Force-fit joint stitching with resin and wave connectors | pc | €18.00 / pc | pc | enter quantity- |
What an OSB floor is and where it suits
OSB is made from compressed wood strands. On a floor it gives a flat, firm surface that can be walked on as soon as it is fixed. Laminate, vinyl, carpet or engineered wood can then be laid on top. The board is light and installed dry. It suits jobs where a wet screed would add unnecessary weight to the structure, or where waiting for concrete or self-levelling compound to dry would add several weeks. OSB decking is one of several options covered in flooring work.
Typical situations where OSB is a sensible choice:
- a loft or an older house with timber floor joists, where a new structural deck is needed,
- a renovation where old parquet or floorboards are taken up and the base underneath is uneven,
- a summer house, garage workshop or plant room where the floor needs to be finished quickly,
- a dry floor build-up with levelling fill and insulation in a flat or a timber-frame house.
What to decide before ordering the work
These decisions determine the board thickness, the floor build-up and the timescale:
- What floor covering goes on top. Thin vinyl needs a sanded board, tiles need an extra layer and carpet is fine on a standard surface. If the OSB is to stay as the finished floor, allow for sanding and a protective coating.
- What the board will sit on. On joists the board spans on its own and must be thicker. On a solid, continuous base it only acts as a levelling layer. On insulation it lies loose and is secured differently, not by screwing into the base.
- Finished floor height. Board, levelling fill, insulation and covering together raise the floor. Check that doors will still open, how the threshold to the next room will work and what happens to the height of any step.
- Noise and heat. In a block of flats, impact sound insulation matters because of the neighbours below. Above an unheated space, thermal insulation is the priority.
- Underfloor heating. If it is wanted, a dry system designed for timber floors is needed, and the decision has to be made before the boards go down.
- Services in the floor. Cables, water and heating pipes under the boards must be finished and tested before the floor is closed up. Electrical work must only be carried out by a qualified electrician. A new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start.
- What to do with the old floor. Old layers, such as parquet stuck down with bitumen or old vinyl tiles, are removed if they are loose, flex or would raise the floor too much. Removal is often followed by grinding the subfloor to remove adhesive and bitumen. A firm, flat old covering can sometimes be left in place and the OSB laid over it.
If asbestos is suspected in old floor tiles or adhesives, nothing should be broken up by a non-specialist. In homes built before 2000, have suspect materials tested before you drill or demolish; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
Preparing the base for each type of installation
The base decides whether the floor will still be flat and quiet in a few years. It must be clean, dry and sound. Significant dips and humps should be levelled before installation, because the board will not remove them, it will only follow them. A tighter tolerance, roughly 2 mm under a 2 m straightedge, then applies to the surface of the finished OSB under thin coverings such as vinyl.
Timber joists
The joists must be sound, free from rot and level with each other. A joist that sits proud is planed or cut down, or the others are packed up. Joist spacing determines the board thickness. With old floors that sag or have damaged joist ends, it is worth having the load-bearing capacity assessed by a structural engineer. Replacing or strengthening structural joists is not routine flooring work, and before such work it is worth checking with building control whether approval is needed. New or altered floor joists should be designed by an engineer to Eurocode 5 (BS EN 1995-1-1) with the UK National Annex. In a block of flats the floor structure is usually not part of the flat itself, and work on it needs the consent of the freeholder or management company and input from a specialist.
Existing solid floor
On concrete, stable chipboard or an old timber floor with no movement, OSB can be laid directly and screwed into the base. A concrete slab may first need grinding and levelling if it is uneven. On ground-floor concrete or concrete above a cellar, a polythene damp-proof membrane goes down first, usually at least 0.2 mm thick, so that moisture from the base does not pass into the timber. An old timber floor that squeaks should be screwed down into the joists before installation, otherwise the squeaks carry through into the new layer.
Dry levelling fill and insulation
Where larger differences in level need making up, a dry levelling fill is used. It is spread, compacted and screeded flat. Rigid insulation boards go on top, such as high-density mineral wool floor boards or wood fibre boards, and the OSB goes on those. Soft insulation intended for walls or roofs does not belong in a floor, as the board would flex on it.
On insulation, a so-called floating floor is created. The OSB is not screwed through the insulation into the base. The screw would compress the insulation, the board would not sit flat at that point, and footfall noise would travel through the screw into the structure below. Tongue and groove boards are therefore glued at the joints to form one rigid deck. The alternative is a two-layer build-up, where the top layer is laid with staggered joints and screwed only to the bottom layer, using screws shorter than the combined thickness of both boards. Before a major change to the floor build-up in a block of flats, it is sensible to inform the managing agent or the freeholder.
Which thickness and board type to choose
Thickness depends on whether the board spans on its own or simply lies on a solid base. As a guide:
- 15 mm only as a levelling layer on a solid, continuous base, not on joists,
- 18 mm for joists or battens at closer centres, usually up to about 500 mm. Some manufacturers allow around 600 mm for tongue and groove OSB3 under normal domestic loads,
- 22 mm or more for wider joist centres or heavier loads, for example in a workshop.
