Building work price list: Plasterboard Partition with Rigips Habito Boards (High Load-bearing Capacity)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Plasterboard systems cost | ||||
| High-impact plasterboard partition | m² | €24.00 / m² | m² | enter quantity- |
| Single-layer plasterboard stud partition | m² | €23.50 / m² | m² | enter quantity- |
| Double-layer plasterboard stud partition | m² | m² | - | |
| Plasterboard wall lining | m² | €18.00 / m² | m² | enter quantity- |
| Plasterboard flat ceiling | m² | €23.00 / m² | m² | enter quantity- |
| Sloped ceiling plasterboarding | m² | €28.00 / m² | m² | enter quantity- |
| Lay-in grid ceiling (incl. gridwork) | m² | m² | - | |
| Vapour barrier installation in plasterboard ceiling | m² | €1.40 / m² | m² | enter quantity- |
| Stud wall insulation | m² | €2.50 / m² | m² | enter quantity- |
| Lightweight mobile aluminium scaffold tower for high ceilings | m² | €3.00 / m² | m² | enter quantity- |
| Mineral wool thermal insulation in a plasterboard ceiling (up to 100 mm) | m² | €4.00 / m² | m² | enter quantity- |
Habito plasterboard partition: what it is and when you need it
A partition built with Rigips Habito boards from Saint-Gobain (in the UK, British Gypsum sells it as Gyproc Habito) looks the same as an ordinary stud wall. The difference is the board. Its core is denser and harder, and it takes screws directly, within the limits the manufacturer gives. The steel stud frame, the mineral wool inside and the jointing are the same as on a standard partition. The wider trade is covered in the overview of plasterboard work.
People choose it mainly when they want to hang kitchen units, a television or shelves on a new wall without fitting timber noggins. Typical uses are splitting a large room in two, separating the kitchen from the living room, a new wall with a wardrobe, or a study corner with shelving. If a hard surface, a quieter wall or a damper room matters more to you, Knauf Diamant board is the alternative.
Board load capacity: Habito or Diamant
Both are high-strength boards. Both have a hard core, and for both the manufacturer states how much a screw fixed directly into the board will hold. They differ in what they are designed for first.
- Rigips Habito is designed mainly for loading. According to the manufacturer, one correctly driven screw directly in the board holds up to about 20 kg, without a wall plug. It suits kitchens, living rooms, wardrobes and studies. The standard version is not intended for damp areas. For wet rooms look for the moisture-resistant version and check its marking.
- Knauf Diamant is chosen for a hard, impact-resistant surface and better sound reduction between rooms. According to the manufacturer, it also takes screws directly. It is also moisture-resistant, so it can be used in damper rooms such as bathrooms. It suits walls between a bedroom and living room, children's rooms, hallways and offices.
Why is standard board not enough? On ordinary plasterboard a heavy unit can only be hung with cavity fixings or into a noggin built into the frame. With a hard board the load is spread into the core, so you have more freedom over where things go. For very heavy items such as a wall-hung WC, a basin or a large bookcase, a fixing frame or reinforced framing is still planned.
What to decide before you order
A high-strength partition makes sense when you know in advance what will hang on it and what will run through it. Changes to a finished wall are laborious and they show.
- What will be hung and where: kitchen units, a TV on a bracket, shelves, a radiator. For each item it is worth knowing the approximate weight including contents. This decides whether the board alone is enough, whether the studs should be closer together, or whether a frame or reinforcement is needed.
- Stud width: vertical C studs of 50, 75 or 100 mm are commonly used. A narrower stud saves space, a wider one allows a taller wall and leaves room for larger services.
- One or two layers of board: a double layer is stronger, stiffer and better at reducing sound, but the wall is thicker and takes longer to build.
- Finished wall thickness: Habito board is usually 12.5 mm. A partition with 50 mm studs and one board each side is about 75 mm, with 75 mm studs about 100 mm. Two layers add another 25 mm.
- Wall height: with 50 mm studs and a single layer, partitions are roughly built up to about 2.6 to 3 m. Taller walls need wider studs, a double layer or closer stud spacing. The exact limits are in the manufacturer's tables for its system.
- Doors: position, width, type of lining and which way they open. A pocket door needs a special cassette that must be ordered in advance.
- Services: where sockets, switches and lights go, and any water supply and waste pipes.
- Sound insulation: if the partition separates a bedroom or children's room, plan mineral wool across the whole cavity and possibly a double layer or Diamant board. See also installation of acoustic and thermal insulation.
