Building work price list: Constructing Partitions up to 12.5 cm Thick
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Masonry cost | ||||
| Partition walling up to 12.5 cm (brick/Ytong) | m² | €19.00 / m² | m² | enter quantity- |
| Walling up to 30 cm (Porotherm, Ytong) | m² | €25.00 / m² | m² | enter quantity- |
| Wall and floor primer application | m² | €1.90 / m² | m² | enter quantity- |
| Mesh reinforcement for internal blockwork | m² | €11.50 / m² | m² | enter quantity- |
| Wall repairs (Rimano, Rotband) | m² | m² | - | |
| Wall plastering (base coat) | m² | m² | - | |
| Fine lime-cement render (Feinputz) | m² | €9.50 / m² | m² | enter quantity- |
| Stucco render | m² | €9.50 / m² | m² | enter quantity- |
| Machine-applied renders (lime-cement) | m² | m² | - | |
| Gypsum / skim plaster | m² | €12.00 / m² | m² | enter quantity- |
| External renders | m² | €15.50 / m² | m² | enter quantity- |
| Lintel installation | pcs | €25.00 / pcs | pcs | enter quantity- |
| Block up openings | m² | €25.00 / m² | m² | enter quantity- |
| Chimney construction (chamotte + ceramic liner) | lm | lm | - | |
| Schiedel-type chimney construction | lm | lm | - | |
What a partition up to 12.5 cm is and when it is needed
A partition up to 12.5 cm thick is a thin internal wall that carries no load and only divides space. It is used to create new rooms in an open loft, a walk-in wardrobe, a separate WC next to a bathroom, or to split a large living room in an older flat. It is most often built from aircrete blocks or clay partition blocks. It is one of the most common jobs within masonry work.
Although the wall is simple, its quality depends on accuracy: a level first course, a sound connection to the surrounding walls and the correct detail at the ceiling. Mistakes made during building show up later as cracks, doors that do not close properly, or a wall that needs a thick coat of plaster.
What to decide before building starts
A partition can be built in a day or two, but changes after it is finished mean cutting out and making good. It pays to settle a few points in advance.
- Exact position and room sizes: the thickness of the partition plus plaster on both sides takes space from the room. In a wardrobe or WC every centimetre counts.
- Doors: where they will be, which way they will open and what type of frame will be used. A steel door frame is often built in as the wall goes up, while a timber door lining is fitted into the finished opening. This determines the width and height of the opening.
- Partition thickness: a 10 cm block is commonly used for walls up to about 3 m high and of shorter length, for example for a wardrobe or store room. A 12.5 cm block can take a somewhat taller and longer wall, more door openings and is easier to chase for services. For a long wall with no return to another wall, or for higher ceilings, the manufacturer may require a stiffening post or a thicker block. The exact limits for each fixing method are given in the manufacturer's tables.
- Services in the wall: sockets, switches and possibly waste and water pipes in a bathroom. Chasing a thin partition is difficult and weakens it. If water or waste pipes are to run in the wall, a thicker option is more sensible.
- What will hang on the wall: kitchen units, a water heater, a television or shelves. The material and thickness should be chosen accordingly.
- What the partition will stand on: in new builds, partitions are usually built on the structural slab or floor slab before the screed is laid. A floating screed on insulation is not a suitable base for a masonry wall. If the partition would have to stand on one, this should be discussed with a specialist first.
- Acoustic and fire requirements: stricter requirements apply to walls between flats or walls next to a corridor or staircase. A thin partition is normally not enough for such a wall and its make-up should be specified by a designer.
- Nearby chimney works: if a new flue is planned close to the partition, for example during the installation of a Schiedel chimney system with ceramic liner, the layout should be agreed with the chimney installer before building starts.
Aircrete, clay or gypsum: what to build the partition from
All three materials are suitable for an ordinary partition, and each has different strengths.
- Aircrete blocks are light, can be cut with a handsaw and are easy to chase for electrical work. The wall goes up quickly and is very flat, so a thin coat of plaster or a skim is enough. The weaker points are lower sound insulation and less strength when hanging heavy items, which need fixings designed for aircrete.
- Clay partition blocks are heavier and therefore reduce noise better. They suit, for example, a wall between a bedroom and a living room. They also hold kitchen units or a water heater better. The work is a little slower and, when laid in mortar, a thicker plaster coat should be expected. As a wall between two flats, however, a partition up to 12.5 cm will not normally meet sound insulation requirements.
- Gypsum partition blocks are also bonded with adhesive and give a smooth surface. Only moisture-resistant types should be used in wet rooms.
In practice aircrete is often chosen even where clay would perform better acoustically, because it is lighter, which helps with older floors, and quick to work with. If quiet is important, ask about a thicker or heavier partition.
Approvals, structure and working in a block of flats
A non-loadbearing partition does not affect the structure, but it is still a building alteration. Whether building regulations approval is needed depends on the specific case, for example on fire escape routes or on creating new rooms in a loft. Before work starts, check with the local authority building control service and do not rely on general advice. In Scotland, structural alterations, extensions and loft conversions need a building warrant from the council before work starts.