Exact spans are given in the board manufacturer's tables and should be followed. For heavier loads a two-layer build-up can be used, with the second layer bridging the joints of the first.
For interior floors, OSB3 is the usual choice, as it tolerates moderate humidity. OSB4 is stronger and intended for more demanding conditions. OSB2 is only for dry conditions and is not well suited to floors. Tongue and groove boards give stiffer joints between joists, so they are used for floors more often than square-edged boards. A sanded board has a smoother surface, which helps under thin coverings such as vinyl.
How the installation works step by step
- Survey and measuring: the installer checks the joists or base, tests the level with a straightedge and decides on the board thickness and build-up.
- Acclimatisation: the boards lie flat for at least 24 to 48 hours in the room where they will be fitted, so they adjust to its temperature and humidity.
- Base preparation: as agreed, the old covering is removed, the base is cleaned, joists are levelled by packing or cutting down, and irregularities are levelled out.
- Underlying layers: on concrete, a damp-proof membrane is laid with overlapping joints, followed by levelling fill and insulation boards where needed.
- First row: boards are laid with the long edge across the joists and the tongue towards the wall. The tongue is usually cut off along the wall so the board sits straight. A gap of about 10 to 15 mm is left around the perimeter, for example using wedges.
- Staggered layout: the end joints of neighbouring rows must not line up. Short edges without tongue and groove must land on a joist.
- Joining the boards: the tongue of each new board goes into the groove of the previous one and the board is knocked home with a rubber mallet against an offcut, so the edge is not damaged. With square-edged boards, a gap of about 2 to 3 mm is left between them. On a floating floor, the joints are always glued; elsewhere, as agreed.
- Screw fixing: wood screws about two and a half times the board thickness in length go in roughly every 150 mm around the board edges and every 300 mm across the field, about 10 mm from the edge. Heads are set just below the surface. On a floating build-up nothing is screwed into the base; only the board layers are screwed together.
- Finishing: lips at the joints are sanded flush, the surface is vacuumed and checked with a straightedge.
What affects the price
The guide labour price is €19.50 per m². It applies to standard installation on a prepared, flat base. Anything that adds cutting, preparation or extra layers pushes the quote up:
- Condition of the base: flat concrete or level joists are the cheapest case. Sagging joists that need packing or cutting down can raise the price per m² by tens of percent, because it is slow work by hand.
- Removing the old floor: taking up parquet, floorboards or vinyl and removing the waste is usually charged as a separate item. Before you hand over the old floor or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
- Build-up under the boards: membrane, levelling fill and insulation mean extra steps and make the job considerably longer.
- Board thickness and type: thicker boards are heavier and harder to handle. A two-layer build-up means roughly twice the screwing and cutting. OSB4 costs more than OSB3.
- Room shape: many corners, recesses, columns and cut-outs around pipes increase the number of cuts and the material wastage.
- Area: in a small room, the fixed costs of travel and setting up are spread over fewer square metres, so the price per m² tends to be higher.
- Access: carrying boards to an upper floor without a lift, a narrow loft staircase or a long walk from the van will show in the quote.
When comparing quotes, check whether the price includes materials, screws, adhesive and waste removal, or labour only.
What makes the job easier and what slows it down
- A cleared room: the boards are large and need free space for laying out and cutting. Every piece of furniture that has to be moved slows the work.
- Materials on site in time: the boards must be in the room at least a day or two before installation. If they arrive on the day, either there is a wait or there is a risk of laying them without acclimatisation.
- Services finished under the floor: if the electrician or plumber turns up after the floor is closed, boards have to be lifted.
- A dry building: wet trades such as plastering and screeding in other rooms should be finished and the rooms aired, so the timber does not absorb moisture.
- Power and a cutting area: the saw and drivers need a socket, and cutting is best done on a balcony, in a garage or outside.
- Agreed waste removal: in a block of flats it helps to know in advance where the old floor and offcuts will go and what hours noisy work is permitted.
- A clearly specified covering: if the installer knows what goes on top, the right board and surface accuracy are chosen from the start and nothing has to be redone.
Typical mistakes and how they show up later
Most problems appear only after a few months, when the floor starts to ripple or squeak.
Board pushed tight against the wall. In humid weather the timber expands, has nowhere to go and the floor lifts. Under laminate this shows as a ridge or a raised joint. An expansion gap, as with a perimeter expansion strip for levelling compounds, prevents this.
Too few screws or screws missing the joist. The board flexes and squeaks, often exactly where people walk most, such as by the door or beside the bed.
Screws through the insulation into the base. On a floating floor, the screw compresses the insulation, the board dips around it and footfall noise goes straight into the structure. Neighbours below hear steps as if there were no insulation.
Unglued joints on a floating floor. The boards move against each other, small steps form at the joints and the floor squeaks.
Installation on an uneven base. The undulations carry through to the laminate or vinyl, the click joints of the covering are stressed and can break.
