Building work price list: Wall Repairs, Heavy-Duty Patching (Rimano, Rotband, MVR Uni)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Masonry cost | ||||
| Wall repairs (Rimano, Rotband) | m² | €8.90 / m² | m² | enter quantity- |
| Partition walling up to 12.5 cm (brick/Ytong) | m² | €19.00 / m² | m² | enter quantity- |
| Walling up to 30 cm (Porotherm, Ytong) | m² | €25.00 / m² | m² | enter quantity- |
| Wall and floor primer application | m² | €1.90 / m² | m² | enter quantity- |
| Mesh reinforcement for internal blockwork | m² | €11.50 / m² | m² | enter quantity- |
| Wall plastering (base coat) | m² | m² | - | |
| Fine lime-cement render (Feinputz) | m² | €9.50 / m² | m² | enter quantity- |
| Stucco render | m² | €9.50 / m² | m² | enter quantity- |
| Machine-applied renders (lime-cement) | m² | m² | - | |
| Gypsum / skim plaster | m² | €12.00 / m² | m² | enter quantity- |
| External renders | m² | €15.50 / m² | m² | enter quantity- |
| Lintel installation | pcs | €25.00 / pcs | pcs | enter quantity- |
| Block up openings | m² | €25.00 / m² | m² | enter quantity- |
| Chimney construction (chamotte + ceramic liner) | lm | lm | - | |
| Schiedel-type chimney construction | lm | lm | - | |
What wall patching is and when it is needed
Patching does not mean replastering the whole wall. Only the areas where plaster is missing, damaged or no longer bonded are repaired. The aim is a wall that can be painted, skimmed or tiled without the old damage showing through.
It is needed mainly:
- after removing old wall plugs, shelves, cabinets and brackets,
- after chasing walls for electrical cables or pipework,
- when plaster in an older property is falling off or sounds hollow when tapped,
- when holes, dents and cracks show under the paint,
- before skimming, painting or tiling, when the background is not continuous.
For small and medium interior repairs, gypsum plaster (for example Rimano or Rotband) is the usual choice. For heavy patching of larger and deeper areas, especially in damp conditions or on lime-cement plaster, a lime-cement mix (for example MVR Uni) is used. Patching is one part of the wider masonry work carried out during a renovation.
Standard or heavy-duty patching: what is the difference
The difference lies mainly in how large and deep the damage is and in what conditions the wall sits.
- Standard patching (Rimano, Rotband) covers smaller areas in dry rooms: holes from wall plugs, chipped corners, filled cable chases after the electrician, shallow dents. Gypsum plaster spreads well, sets quickly and can be trowelled smooth, so the wall is almost ready for skimming or paint.
- Heavy-duty patching (Rimano, MVR Uni) is needed when plaster has come away down to the masonry, or when a larger area or a thicker coat has to be built up. The work is done in several coats, often with holes first filled with mortar or pieces of brick.
Heavy patching in a dry room can also be done in gypsum, such as Rimano, provided the depth is within the thickness the manufacturer allows on the bag and the original plaster is gypsum. A lime-cement mix such as MVR Uni is the right choice when repairing lime-cement plaster, when the wall is in a damp area or outside, or when the hole is so deep that gypsum would need too many coats.
Height also affects the work. A patch near the floor is a different job from a repair just below the ceiling of a tall older room, where scaffolding or stable mobile platforms are needed.
Patching has its limits. If a large part of the wall is damaged, the plaster sounds hollow in many places or the whole wall is badly out of true, it is often more sensible to hack off the old plaster and apply a new coat, for example cement-lime render as a base coat. A continuous new layer is more even than a patchwork of dozens of repairs.
Gypsum or lime-cement: which to use when
The choice of material should not depend only on what happens to be on the shelf at the builders' merchant. The repair mix should be compatible with the original plaster and suit the conditions the wall is in.
- Gypsum plasters (Rimano, Rotband) are for interiors and dry rooms: living rooms, bedrooms, hallways. They can be applied in a fairly thick coat in one go, and the exact thickness is given on the bag. In dry rooms they can also take tiles with a suitable primer, for example behind kitchen units. They are not suitable outside, on damp masonry or where water hits the wall directly, such as around a shower.
- Lime-cement mixes (MVR Uni) are more resistant to moisture and can be used inside and out. They suit cellars, plant rooms, plinths, repairs to old lime and lime-cement plaster, and backgrounds for tiling in bathrooms and other wet areas. They dry more slowly, however, and thicker coats are built up gradually.
When combining materials, a simple rule applies: gypsum and cement-based mixes are never mixed in the same bucket, and a lime-cement coat is not applied over gypsum. Lime-cement plaster is repaired with a lime-cement mix. A common mistake is patching a damp cellar wall with gypsum, only for the repair to swell and fall off a few months later. If the original plaster type is unclear, ask a plasterer or carry out a small test in an inconspicuous spot.
What to decide before ordering the work
It pays to clarify a few points in advance. This avoids misunderstandings over the price and over how the wall should look after the repair.
