Building work price list: Building a Chimney with Fireclay Bricks and Ceramic Liner
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Masonry cost | ||||
| Chimney construction (chamotte + ceramic liner) | lm | €55.00 / lm | lm | enter quantity- |
| Partition walling up to 12.5 cm (brick/Ytong) | m² | €19.00 / m² | m² | enter quantity- |
| Walling up to 30 cm (Porotherm, Ytong) | m² | €25.00 / m² | m² | enter quantity- |
| Wall and floor primer application | m² | €1.90 / m² | m² | enter quantity- |
| Mesh reinforcement for internal blockwork | m² | €11.50 / m² | m² | enter quantity- |
| Wall repairs (Rimano, Rotband) | m² | m² | - | |
| Wall plastering (base coat) | m² | m² | - | |
| Fine lime-cement render (Feinputz) | m² | €9.50 / m² | m² | enter quantity- |
| Stucco render | m² | €9.50 / m² | m² | enter quantity- |
| Machine-applied renders (lime-cement) | m² | m² | - | |
| Gypsum / skim plaster | m² | €12.00 / m² | m² | enter quantity- |
| External renders | m² | €15.50 / m² | m² | enter quantity- |
| Lintel installation | pcs | €25.00 / pcs | pcs | enter quantity- |
| Block up openings | m² | €25.00 / m² | m² | enter quantity- |
| Schiedel-type chimney construction | lm | lm | - | |
When a house needs a new masonry chimney
A new chimney is most often built as part of a new house, to replace an old chimney that is falling apart, or when a wood burner, stove, open fire or new boiler is added. It is a typical part of masonry work. A well-built chimney lasts for decades. A poorly built one causes draught and damp problems and, in the worst case, a chimney fire.
The price is calculated per running metre, measured from the base of the chimney to the capping. A chimney in a single-storey house with a pitched roof may be around 6 to 8 m tall, and more in a two-storey house. The height is set by the design and the draught calculation, not only by where the chimney passes through the roof.
Fireclay liner and outer wall - what is what
A chimney has several layers. On the inside is the flue liner that carries the flue gases. Around it is insulation, and on the outside a load-bearing outer wall. When people talk about a "fireclay chimney", they usually mean the fireclay ceramic flue liner.
Fireclay is fired, heat-resistant clay. It withstands high temperatures, repeated heating and cooling, and aggressive substances in the flue gases. According to manufacturers, it usually tolerates considerably higher temperatures than those produced by normal domestic heating. Firebricks are used where masonry comes into contact with direct flame or very hot gases, for example in the firebox of a fireplace.
A ceramic liner has a smooth surface, so less soot and tar builds up on it. The chimney is easier to sweep and the risk of a soot fire is lower. The liner also protects the surrounding masonry from the acids and condensate produced during combustion.
The outer wall is built from solid fired clay bricks or assembled from concrete chimney blocks. It carries the weight of the chimney and protects the liner from damage and weather.
A fireclay liner is suitable for solid fuel boilers and stoves, for open fires and for many gas appliances. With condensing boilers, always check whether the liner is rated for wet operation. A different system is often chosen for them, such as a stainless steel or plastic flue, as required by the boiler manufacturer.
What needs to be decided before the bricklayer starts
A chimney is a safety element of the house, so it should be built by a bricklayer with experience of chimneys. A finished chimney is very difficult to alter, so most decisions must be made before the first brick is laid.
- Approval: a new chimney or a significant alteration to an existing one normally falls under building regulations. In England and Wales, any solid fuel installation must be notified to Local Authority Building Control, either via a Competent Person Scheme such as HETAS or directly to the council, and a new liner fitted together with a heating appliance also counts as controlled work. Check with your local building control body in advance what approval is needed, and whether planning permission is also required, for example for a listed building or in a conservation area. In a block of flats, the consent of the freeholder or managing agent is also needed.
- Appliance and fuel: have the boiler, stove or fire chosen, at least its type and output. The diameter and type of liner and the height of the flue pipe connection depend on it.
- Chimney position: a chimney close to the ridge has better draught conditions and a shorter section exposed to the weather. At the same time it must not clash with the roof timbers.
- Specialist advice early: it is sensible to discuss the design with a chimney specialist or the appliance installer before construction. The chimney will need to be checked and tested before it is put into use.
How the chimney is built step by step
- Preparing the foundation. A chimney is heavy, so it needs a firm, level foundation or a load-bearing slab that can carry its weight. A chimney is not built on an old floor without a structural engineer's assessment.
