Building work price list: Stain block for water and nicotine
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Painting cost | ||||
| Acetone-based stain-blocking primer for water and nicotine stains | m² | €3.80 / m² | m² | enter quantity- |
| Painting - basic white emulsion (2 coats) | m² | €2.10 / m² | m² | enter quantity- |
| Wall painting - coloured finish | m² | m² | - | |
| Oil-based paint application to plinth | m² | €7.50 / m² | m² | enter quantity- |
| Ceiling painting | m² | €2.90 / m² | m² | enter quantity- |
| Painting vertical heating pipes | lm | €3.00 / lm | lm | enter quantity- |
| Painting cast iron radiators | pcs | €65.00 / pcs | pcs | enter quantity- |
| Painting radiators (per section) | pcs | €2.40 / pcs | pcs | enter quantity- |
| Wallpapering walls | m² | m² | - | |
Why a stain bleeds through ordinary paint
Water that has run through a ceiling or wall carries soluble substances from the plaster, old layers of paint and the ceiling structure up to the surface. Once it dries, a yellow or brown tide mark is left behind. Nicotine, soot and grease behave in a similar way on a wall. Ordinary emulsion is thinned with water, so as you paint it dissolves these substances again and draws them into the new coat. When the paint dries, the stain is back.
That is why coat after coat of white does not help either. On forums this is the most common complaint: a ceiling painted three times and the brown stains still showing through. Stain block forms a seal between the stain and the emulsion that these substances can no longer get through.
When stain block is needed
- water stains after a leak: from the neighbour above, the roof, a balcony, a window or a burst pipe. A brown edge around a lighter centre is typical,
- rusty stains from heating water: water in heating systems tends to be cloudy and rusty, so stains after a radiator leak or around vertical heating pipes are more pronounced and harder to cover,
- nicotine: a smoker's flat has a yellowed ceiling and walls, often with the typical smell that comes back when you paint,
- soot and smoke: from a fireplace, stove, candles or after a small fire,
- grease: in the kitchen above the cooker, around light switches or next to the bed,
- felt tips, pens and crayons: children's drawings on the wall bleed through white just like a water stain.
The job is most often done as part of ordinary decorating. The decorator treats the stains and then goes over the whole room with two coats of white base paint. In a smoker's flat, stain block is often applied to entire walls and ceilings, not just to individual patches.
When stain block will not help
When it is still leaking or the wall is damp
Stain block seals the stain, not the water. If a joint at the neighbour's is still dripping or the plaster is still wet, the stain will come back through any paint, and the moisture will also make the coating peel. The cause has to be dealt with first and then the area left to dry out completely. After a minor leak this takes days, after a flooded ceiling it can take several weeks. Ventilation, heating and, with major damage, a dehumidifier will help.
Mould
Black spots in a corner or behind a wardrobe are not a stain to be covered up. Mould is removed, the area is treated with an anti-mould product and the cause is tackled, meaning damp, a cold corner or poor ventilation. Mould that is simply painted over will return, and stain block does nothing about it.
Peeling and blistered paint
Water often softens old layers of paint, which then blister or fall away. A coating has nothing to grip on such a surface. Loose layers must be scraped off and the uneven area made good. On a larger area or with crumbling plaster, skimming the ceiling or the walls comes first, and the stain block only goes on after that.
What needs deciding before the work starts
Just the stains, or the whole surface
For one or two water stains, stain block on the stain with an overlap is enough. In a smoker's flat where the whole ceiling has yellowed, the sealer goes on the entire surface, because the nicotine is everywhere, even where the eye cannot yet see it. This decision changes the price more than anything else, so it is worth agreeing on it in advance.
Water-based or solvent-based
There are two types to choose from, and from the point of view of the work they differ mainly in drying time and smell:
- water-based stain block paints barely smell and suit a lived-in flat. Depending on the product, they can be overcoated after a few hours or only after 24 hours. With longer drying times the decorator has to come twice, which stretches the schedule,
- solvent-based stain blocks, the "solvent paint" mentioned above, cover even stubborn stains, often in a single coat, and dry quickly. However, they smell strongly and are flammable, so the room must be ventilated and there must be no naked flame in it. Stain block sprays also fall into this group.