- What finish will follow. Under tiles, a sound and flat repair is enough without a perfect finish. Under paint, the surface must be smooth or the patches will show. Under a skim coat, the wall must be flat, and the skim provides the smoothness.
- Whether damp has been dealt with. If the wall is damp or there is a leak, repairing the plaster is pointless until the cause is removed. Drying out and treating the masonry are separate jobs.
- How the area will be measured. The extent of patching is easy to misjudge. Ask whether the actual repaired area is charged, whether small patches are rounded up and how chases and corners are priced.
- Who makes good the chases after services. The electrician or plumber sometimes only roughly fills chases, and sometimes leaves them open. Agree whether the plasterer makes them good.
- Who removes the old plaster. Hacking off hollow areas and removing the rubble may be part of the job or a separate item. In homes built before 2000, have suspect materials tested before you drill or demolish; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
- Order of works. Patching comes after services in the walls are installed and before skimming and decorating. If more chasing follows, part of the work is done twice. Where new walls are being built, for example partitions up to 12.5 cm thick, plan the patching once they are finished.
In a block of flats, agree any work affecting common parts, the facade or load-bearing walls in advance with the managing agent or the freeholder. If the repair forms part of building alterations, check with the local authority's building control what applies in your case.
How patching is carried out step by step
- Protection. The floor, windows, door frames and nearby furniture are covered with dust sheets or polythene. When working around sockets and switches, the relevant circuit is switched off at the consumer unit.
- Assessing the wall. Tapping reveals where the plaster sounds hollow and is only weakly bonded. These areas are removed back to a sound background, otherwise the repair would come away with them.
- Cleaning. Dust, old paint residue, grease and loose particles are removed. Old wall plugs and nails are pulled out of the holes.
- Filling deep areas. Larger holes and pockets in the masonry are first filled with mortar or pieces of brick, so the plaster does not have to bridge a void.
- Priming. An absorbent background is stabilised and evened out with a primer. Smooth concrete usually needs a bonding agent, otherwise plaster will not adhere. The type of primer follows the plaster manufacturer's recommendations.
- Applying the mix. The mix is applied with a trowel or float and ruled off with a straightedge flush with the surrounding wall. For heavy patching, the work is done in coats, each applied only once the previous one has set.
- Corners and junctions. Damaged corners are reinforced with angle bead. At a junction of two different materials, such as brick and concrete, glass-fibre mesh is embedded in the plaster to reduce the risk of cracking - the same principle as mesh reinforcement for masonry partitions.
- Finishing and drying. Gypsum can be trowelled smooth once it has set. Lime-cement plaster needs longer. A rough guide is about one day per millimetre of thickness, but exact figures come from the manufacturer and depend on temperature and ventilation.
- Checking and clearing up. The repairs are checked with a straightedge and side lighting, and small pits are filled. Protective sheeting and rubble are removed.
What the price of patching depends on
The guide labour price is €8.90 per m². This applies to normal conditions. Two walls that look similar can still end up costing quite different amounts. The main factors are:
- Depth of damage. A shallow dent is filled in one coat. An area where plaster has come away down to the masonry needs holes filled, more coats and more material. Heavy patching is therefore noticeably more expensive per m² than standard patching.
- How scattered the repairs are. Many small patches across a wall take longer than one continuous area of the same size. Each patch must be cleaned, primed, filled and flushed in with its surroundings. For small repairs, some tradespeople therefore charge a minimum area or a day rate.
- Condition of the background. Weathered, crumbling or hollow plaster must be hacked off first. Hacking off, carrying out and disposing of rubble adds work that is not obvious at first sight.
- Corners, reveals and details. Corners, window reveals, arches and areas around door frames take longer than a flat surface, often with angle bead.
- Height and access. Work at ceiling level, in tall older rooms or on a staircase needs scaffolding or platforms and goes more slowly, so it usually costs more.
- Material. A lime-cement mix is applied in coats with breaks for setting, so the work spreads over several days and the tradesperson has to return. Gypsum is quicker.
- Required surface quality. A repair under tiles is simpler than one under paint, where the patch must be perfectly flush and smooth.
How to prepare for patching
Besides the condition of the wall itself, the way the site is prepared also affects the work.
- An empty room. With furniture removed or moved to the middle of the room, the tradesperson does not lose time covering and shifting it. In a furnished home the work takes longer and creates more dust.
- Services finished. If the electrician and plumber have not yet finished their chases, the plasterer has to come back twice.
- Water and power on site. The mix is made with clean water and the mixing paddle needs a socket. Without them the work slows down.
- Temperature and ventilation. Plasters are applied above freezing, usually above 5 °C, and the exact conditions are on the bag. In a cold, unventilated room the mix dries slowly and following trades are delayed. Draughts and direct sunlight, on the other hand, cause too rapid drying and cracking.
- Space for rubble. Agree in advance where waste can go and how it will be removed. Before you hand over renovation rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note. In a block of flats, check the building rules for noisy work and use of the lift.