- Base of the chimney. First the base is set with a condensate trap and drain, and above it a soot door. The chimney is later swept and inspected through this door.
- Installing the ceramic liner. The liner sections are stacked one on top of another and the joints are sealed with acid-resistant sealant according to the manufacturer's instructions. The liner must be plumb and the joints clean, with no sealant squeezed out on the inside.
- Insulation and expansion gap. A gap is left between the liner and the outer wall, usually filled with mineral wool insulation. The liner expands when heated, so it must never be bonded rigidly into the outer wall.
- Building the outer wall. The outer wall is built around the liner from solid fired bricks, or chimney blocks are laid in the mortar specified by the manufacturer. The bricklayer checks plumb continuously with a spirit level or plumb line.
- Flue pipe connection. The inlet for connecting the appliance is fitted at the correct height. Its position must match the boiler or stove.
- Passing through the ceiling and roof. The clearance from timber and other combustible materials set by the applicable standards and the manufacturer is maintained around the chimney. Where it passes through the roof, the stack is flashed so that water cannot run under the roof covering.
- Chimney stack above the roof. Above the roof the stack is protected from rain and frost, for example with facing bricks, cladding or a suitable render. A capping slab is fitted on top to shed water away from the masonry.
- Drying and inspection. The mortar and sealant must dry. The chimney is then checked and tested, and the appliance is connected only once this has been done and signed off.
System chimney or brick-built, single or twin flue
- A brick outer wall of solid fired bricks suits locations where the chimney has to be adapted to an unusual position or tied into existing masonry.
- A block system chimney with a ceramic liner and insulation is quicker to build and all parts fit together precisely. The principle of the multi-layer construction is the same.
- Single or twin flue: if you may add a fireplace or a second boiler later, it is sensible to build the chimney with two flues from the start. Adding one afterwards is much more difficult.
- The liner diameter is not a matter of guesswork. It must suit the appliance, the fuel and the chimney height.
Chimney price per metre: what it depends on
The guide price for the labour is €55.00 per running metre. This applies to a standard single-flue chimney in an accessible location. The actual amount is affected by the following:
- Chimney height and the section above the roof: each extra metre means more material and more labour. The section above the roof adds most to the cost, because scaffolding and fall protection are needed and the work is slower. A metre above the roof is usually considerably more labour-intensive than a metre indoors.
- New build or existing house: in a new build the chimney goes up with the house before the roof is finished, which is the simplest option. Passing through a finished roof structure and roof covering that has to be stripped and made good again adds noticeably to the work.
- Demolishing the old chimney: taking down the old stack and removing the rubble is a separate job, and further repairs to the ceiling or roof are often found along the way.
- Access and space: in a cramped space where material has to be carried by hand up stairs or through the loft, the work takes longer and costs more.
- Number of flues: two flues do not mean double the price, but there is clearly more material and labour.
- Extras: additional inlets, ventilation grilles, more soot doors.
- Finish of the stack above the roof: facing brickwork or cladding is more labour-intensive than render.
- System and material: building with individual bricks is slower than assembling system blocks, and a larger liner diameter costs more.
When comparing quotes, check whether the price includes materials, scaffolding, flashing, the capping slab and rubble removal, or only the bricklaying itself. Inspection and testing of the chimney are usually charged separately.
What makes the work easier and what slows it down
- It helps to have the appliance chosen with its technical data, the design finished and the approval sorted before the bricklayer arrives.
- It helps to schedule the carpenter and roofer so that their work follows on. If the roofer comes weeks later, the chimney is open to the rain in the meantime.
- It helps to have clear, firm ground around the house for scaffolding and a place to store material close to the chimney, protected from rain.
- It slows the work when there is frost or rain. Bricklaying should generally be done at temperatures above +5 °C, and fresh masonry must be protected from frost and water. The stack above the roof is not built in strong wind.
- It slows the work when the appliance or the inlet position changes during construction. The inlet is built in as the work progresses, and moving it later means taking masonry apart.
- It slows the work when waiting for materials. System parts, liners and capping slabs are not always in stock, so it pays to order them in advance.
- It helps to plan adjoining work in advance. Where the chimney sits next to new internal walls, such as partitions up to 12.5 cm thick, the junction and clearances should be agreed before either is built.
Typical mistakes and how they show up later
Liner bonded rigidly into the masonry
The liner expands when heated and, without an expansion gap, the outer wall cracks. Cracks appear within the first heating seasons.