Some manufacturers of water-based paints state explicitly that for heavy water, nicotine or soot stains their paint may not be enough and recommend a solvent-based product. Specific products, drying times and paint prices can be found in the overview of stain block paints.
Who buys the materials
Stain block paints are considerably more expensive than ordinary emulsion. It is worth agreeing whether the decorator or you will supply them, and which type will be used. That way you compare like with like when looking at quotes.
Who pays for repairs after a leak
If your neighbour has flooded you, it is worth sorting this out before decorating. In a block of flats, the emergency service is called first to establish whether the water came from the neighbour or from shared pipework. The repair is then usually covered by home contents or buildings insurance, or by the neighbour's liability insurance. The insurer will want photos of the stains before repair and often a quote for the work as well, so photograph the stains before painting.
How the work is done step by step
- Checking the surface: the decorator confirms the area is dry and no longer leaking. If in doubt, a moisture meter or waiting a few more days will settle it.
- Masking: the floor, furniture and surroundings are covered with sheeting and edges are taped. With a solvent-based product the windows are opened.
- Removing loose layers: blistered and peeling paint is scraped back to a sound surface.
- Cleaning: the stain is dusted off. Walls in a smoker's flat and greasy areas in the kitchen are washed with water and detergent and left to dry, otherwise the coating will not adhere well.
- Making good: hollows and sharp edges left by scraping are filled and sanded once dry.
- Stain block: it is applied over the stain with an overlap of several centimetres beyond its edge, because the edge of a stain tends to be the strongest part.
- Check and second coat: once dry, the stain is checked. If it still shows through, a second coat goes on.
- Repainting the whole surface: when the stain block is dry, the whole ceiling or whole wall is painted with ordinary emulsion, usually two coats.
Why the whole surface and not just the stain? Stain block has a different shade, sheen and absorbency from the rest of the wall. If only the treated area is repainted, a visible patch on a patch remains on the ceiling, especially in side light from a window.
What affects the price
The guide price for labour in the price list is €3.80 per m² of coated surface, excluding materials. The final amount is mainly influenced by the following:
- number and size of stains: in practice a small stain is often charged as a full square metre. The decorator has to mask the surroundings, prepare the product and come back to check just the same, whether the stain is small or large,
- ceiling or wall: stains on a ceiling are slower work, needing a ladder or scaffold, and with a solvent-based product more frequent breaks for ventilation,
- number of coats: rusty stains from heating water, soot and heavy nicotine often need two coats,
- preparation: scraping off blistered paint, washing walls in a smoker's flat and making good the surface are separate jobs,
- whole surface instead of stains: in a smoker's flat the full area of walls and ceilings is charged,
- number of visits: with a paint that takes 24 hours to dry, the decorator comes twice. A solvent-based product can be overcoated sooner and the job fits into one day,
- materials: stain block paints are more expensive than ordinary decorating paints and are not included in the labour price.
On top of the stain block price comes repainting the whole surface and, depending on the condition, scraping and skimming. You can work out the cost of decorating a whole room including stain treatment in the painting and decorating price list.
What should be ready beforehand
- the cause of the leak has been fixed and the ceiling or wall is dry,
- for damage caused by a neighbour, the stains have been photographed and the insurer knows about the damage,
- furniture has been moved away from the walls and small items cleared,
- the room can be ventilated, and while a solvent-based product is being used there will be no children or pets in it,
- it is clear whether only the stain or the whole surface is being sealed, and who is buying the materials.
Typical mistakes and how they show up later
Painting onto a damp surface
The stain returns after a few weeks and the coating starts to peel. This happens most often when decorating is rushed straight after the leak has been repaired.
Just another coat of white
The stain bleeds through even after the third coat. Emulsion simply is not enough over a water stain, however thick it is.