- Surface finish: a standard wall for emulsion needs less jointing than a wall under raking light from a window or under a sheen paint. Agree this in the quote.
How the partition is built step by step
The method is similar to a standard stud partition, such as a single-layer plasterboard partition. Harder boards, however, need a more accurate frame, different screws and more powerful tools. A partition of around 10 to 15 m² in a flat is usually framed and boarded in one to two days. Jointing and sanding take another one to three days, depending on how quickly each coat of filler dries.
- Setting out: the line of the partition is marked on the floor, ceiling and walls, along with the positions of doors, services and anything to be hung.
- Perimeter track: horizontal track is fixed to the floor and ceiling with sealing tape underneath for acoustics, and fixed into a solid substrate. Studs against the walls are fixed the same way. If the ceiling itself is new, coordinate with plasterboard and suspended ceiling installation.
- Studs: placed at the spacing given by the manufacturer, usually 600 mm or 625 mm depending on the system, which is half the board width. On a wall for kitchen units or heavy shelves the studs are often set closer, for example at about 400 mm. They are checked for plumb and alignment.
- Doors and reinforcement: reinforced studs are used at door openings, sometimes with a timber insert, so the lining does not loosen as the door closes. Fixing frames or reinforcement go where very heavy items will hang.
- Services: conduits and back boxes are prepared. Electrical work in the partition should be designed, installed and certified to BS 7671:2018+A4:2026, the current IET Wiring Regulations. In England and Wales a new circuit is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start.
- Boarding: one side is boarded, mineral wool is fitted and the second side is boarded. Boards are fixed with self-drilling screws intended for hard boards, at the spacing in the manufacturer's instructions, with joints staggered from the other side. With two layers, the joints between layers are staggered too.
- Jointing and finishing: joints are filled with reinforcing tape, corner beads are fitted, and the surface is sanded and prepared for priming and decoration or tiling. The junction with the ceiling and walls is sealed with a flexible sealant so the corners do not crack and the wall does not carry sound.
Cost of a Habito partition per m²
The guide labour price is €24.00 per m². It applies to a standard straight partition in a room of normal height with one layer of board. Two partitions of the same area can still cost noticeably different amounts. The main factors are:
- Room height: tall walls need wider studs, board extensions and work from a tower scaffold. The price per m² rises in tall spaces.
- Number of board layers on each side and sound insulation requirements. A double layer means twice the boards and screwing, so the labour increases significantly.
- Doors, corners, recesses and junctions with sloping or uneven walls and loft slopes. Every opening and turn means more cutting, reinforcement and corner jointing.
- Services, back boxes and penetrations that have to be left in the partition and cut accurately in the hard board.
- Closer stud spacing, reinforcement and fixing frames for heavy items. Frames are often charged as a separate item.
- Required surface finish: a wall under raking light or sheen paint needs more thorough jointing and sanding, or a full skim.
- Site access: carrying heavy boards to an upper floor without a lift and working in an occupied home add to the labour.
- Small jobs: on a small partition, travel, preparation and cleaning make up a larger share, so the price per m² is higher.
High-strength boards are heavier and harder to cut, so installation usually takes longer than with standard plasterboard. When comparing quotes, check whether the area is measured with or without openings, and whether jointing, corner beads and mineral wool are included.
What makes the job easier and what slows it down
Apart from the wall itself, a lot depends on how the site is prepared and how quickly decisions can be made.
- A finished kitchen or furniture plan helps, with unit sizes and heights. It shows the installer where to close up the studs, where to add reinforcement and where services must not run.
- Decisions on sockets and switches help before the second side is boarded. Moving back boxes later means cutting finished board.
- Wet trades should be finished and dry. Plastering and screeding raise humidity, and plasterboard should be fitted in a dry, heated space.
- Boards need storage space, flat, dry and on a level base. With long boards, check they will fit up the stairs or in the lift.
- A cleared area around the future partition, protected flooring and power for tools speed up the start.
- Moving the door or wall position during installation, once the track is fixed, slows the job down.
Mistakes that undermine the partition's strength
A more expensive board does not guarantee a strong wall on its own. The problem is usually in the installation details, not the material.
- Standard screws in hard board: they struggle to penetrate, tear the paper or are left proud. Use screws intended for that type of board. Proud heads show as bumps under paint, and torn paper around a screw holds less well.