Wrong sealant or mortar
Ordinary mortar in the liner joints breaks down over time due to acids. The joints leak and brown tar stains appear on the outer wall.
Sealant squeezed out inside the liner
Soot catches on the lumps, the chimney is harder to sweep and the flue becomes narrower.
Insufficient clearance from timber
Roof timbers right up against the chimney are a serious fire risk. Timber next to a chimney dries out over the years and can ignite during a soot fire.
Wrong liner diameter
A flue that is too wide has a weak draught, the gases cool, condense and the chimney becomes damp. A flue that is too narrow cannot remove the gases and smoke comes back into the room.
No protection for the chimney stack
Water absorbed by the masonry freezes in winter and the masonry breaks up. This shows as spalling bricks and stains in the loft.
Poorly flashed roof penetration
Leaks around the chimney are one of the most common complaints. Water often appears far from the chimney, so the cause is hard to trace.
Chimney outlet at the wrong height
The required outlet height above the roof is not the same everywhere. It depends on how far the chimney is from the ridge and on the roof pitch, so the outlet does not always have to be above the ridge. If the outlet is lower than the applicable rules require, wind spoils the draught and flue gases blow back. The height should be set in the design and checked by a chimney specialist.
Lighting the first fire too early or too hot
Damp masonry heats up unevenly and can crack. Plastered or rendered surfaces on the chimney breast also crack more easily if they were not reinforced - see mesh reinforcement for masonry.
How to check the finished chimney
Before the first fire, the chimney must be checked and tested by a competent person, and the result documented. For gas appliances, the connection must be made by a Gas Safe registered engineer, so check the back of their ID card to see which work they are qualified for. If you smell gas, call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). Do not put the appliance into use without this. At handover, check:
- that the chimney is plumb and free of cracks in the outer wall,
- that the soot door and condensate trap are accessible and sealed,
- that the condensate has somewhere to drain,
- that the flue pipe inlet matches the height of the appliance being connected,
- that the clearance from combustible materials in the ceiling and roof structure is maintained,
- that the roof penetration is properly flashed,
- that the chimney stack has a capping slab and a protected surface, for example a cement-lime render or facing brickwork,
- that the liner is suitable for the appliance you will connect to it,
- that you have received the inspection and test record and documents for the materials used.
Frequently asked questions
As a guide, €55.00 per running metre. The final price depends mainly on the total height, how many metres are above the roof, the number of flues, access, demolition of an old chimney and the finish of the chimney stack.
Only if the liner is rated for wet operation and the boiler manufacturer permits it. A stainless steel or plastic flue is often chosen for condensing boilers, so take advice from a chimney specialist or heating engineer before construction.
The exact period is given in the instructions of the liner or chimney system manufacturer. Mortars normally take around four weeks to reach full strength, and longer in cold, damp weather. The first fire should be gentle so that the masonry warms up gradually.
It depends on the fuel and the appliance. Chimneys used with solid fuel are swept more often than those used with gas. HETAS recommends having the chimney swept at least twice a year when burning wood and at least once a year when burning smokeless fuels. There is no statutory chimney inspection regime, so a chimney sweep will advise on the exact intervals for your appliance.
It depends on the scope of the work and whether the chimney is part of a new build or a later alteration. A new chimney normally has to meet building regulations, so always check with your local building control body, and in a block of flats also with the freeholder or managing agent.
Not always. The required outlet height depends on the distance of the chimney from the ridge and on the roof pitch. A chimney close to the ridge usually rises above it, while a chimney further from the ridge is assessed differently. The specific height is set in the design and checked by a chimney specialist.
This is not recommended. It is a safety-critical structure involving work at height and on the roof, and the chimney must be checked and tested before use. Mistakes often only show after years and are difficult to put right.
Related work
How thin partitions are built from brick or aerated concrete blocks, which material to choose, what to watch out for and how to check the finished wall.
How mesh reinforcement of masonry partitions is done, when it makes sense, which mistakes to avoid and how to check the finished wall.
How a cement-lime base coat is applied by hand or by machine, what makes the job easier or harder and how to check the finished wall.
How a Schiedel-type chimney with a ceramic liner is built, what makes the job harder, common mistakes and how to check the finished chimney.
When a gypsum patch is enough and when a wall needs heavy repair with lime-cement mortar. Method, common mistakes and checks.
How fine lime-cement render (Feinputz) is applied indoors and outdoors, which substrates suit it, common mistakes and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.