In a block of flats, inform the managing agent or freeholder in advance and check the lease, as it may require consent for alterations. Noise, removal of waste and any work affecting shared services should also be agreed. Take care in older houses with timber joist floors: a heavy clay partition can overload them, and it is advisable to have the floor assessed by a structural engineer. In homes built before 2000, have suspect materials tested before you drill or demolish; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor. New electrical circuits in the partition must be connected only by a qualified electrician. A new circuit is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. If the work also involves removing or altering a loadbearing wall, it is no longer a routine job and needs a structural engineer, the relevant approvals and a specialist contractor.
How a partition is built step by step
The method is similar for clay and aircrete; the main difference is how the units are bonded. Aircrete is laid with thin-joint adhesive, with joints usually up to 3 mm. Standard clay blocks are laid in mortar with joints of about 1 cm, and ground (precision) clay blocks are laid in adhesive or foam as specified by the manufacturer.
- Setting out: the line of the partition is marked on the floor, walls and ceiling, including door openings, using a laser or a string line.
- Preparing the base: the base is checked and cleaned of dust and remains of old layers. In a bathroom or on a ground floor concrete slab, a damp-proof course is laid under the first course.
- First course: the blocks are bedded in levelling mortar and carefully levelled in both directions. Errors in the first course cannot be corrected later. Work continues only once the mortar has hardened according to the manufacturer's instructions.
- Further courses: these are laid in bond, with the vertical joints staggered by at least one third of the block length. For aircrete, adhesive is applied with a notched trowel to both the bed and the perpend faces.
- Tying in to existing walls: stainless steel flat wall ties are set into the bed joints at existing walls, usually every second or third course.
- Door opening: as agreed, a steel door frame is built in or an opening is left for later fitting. A lintel is placed over the opening with adequate bearing on both sides, according to the manufacturer's instructions.
- Head detail at the ceiling: a gap of about 1 to 2 cm is left between the top course and the ceiling. The ceiling deflects slightly under load and a flexible filling takes up this movement. Expanding foam is commonly used. Where the wall needs better sound reduction or a fire rating, mineral wool or fire-rated sealant is used as specified in the design.
- Levelling the surface: on aircrete, small steps between blocks are taken off with a rasp or sanding float.
- Preparing for plaster: reinforcing mesh is embedded at junctions between different materials and at the corners of door openings, as described in mesh reinforcement for masonry partitions. It greatly reduces the risk of hairline cracks appearing later.
What the price depends on
Partitions are priced per m² of wall area, that is length times height. The guide labour price is €19.00 per m². When comparing quotes, ask whether materials are included, whether door openings are deducted and whether fitting lintels and door frames is included. The final cost is affected by the following:
- Floor condition: an uneven or damaged floor that must be levelled first adds labour and materials. Larger irregularities are a separate item.
- Openings and wall shape: each door opening means cutting, a lintel and accurate setting. Corners, curves or a raking junction with a sloping loft ceiling are slower to build and noticeably raise the price per m², by several tens of per cent for complex shapes.
- Height: in taller rooms the work has to be done from scaffolding or a mobile platform, which slows it down.
- Material: aircrete is quicker to lay, clay blocks in mortar are slower. Clay also needs a thicker plaster coat, which shows up in a further item.
- Access: carrying materials to upper floors without a lift takes time and is often charged separately.
- Occupied home: covering furniture and floors and ongoing cleaning extend the work.
- Repairs to adjoining walls: if loose plaster must be repaired or an old wall made good before the new partition is tied in, this adds labour.
- Wet areas and special requirements: a damp-proof course under the first course, moisture-resistant material or fire-rated filling at the head increase the cost.
- Small jobs: for one short partition, preparation, travel and cleaning make up a large share of the price, so the rate per m² is higher than for a larger area.
The quickest and cheapest job is a straight partition with no openings in an empty room with a level floor.
How to prepare the site so the work goes quickly
- the room is cleared and there is free access to the partition line, including for materials,
- the position of the partition and doors is clearly agreed, ideally drawn on a dimensioned plan,
- the door frame has been bought and is on site, if it is to be built in,
- it is agreed who supplies the materials and when they arrive, so the bricklayer is not left waiting for a delivery,
- water and electricity are available on site for mixing and cutting,
- in a block of flats, waste removal and, where needed, use of the lift are arranged; before handing over rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note,
- the room is free of frost. Adhesives and mortars are generally used at temperatures of at least around 5 °C; the exact figure is given by the manufacturer,
- the electrician and plumber know when the partition will be finished so they can follow on.
The work takes longer if the door position changes during building, if the door frame is missing or if the material has not yet been decided. When planning, allow time for the masonry to harden before chasing and plastering.
Typical mistakes and how they show later
First course not levelled. The wall twists, is not plumb and the door then does not sit properly in the frame. This can only be put right later with thick plaster or by rebuilding.