Thin board on widely spaced joists. It deflects between joists, the floor feels springy underfoot and the covering later clicks.
Boards not acclimatised. Boards fitted straight from a cold store shrink or expand once the room warms up, leaving gaps or steps at the joints.
Short joints unsupported between joists. With square-edged boards, the edges shift against each other under load and the joint can be felt through the covering.
Tongue damaged when knocking boards together. Striking the board edge directly without an offcut crushes the tongue, the joint does not hold and the board flexes there.
Missing damp-proof membrane on concrete. The timber draws moisture from below, swells, and mould can form under the covering.
Screws driven too deep. The head breaks through the board surface and holds less well. Heads left proud, on the other hand, punch through the underlay and imprint into the covering.
How to check the finished floor
Before the final covering goes onto the OSB, it is worth walking the floor and checking:
- flatness with a straightedge in several directions, with no noticeable undulations or steps at joints, and for vinyl roughly within 2 mm under a 2 m straightedge,
- that the floor does not flex or squeak underfoot, especially along the walls and midway between joists,
- the expansion gap around the whole perimeter, including thresholds and pipes,
- the staggered layout and that end joints do not line up,
- screw spacing and that heads sit just below the surface,
- on a floating floor, that joints are glued and no screw passes through the insulation into the base,
- that the surface is clean, free from dust, splinters and raised edges,
- on concrete, that a damp-proof membrane is present under the boards,
- that doors open freely after the floor has been raised and that thresholds to neighbouring rooms are as agreed.
DIY guide: OSB boards on a solid base
On a stable old floor or level joists in good condition, OSB can be laid as a DIY job. A cordless drill driver, circular saw, spirit level, long straightedge and rubber mallet are enough. The method is the same as in the step-by-step section above; these are the extra points a DIYer needs to watch. If there is any doubt about the strength of the joists, seek specialist advice and do not alter the structural joists.
- Before screwing into an old floor or joists, find out where cables and pipes run, so a screw does not pierce them.
- Mark the joist positions in pencil on the wall or on the membrane, so the screws hit the joist through the board.
- Plan the board layout on paper so there is no narrow strip at the opposite wall and short joints land on joists.
- Start at the longest straight wall, cut the tongue off the first row and set that edge towards the wall.
- Always knock boards home against an offcut, never directly on the board edge.
- Cut wearing safety glasses and a dust mask, ideally outdoors, as OSB produces a lot of dust when cut.
- Check the finished floor with the straightedge and by walking on it, and screw any squeaking spots down into the joist straight away.
A floating floor on insulation in a block of flats is better left to a professional, because a fixing mistake shows up as noise in the neighbours' flat and is difficult to put right.
Frequently asked questions
The guide price is around €19.50 per m². The final price is mainly increased by an uneven base and packing of joists, removal of the old floor, levelling fill and insulation, a thicker or two-layer build-up, an awkwardly shaped room and difficult access.
Yes, in a workshop, plant room or industrial-style interior this is common. The surface is sanded and treated with lacquer, oil or hard wax so it copes better with wear and moisture.
On joists and on a solid base, thorough screw fixing is usually enough. Adhesive in the tongue and groove joint, or between layers in a two-layer build-up, increases stiffness and reduces the risk of squeaks. On a floating floor over insulation, glued joints are essential, because nothing is screwed into the base.
Yes, but timber conducts heat less well than concrete. Dry underfloor heating systems designed for timber floors are therefore used, and the recommendations of both the heating and the covering manufacturer should be followed.
Tiling directly onto OSB is not recommended, because timber moves and the tiles may crack. A cement particle board or another tile backer board is usually fixed between the OSB and the tiles, and a flexible tile adhesive is used according to the manufacturer's instructions. Choose a tile adhesive classified to BS EN 12004 (e.g. C2 for demanding substrates) and a grout classified to BS EN 13888 (e.g. CG2).
Most often because the board is not bearing on the base at some point or has too few screws. Adding screws into the joist helps, as does packing any spot where the board is unsupported, and checking that the board is not pressing against the wall anywhere.
Straight after installation, provided the surface is flat, firm and clean. OSB does not need drying time like screed. On a floating floor, wait until the adhesive in the joints has cured, as stated by the adhesive manufacturer. Under vinyl a sanded board and flush joints are worthwhile, because a thin covering shows every small step.
Related work
When to grind a concrete subfloor before new flooring, how the job is done, what makes it harder and how to check the surface is ready.
How a subfloor is ground clean of old adhesive and bitumen before levelling, what makes it harder, common mistakes and how to check the result.
How to fit a perimeter expansion strip before pouring levelling compound or screed, which strip to choose and how to check the finished work.
How to prime a floor before levelling, which primer suits which subfloor, when to seal corners and gaps, and how to check the floor is ready.
When self-levelling compound makes sense, how to prepare the subfloor, how to pour it properly and what to check before laying a new floor.
How a 20 mm wood fibre underlay board is laid under a new floor, what it does for warmth and footstep noise, and what to watch with the subfloor.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.