Building work price list: Wall Skimming
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Preparation | ||||
| Skimming walls | m² | €6.50 / m² | m² | enter quantity- |
| Scraping off old oil-based paint | m² | €5.40 / m² | m² | enter quantity- |
| Crack bridging and repair of large cracks | lm | lm | - | |
| Acrylic sealing of joints | lm | €1.90 / lm | lm | enter quantity- |
| Priming walls and ceilings | m² | €1.00 / m² | m² | enter quantity- |
| Scraping off old (water-based) paint | m² | €3.50 / m² | m² | enter quantity- |
| Local crack repairs and patching | pcs | €3.50 / pcs | pcs | enter quantity- |
| Skimming ceilings | m² | €7.50 / m² | m² | enter quantity- |
| Venetian plaster - polished finish | m² | m² | - | |
| Fitting corner beads | lm | lm | - | |
| Removing old wallpaper | m² | €3.50 / m² | m² | enter quantity- |
How skimming is done
The process is much the same for walls and ceilings. Quality depends mostly on patience between the steps.
Preparing the surface
The surface must be clean, sound and dry. Dust, grease, flaking old paint and loose plaster come off first. Larger holes and cracks are filled before skimming. Then a primer or bonding agent goes on, as recommended by the skim manufacturer. It evens out how much water the wall absorbs and helps the skim stick.
Applying thin coats
The skim is spread with a stainless steel trowel, usually in two coats. The first evens out the surface and covers defects, the second creates the final smooth finish. Each coat is usually about 1 to 3 mm thick; the exact figure is on the bag or tub. Depending on the product, the second coat goes on once the first has firmed up or fully dried, so follow the manufacturer's instructions.
Sanding and final priming
Filler-type skims are sanded once dry with a fine mesh or paper, typically around 120 to 180 grit. This removes trowel marks and small ridges. Traditional gypsum finishing plaster, common in the UK, is usually polished with the trowel as it sets and needs little or no sanding. Either way, the surface is then dusted off and primed or mist-coated so the paint dries evenly without patches.
Walls and ceilings: what is different
On a wall you see your work right in front of you and stand upright. Ceilings are harder for several reasons:
- Working overhead is tiring and it is harder to keep even pressure on the trowel
- A thick coat can sag or drop under its own weight, so thinner coats are used
- Sanding dust falls straight onto you, so dust extraction and a mask are essential
- Ceilings are often seen in low-angle light from the window, which shows every ripple
On a plasterboard ceiling the joints come first: tape goes into the joint compound, gets covered with another layer and is sanded once dry. Screw heads are filled too. Only then does the full skim go on. On concrete ceilings, the usual tasks are filling formwork marks, pores and the steps between precast panels.
Which skim to choose
Gypsum-based skim
The usual choice for dry living spaces such as living rooms, bedrooms, hallways and kitchens. It spreads easily, dries fairly quickly and finishes smooth. It is not suitable for damp areas such as bathrooms or cellars.
Cement-based skim
Harder and more tolerant of moisture, so it is used in bathrooms, utility rooms and plant rooms. It takes longer to dry and is harder to sand, so it needs to be applied accurately from the start.
Ready-mixed skims
These come as a paste in a tub and need no mixing. They suit small repairs, details and a fine final coat. For levelling large, uneven areas they are less suitable.
What makes the job easier or harder
How much work is involved, and therefore the final cost, depends mainly on the state of the surface. A flat, sound wall often needs just one skim and a light sand. The work grows with:
- Uneven, cracked or greasy walls that need more coats and more preparation
- Several layers of old paint that have to come off first
- Lots of corners, window reveals, alcoves and cable chases
- High ceilings, stairwells and galleries that need scaffolding
- Cement-based skim, which is slower to work and harder to sand
- A furnished room that has to be cleared and well protected from dust
Typical mistakes
- Skipping the primer. An absorbent surface draws water out of the skim, which then bonds poorly, cracks or flakes
- Coats that are too thick. They crack as they dry and may drop from a ceiling. Several thin coats work better
- Not enough drying time. A new coat on a damp one can ripple or come away
- Poor conditions. Draughts, cold or high humidity cause uneven drying and fine cracks
- Sanding without checking in the light. Flaws often appear only after painting. A work lamp held close to the wall at a low angle shows them early
- Working without protection. Fine gypsum dust irritates the lungs and eyes, so wear a dust mask and goggles, and ideally use a sander with extraction
DIY guide: skimming a wall in a dry room
You can manage a small wall in a living space yourself if you have patience. Ceilings, high rooms and large areas are better left to an experienced decorator or plasterer.
- Clear the room and cover the floor and furniture with dust sheets. Switch off the circuit at the consumer unit before loosening socket and switch faceplates.
- Remove dust, grease and loose plaster.
- Fill larger holes and cracks and let them dry.
- Apply primer following the manufacturer's instructions.
- Mix the gypsum skim as described on the bag, only as much as you can use before it starts to set.
- Apply a thin first coat with the trowel and level the worst unevenness.
- Let it dry or firm up as the manufacturer advises, then apply the second, final coat.
- Once dry, sand with fine mesh wearing a mask and goggles.
- Check the surface with a lamp held at a low angle and fill any small dents.
- Vacuum off the dust and apply the final primer or mist coat.
If you live in a block of flats, check the house rules or ask the building management or owners' association when noisy and dusty work is allowed.
How to check the finished work
Before painting, look at the surface in low-angle light and run your hand over it. When accepting the work, check that:
- The surface is smooth, with no trowel marks or sanding scratches
- Plasterboard joints and screw heads are not visible
- No ripples or dents show in side light
- The skim is not cracking and does not sound hollow when tapped
- Corners and edges are straight and clean
- The surface is free of dust and has been primed
- The room is tidy and surrounding surfaces are clean
Frequently asked questions
Not always. But if you want a perfectly smooth base for paint or wallpaper, new backing plaster often has small irregularities and uneven absorbency. A skim coat evens these out so the paint looks uniform.
It depends on the type of skim, the thickness of the coats, and the temperature and humidity in the room. Gypsum skims dry faster than cement-based ones. Paint only once the skim is fully dry, sanded where needed and the primer has dried. The manufacturer gives exact times.
You work overhead, coats have to be thinner so they do not drop, and sanding is dustier. A ceiling is also a large surface where light from the window picks out every flaw.
Gypsum skims are not suitable for damp rooms. Bathrooms need a cement-based or moisture-resistant product, and around the shower and bath a waterproofing layer belongs under the tiles.
On a very flat surface it sometimes is. In most cases two coats are applied, a levelling coat and a finishing coat, because that is what produces a truly smooth surface.
Related work
How to recognise old distemper, why it must come off before repainting and how to scrape it without damaging the plaster. Steps, mistakes and checks.
How old oil paint is removed from walls, when sanding is enough, when to use a chemical stripper and how to prepare the wall for new paint.
When walls, ceilings or floors need priming, which primer to choose and how to apply it properly. The main types and the mistakes to avoid.
How a ceiling is skimmed step by step, which compounds suit concrete, plaster or plasterboard, how long it takes to dry and how to check the work.
How Venetian plaster is applied, what base it needs, where it suits, common polishing mistakes and how to check the finished wall.
How cracks in walls, ceilings and plasterboard are taped and filled, which tapes and fillers to use, and how to check that the repair will last.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.