Partition built tight to the ceiling. When the ceiling deflects, it presses on the wall and the wall cracks, often diagonally or horizontally just below the ceiling.
Missing wall ties. A vertical crack appears in the corner by the old wall and keeps returning after redecorating.
Adhesive joints too thick on aircrete. They reduce strength and flatness, and the wall then needs more plaster.
Plastering without mesh where clay meets aircrete. A crack as straight as a ruler appears at the junction of the materials.
Electrical chases cut too deep or at an angle. They weaken the partition, cracks can appear along them, and on a thin wall the block can be damaged through its full thickness.
Short lintel bearing. Over time, cracks appear at the corners above the door opening.
No damp-proof course under the first course in a wet room. Moisture from the floor rises into the wall, the plaster near the floor darkens and flakes, and mould may appear.
A thin partition where a separating wall was needed. If a partition up to 12.5 cm is built between two flats or next to a common corridor, normal conversation can be heard through it, and fixing this later means an independent lining wall that takes space from the room.
DIY guide: an aircrete partition
A capable DIYer with time and a good spirit level can build a non-loadbearing aircrete partition. The method follows the steps above; the points below add what matters most to a DIYer. Leave electrical work to an electrician, consult a structural engineer if there is any doubt about the floor, and do not alter loadbearing walls or common parts of the building.
- Before buying materials, check with building control what the alteration requires and, in a flat, inform the managing agent or freeholder.
- Prepare tools: a long spirit level or laser, rubber mallet, notched trowel matching the block width, aircrete saw, rasp or sanding float, mixing paddle and a bucket for adhesive.
- Buy blocks with an allowance of about 5 to 10 % for cuts, and an adhesive designed for that type of block.
- Lay the first course slowly and check each block with the level. This is not the place to save time.
- Mix adhesive in small batches so it does not start to set before it is used.
- Brush the blocks before bonding, as adhesive holds poorly on a dusty surface.
- Check each course with a straightedge and level after laying, and sand off small steps before starting the next course.
Cutting and sanding aircrete produces fine dust, so it is sensible to wear a dust mask and safety glasses.
How to check the finished partition
- the wall is plumb and flat; check with a long straightedge in several places,
- vertical joints are staggered, not one above the other,
- at junctions with old walls, the wall ties are visible or recorded in photographs,
- there is a flexible gap at the ceiling with the agreed filling, not rigid infill,
- the door opening has the correct width and height for the planned frame,
- a built-in steel door frame is plumb, flush with the wall and not twisted,
- the lintel has sufficient bearing on both sides,
- in a wet room there is a damp-proof course under the first course,
- mesh is in place at material junctions before plastering, ready for the cement-lime base coat or other finish,
- the area is clean and waste removed, if this was part of the agreement.
Frequently asked questions
The guide price is €19.00 per m² of wall area. The final price depends on how level the floor is, the number of door openings, the room height, site access and whether materials are included.
Building an ordinary partition in a room usually takes one to two days. Aircrete laid in thin-joint adhesive can usually be plastered after a few days to about a week, once the masonry has dried. Clay blocks laid in conventional mortar generally need longer, in the order of two to four weeks. The exact time is given by the manufacturer of the adhesive, mortar and plaster.
10 cm is enough for shorter walls of normal height, for example for a wardrobe or store room. 12.5 cm is more stable for longer and taller walls and for walls with doors and services, and it reduces noise slightly better. Between a bedroom and a living room, heavier clay blocks or a thicker partition are better, or an independent plasterboard lining with insulation. Neither is sufficient for a wall between flats.
For a standard aircrete block with a face size of about 60 × 25 cm, roughly 6 to 7 blocks per m² are needed, plus an allowance for cuts. Adhesive consumption is stated by the manufacturer on the bag; for a thickness of 10 to 12.5 cm it is roughly a few kilograms per m².
Yes, if fixings designed for aircrete are used and their load capacity is respected. For very heavy items, clay blocks or a thicker block are more suitable.
With more recent concrete floors, usually not. With timber joist floors, a heavy clay partition in an older house, or an unusually long and tall wall, an assessment by a specialist is sensible.
On a solid, level concrete slab or old tiles bedded on concrete, usually yes. A masonry partition is not normally built on a floating screed on insulation or on a timber floor, because the base may settle beneath it. In such cases, a specialist should be consulted.
Related work
How mesh reinforcement of masonry partitions is done, when it makes sense, which mistakes to avoid and how to check the finished wall.
How a cement-lime base coat is applied by hand or by machine, what makes the job easier or harder and how to check the finished wall.
How a Schiedel-type chimney with a ceramic liner is built, what makes the job harder, common mistakes and how to check the finished chimney.
How a chimney is built with fireclay bricks and a ceramic liner, what makes the job harder, typical mistakes and how to check the finished chimney.
When a gypsum patch is enough and when a wall needs heavy repair with lime-cement mortar. Method, common mistakes and checks.
How fine lime-cement render (Feinputz) is applied indoors and outdoors, which substrates suit it, common mistakes and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.