Building work price list: Plastic Gutter Edge Trim for Roofing & Cladding
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
| Insulation | ||||
| External wall insulation with polystyrene (full adhesive bond and anchoring) | m² | 25,00 € / m² | m² | enter quantity- |
| External wall insulation with mineral wool (inc. fixings) | m² | 28,00 € / m² | m² | enter quantity- |
| Install ETICS system up to 20 cm | m² | 13,00 € / m² | m² | enter quantity- |
| Window reveal insulation (XPS) | lm | 3,00 € / lm | lm | enter quantity- |
| Ceiling/loft insulation | m² | 10,00 € / m² | m² | enter quantity- |
| Vapour barrier installation | m² | 4,00 € / m² | m² | enter quantity- |
| Thin-coat external render (scraped 2 mm) | m² | m² | - | |
| Apply fibreglass mesh to walls + adhesive | m² | m² | - | |
| Install PVC corner bead | lm | 1,90 € / lm | lm | enter quantity- |
| Install APU bead with mesh | lm | 0,90 € / lm | lm | enter quantity- |
| Window head drip bead | lm | 2,50 € / lm | lm | enter quantity- |
| Sprayed foam insulation (closed cell) | m² | m² | - | |
| Sprayed foam insulation (open cell up to 25 cm) | m² | m² | - | |
What the corner bead does and where it goes
The corner is the most vulnerable spot on any facade. Bikes, ladders, wheelbarrows and footballs all end up hitting it. If there were only a thin layer of base coat and render over polystyrene or mineral wool, the edge would soon be chipped and broken. The bead gives the corner a rigid edge, and the mesh bonds it firmly to the base coat on both walls.
The second reason is appearance. Without a bead it is very hard to form a straight, crisp corner over the full height of a house. With a bead, the installer has a fixed edge to work the base coat and render against.
Corner beads are typically fitted:
- On the external corners of the building
- On the edges of window and door reveals
- On the corners of balconies, loggias and parapets
- On the underside edge of window heads, where a bead with a drip edge is used
Types of bead and when to use which
Standard corner bead with mesh
This is the usual choice for right-angled corners. The main difference between products is the width of the mesh on each side. Wider mesh ties the corner more securely into the wall surface, so it is chosen for exposed spots that take more knocks.
Drip edge bead
This one goes on the underside edge of window heads, balcony slabs and any projecting parts. A small drip nose makes water drop off instead of running along the underside back towards the window or onto the facade. Wherever water runs off an edge, this bead replaces the standard one.
Flexible bead for other angles
For obtuse or sharp angles, for example on bay windows or curved walls, a flexible bead is used that can be bent to the shape.
PVC or aluminium?
Almost all insulation systems today use PVC. It does not corrode, does not react with the alkaline adhesive and is easy to cut. If you are using a certified insulation system, choose the beads the system manufacturer lists as part of it. Otherwise you risk problems with the warranty for the whole system.
How the job is done step by step
The bead goes on after the insulation boards are bonded and anchored, but before the reinforcing mesh is embedded across the wall surface.
- Rasp the corner of the insulation so both faces are flat and the edge has no steps.
- Brush off the dust and rasping debris.
- Spread base coat on both sides of the corner, slightly wider than the mesh on the bead.
- Press the bead into the base coat and set it plumb with a spirit level or straightedge.
- Trowel the base coat over the mesh so the mesh is fully embedded and nothing sticks out.
- Butt the next length of bead tightly against the previous one and let the mesh overlap.
- Embed the facade mesh across the wall so it overlaps the mesh of the bead, then apply the second layer of base coat.
At the corners of window and door openings, extra diagonal strips of mesh are added. Without them, the typical diagonal cracks running out from window corners appear.
What makes the job easier or harder
The number and length of corners matter most. One long building corner is much quicker than dozens of short edges around small windows. Reveals take more effort because they are narrow and the bead often has to meet a window connection profile.
The job also takes longer with:
- Uneven insulation that has to be rasped flat first
- Unusual angles and curves
- Work from scaffolding at height, where every step is slower
- Bad weather, when the crew has to wait
On the other hand, when the beads are fitted as part of the same process as the base coat on the whole facade, the work runs smoothly without unnecessary downtime.
Common mistakes
- Bead stuck onto dry insulation without base coat. It only holds at a few points and comes loose over time.
- Mesh not embedded. If the mesh is visible or sits on the surface, the base coat peels away around it.
- Beads overlapped. This leaves a bump on the corner that the render will not hide. The plastic parts should butt together. Only the mesh should overlap.
- Crooked corner. If the bead is not set with a level, it shows as soon as the render is on, especially in low side light.
- No drip edge above the window. Water then runs along the window head and the facade around the window stays dark and damp.
- Work in frost, rain or direct sun. The base coat does not cure properly and may crack. Most manufacturers specify a surface and air temperature of roughly +5 °C or more and recommend protecting fresh work from rain.
DIY guide: fitting a bead on a low corner
If you are insulating a garage, a garden building or the ground-floor part of a wall and can work from the ground, you can fit the bead yourself. Leave work from scaffolding and the facade of a whole house to the company doing the rest of the insulation.
- Get the beads, base coat, trowel, spirit level and a knife for cutting plastic ready.
- Rasp the corner of the insulation with a rasping board and brush off the dust.
- Measure the length and cut the bead. At windows, keep the plastic part shorter and the mesh longer.
- Mix the base coat according to the instructions on the bag.
- Spread base coat on both sides of the corner.
- Press the bead in, set it plumb with the level and trowel the mesh into the base coat.
- Scrape off excess base coat so no lumps form on the edge.
- Let it dry as the manufacturer specifies before continuing with the mesh on the wall surface.
How to check the finished work
Inspect the corners before the render goes on. After that, mistakes are hard to put right.
- The corner is straight over its full height, checked with a straightedge or level
- The mesh of the bead is nowhere visible and is fully embedded in the base coat
- Bead lengths butt together without bumps or gaps
- The facade mesh on the wall overlaps the mesh of the bead
- Diagonal mesh strips are in place at the corners of windows
- A drip edge bead is fitted above windows and on underside edges
- The bead does not sound hollow when tapped and does not move
Frequently asked questions
Wrapped mesh reinforces the corner, but it does not give it a rigid, straight edge. The corner chips more easily and is hard to get straight. Using a bead is the normal and recommended practice for external wall insulation.
Not in a way that works properly. The bead has to sit in the base coat beneath the render. To repair a damaged corner, the render and base coat around it are removed and the corner is rebuilt.
With a certified system, it makes sense. The manufacturer usually only stands behind the whole system when the listed components are used. You will find this in their technical data sheets.
In a block of flats, the owners usually decide on insulation together and the building management or owners' association organises it. Whether the work needs permission under local building regulations is something to check with your local building authority.
Related work
How external wall insulation with fully bonded polystyrene boards is installed, which materials to choose, what to avoid and how to check the finished work.
How mineral wool external wall insulation is bonded and anchored, when it makes sense, what complicates the job and how to check the result.
How external wall insulation (ETICS) up to 20 cm is installed, when to choose EPS or mineral wool, and how to check the finished facade.
How window reveals are insulated with XPS boards, which thickness fits, how to join the insulation to the frame and facade, and what to avoid.
How a 2 mm scraped exterior render is applied, which type to choose, what makes the job harder and how to check the finished facade.
How a window head drip bead is fitted on an insulated façade, which type to choose and how to stop rainwater running back into the window reveal.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.