- Clear marking of repairs. Marking everything that needs repairing in advance, for example with pencil or tape, ensures nothing is forgotten.
Typical mistakes and how they show later
Plaster on an unsound background
If a hollow old layer is left under the repair, the patch later cracks or falls off with it. This often only becomes visible after decorating.
Primer left out
Absorbent brick or aircrete draws water out of the plaster too quickly and the mix cannot set properly. The repair then dusts, crumbles or develops hairline cracks around it.
Smooth concrete without a bonding agent
The plaster does not adhere, sounds hollow when tapped and sometimes falls off in one piece.
Gypsum in a damp location
On damp masonry or where water gets in, gypsum swells, softens and falls off, often within a few months.
Lime-cement coat over gypsum
The materials do not work well together and the repair may delaminate or crack.
Too thick a coat in one go
Heavy patching applied in a single pass cracks or sags as it dries. Deep areas need several coats.
No mesh at material junctions
A crack appears exactly at the junction of brick and concrete, as straight as a ruler.
Painting over a wet patch
On a patch that has not dried, the paint discolours, leaves stains or peels.
Filling a structural crack
Diagonal cracks running from the corners of windows and doors, or cracks that reopen after repair, may be caused by movement in the structure. Such a crack should first be assessed by a structural engineer - plaster alone will not solve it.
How to check finished patching
Finished repairs are best checked with side lighting, for example a torch held flat against the wall. This shows every unevenness that paint would later reveal.
- repaired areas do not sound hollow when tapped,
- the patch is flush with the surrounding wall, with no step or hollow under a straightedge,
- the edges of repairs blend smoothly into the surroundings with no raised ridges,
- corners are straight and intact,
- there are no hairline cracks or bubbles in the repair,
- mesh is embedded at junctions of different materials,
- chases after services are made good along their full length and the areas around back boxes are clean,
- the material suits the conditions, with no gypsum in damp or exterior locations,
- floors, windows and door frames are free of plaster splashes and rubble has been removed, if agreed,
- the contractor has said when the wall can be skimmed or painted.
DIY guide: a small patch with gypsum plaster
Holes from wall plugs, small dents or a shallow chase in a dry room can be handled as a DIY job. For large areas, thick coats and work under a high ceiling, it is better to call a plasterer. New openings are never cut in load-bearing walls, and when working on chases near electrical cables the circuit must be switched off at the consumer unit.
- Remove wall plugs and nails, tap to find loose areas and remove them back to a sound background.
- Brush off the area, or use a vacuum cleaner.
- Apply primer as recommended by the plaster manufacturer and let it dry.
- Add only as much gypsum plaster to clean water as can be used before it starts to set.
- Press the mix into the hole and rule it off with a trowel or straightedge flush with the wall.
- For a deeper area, let the first coat set and apply a second.
- Once set, trowel the patch smooth, let it dry and only then skim or paint.
Wash tools and buckets straight after use. Bits of set gypsum in a fresh batch speed up setting and the mix cannot be worked in time.
Frequently asked questions
As a guide, €8.90 per m². The final price depends mainly on the depth of damage, the number of scattered patches, the working height, whether old plaster has to be hacked off and the choice between gypsum and a lime-cement mix.
A thin gypsum repair in a warm, ventilated room sometimes can, but thicker coats and lime-cement mixes cannot. The wall must be completely dry, otherwise the paint discolours or peels. Follow the manufacturer's drying times.
It is not suitable. Gypsum swells and loses strength in damp conditions. The cause of the damp must be dealt with first, and the repair made with a lime-cement or renovation plaster.
Almost always. Primer evens out the absorbency of the background and improves adhesion. Smooth concrete usually needs a bonding agent.
Either an unsound background was left under the repair, or the crack is caused by movement in the structure. In the second case, it is advisable to have the wall assessed by a structural engineer before repairing it again.
Smaller gypsum repairs are often done in a day, plus drying time. Heavy patching in several coats takes longer, because each coat needs to set.
Under tiles, usually not. Under paint, it depends on how well the repairs are flushed in. If there are many repairs or the wall will be seen in side lighting, a full skim coat evens out the surface so the patches do not show through the paint. Agree this in advance, as it is a separate job.
Related work
How thin partitions are built from brick or aerated concrete blocks, which material to choose, what to watch out for and how to check the finished wall.
How mesh reinforcement of masonry partitions is done, when it makes sense, which mistakes to avoid and how to check the finished wall.
How a cement-lime base coat is applied by hand or by machine, what makes the job easier or harder and how to check the finished wall.
How a Schiedel-type chimney with a ceramic liner is built, what makes the job harder, common mistakes and how to check the finished chimney.
How a chimney is built with fireclay bricks and a ceramic liner, what makes the job harder, typical mistakes and how to check the finished chimney.
How fine lime-cement render (Feinputz) is applied indoors and outdoors, which substrates suit it, common mistakes and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.