- Screws or studs too far apart: the wall then flexes under load and cracks at the joints. Cracks appear after decoration, often only once the units are hung.
- Inaccurate framing: twisted studs cannot be corrected by the board. The difference shows in the jointing and in hung units that do not sit flat against the wall.
- Mixing components from different systems: the manufacturer's figures apply to its own build-up and are not valid when parts are mixed.
- Missing reinforcement at doors: the lining loosens over time and cracks form around it.
- Overloading a single point: Habito has its limits too. Hang heavy items on several screws or on a rail that spreads the load. Anything beyond the board's capacity belongs on a frame or noggin.
- Poor junctions with floor, walls and ceiling: without sealing tape the wall carries more sound than expected. A rigid ceiling junction without flexible sealant leads to a straight crack in the corner that returns after redecoration.
Approvals and agreement with the building manager
A new partition changes the layout of a flat or house. Before work starts, check with your local authority's building control whether your alteration needs approval, and do not assume that nothing is required. In a block of flats, tell the freeholder or managing agent in advance, and check your lease, especially if there will be demolition, drilling into ceilings or work on shared services. A lightweight stud partition does not normally affect the structure of the building, but if a load-bearing wall is also being altered, a structural engineer is needed. In Scotland, building or removing load-bearing walls needs a building warrant from the council before work starts. In homes built before 2000, have suspect materials tested before you drill or demolish - asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
How to check the finished partition
At handover, ask to see which boards and screws were used, and inspect the wall under raking light.
- the partition is plumb and flat, with no significant gaps under a straightedge held in different directions,
- the board type marking is legible, or you have the delivery note,
- joints and corners are filled with no cracks, bubbles or visible tape,
- screw heads are set just below the surface and have not broken through the paper,
- the wall does not flex when pressed with a palm and does not sound markedly different in places when tapped,
- the door closes freely and the lining does not move when the door is shut firmly,
- the junction with the ceiling and walls is flexibly sealed, with no gaps,
- closer studs, reinforcement and frames are where agreed, ideally seen before boarding,
- back boxes and outlets are in the agreed positions, and you have an electrical installation certificate for the new wiring,
- you have a record of where services and studs run, so you do not damage anything when drilling. A photo of the wall before the second side is closed also helps.
Frequently asked questions
The guide price is €24.00 per m². The final figure depends on room height, the number of board layers, the number of doors and openings, reinforcement for heavy items and the required standard of jointing.
In most cases yes, which is the main reason Habito is chosen. A unit full of crockery and food can weigh more than it seems, so work out the weight including contents in advance and compare it with the manufacturer's screw capacity. Units are hung on a hanging rail or several screws to spread the load, and studs are often set closer on a kitchen wall. Follow the instructions of both the board manufacturer and the unit manufacturer.
For Habito, the manufacturer states the capacity of a screw fixed directly into the board without a plug. A wood screw of suitable length is used. Cavity fixings are a solution for standard plasterboard and will not raise the capacity beyond the Habito limit. For items heavier than the manufacturer states, prepare a frame or noggin in the structure, or fix into a stud.
Knauf Diamant is a moisture-resistant board, so it suits a bathroom. Standard Habito is not intended for damp areas, so use its moisture-resistant version and check the marking on the board. In a shower enclosure and around a bath, both boards still need tanking under the tiles.
Heavier, denser boards, especially Diamant, reduce sound better. A lot also depends on the mineral wool inside, the number of layers and the quality of the junctions with the surrounding structure.
With 50 mm studs and one board each side it is about 75 mm, with 75 mm studs about 100 mm. A double layer adds another 25 mm. A thicker wall is stiffer and can be built taller.
Yes, it is a dry construction that can be taken apart without breaking masonry. Only the fixing holes in the floor, ceiling and walls remain, and these need filling.
Related work
How a single layer plasterboard partition is built, when it is enough, what makes the job harder and how to check the finished wall.
How a flat gypsum board ceiling or suspended ceiling is installed, which boards to choose, what makes the job harder and how to check the result.
How mineral wool is fitted into plasterboard partitions, wall linings and lofts, which material to choose and how to check the finished work.
How a double-layer plasterboard partition is built, when it beats a single-layer wall, which mistakes to avoid and how to check the finished wall.
How a plasterboard furring wall without insulation is built, when it makes sense, which studs and boards to choose and what to check on the finished wall.
How a suspended ceiling with a metal grid is installed, which tiles and grid to choose, what makes the job harder and how to check the finished ceiling.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.