Stain block without an overlap
The edge of the stain is left untreated and after repainting a thin brown ring appears.
Only the treated stain repainted
Once dry, the ceiling has a different white where the stain was, and in side light the repair is obvious at first glance.
Bleach instead of stain block
On forums people advise spraying the stain with a chlorine-based cleaner. The stain may lighten, but it leaves salts behind which, according to people's experience, draw in moisture, and damp patches then appear on the wall. It is no substitute for sealing the stain.
Mould painted over
Mould under stain block keeps growing and comes back, often over a larger area.
One thick coat
A thick coat takes a long time to dry, runs on the ceiling and, with a solvent-based product, smells for longer. Two thinner coats are better.
How to check the finished work
- once dry, look at the ceiling and walls in daylight from the side and also with the lights on,
- no yellow or brown edge must be visible where the stain was,
- the whole surface has an even shade and sheen, and the treated area does not stand out,
- there are no bubbles, runs or peeling areas on the surface,
- after a few weeks, especially once the room has been heated, the stain has not come back,
- after airing, no solvent smell remains in the room.
If the stain comes back, it almost always means the surface was not dry or water is still leaking somewhere. In that case, find the cause first and only then repaint.
DIY guide: what to watch out for
A handy amateur can manage one or two stains. For a whole ceiling in a smoker's flat or after a major flood, it is better to call a decorator. The key points for a DIYer are:
- Only start when the area is completely dry and the leak has been repaired.
- Scrape off anything that is peeling and dust off the stain. Wash greasy and yellowed areas and let them dry.
- With a solvent-based product or spray, open the windows, do not smoke and have no naked flame or gas appliance running in the room.
- Coat the stain with an overlap of several centimetres and leave it to dry as stated on the tin.
- If the stain still shows through, apply a second coat.
- Finally repaint the whole ceiling or the whole wall, not just the treated area.
When working overhead, wear goggles and gloves, and with solvent-based products also a respirator with an organic vapour filter.
Frequently asked questions
The guide price for labour in the price list is €3.80 per m², excluding materials. In practice a small stain is often charged as a full m². On top of that comes repainting the whole surface and, depending on the condition, scraping off old paint.
Usually not. Ordinary emulsion dissolves the stain again and it reappears once dry, often even after the third coat. Stain block comes first, then ordinary paint.
Until the area is completely dry. For a small stain this is usually a few days, after a flooded ceiling it can be several weeks. If you are not sure, a moisture meter or a decorator who measures the moisture will help.
For a single smaller stain, yes, it is a quick fix. Most sprays are solvent-based, so they are flammable and the room must be ventilated. For large areas, a brush or roller with stain block paint is cheaper and gives a more even finish.
For an ordinary water stain, one coat of a solvent-based product or one to two coats of water-based stain block paint is often enough. Rusty stains from heating water, soot and heavy nicotine usually need two.
No. Mould has to be removed and treated, and the damp has to be dealt with. Stain block is for dry stains, not for active mould.
Usually insurance. You can report the damage to your own insurer under your home contents or buildings policy, which can then recover it from the neighbour, or claim under the neighbour's liability insurance. If the water came from the building's shared pipework, it is handled through the managing agent. Photograph the stains before the repair.
Not the whole room, but the whole ceiling or the whole wall where the stain was, yes. Otherwise the treated area will show as a different white.
Related work
How walls get two coats of white paint, which paint to choose, what makes the job harder and how to check that the finish is even.
How coloured wall painting is done, which paint to choose, what makes the job harder and how to check the result. Practical advice for flats and houses.
How a cast iron radiator is repainted, which paint to choose, what makes the job harder and how to check the finished coat.
How vertical heating pipes are painted, which paint to choose, what makes the job harder and how to check the finished coat.
How wallpapering is done, which type of wallpaper to choose, how to prepare the wall and how to check the finished job.
How much do painting and decorating works cost per m² in 2026? Live labour rates for walls, ceilings, preparation and a 60 m² flat example.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.