Building work price list: Fine Lime-Cement Render (Feinputz)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Masonry cost | ||||
| Fine lime-cement render (Feinputz) | m² | €9.50 / m² | m² | enter quantity- |
| Partition walling up to 12.5 cm (brick/Ytong) | m² | €19.00 / m² | m² | enter quantity- |
| Walling up to 30 cm (Porotherm, Ytong) | m² | €25.00 / m² | m² | enter quantity- |
| Wall and floor primer application | m² | €1.90 / m² | m² | enter quantity- |
| Mesh reinforcement for internal blockwork | m² | €11.50 / m² | m² | enter quantity- |
| Wall repairs (Rimano, Rotband) | m² | m² | - | |
| Wall plastering (base coat) | m² | m² | - | |
| Stucco render | m² | €9.50 / m² | m² | enter quantity- |
| Machine-applied renders (lime-cement) | m² | m² | - | |
| Gypsum / skim plaster | m² | €12.00 / m² | m² | enter quantity- |
| External renders | m² | €15.50 / m² | m² | enter quantity- |
| Lintel installation | pcs | €25.00 / pcs | pcs | enter quantity- |
| Block up openings | m² | €25.00 / m² | m² | enter quantity- |
| Chimney construction (chamotte + ceramic liner) | lm | lm | - | |
| Schiedel-type chimney construction | lm | lm | - | |
Fine finish render: what it is made of and when it is needed
A fine finish coat is most often applied in three situations. The first is a new build, once the base coat has cured. The second is a refurbishment, where an old, weathered finish coat is renewed. The third is an external wall that needs a background for masonry paint. The finish coat turns a coarser, grainy wall into an even surface ready for decoration. This article covers fine lime-cement render both indoors and outdoors. For the wider context, see the overview of masonry work.
The mix contains lime, cement and very fine sand. Lime makes the render flexible and vapour-permeable, so the wall can "breathe". Cement adds strength. The aggregate is fine, usually around half a millimetre. The coat is thin, typically a few millimetres depending on the manufacturer. Feinputz therefore does not level out large irregularities. That is the job of the base coat underneath.
Do not confuse the terms. In some contexts, "stucco" also refers to decorative cornices, ceiling roses and ornaments. That is separate specialist fibrous or solid plasterwork. This article is about a plain, fine finish coat over the whole surface of a wall or ceiling.
Internal fine render is used in living rooms, hallways and kitchens. It also suits bathrooms if they are well ventilated. The main requirements are a smooth, even appearance and good adhesion for paint.
External fine render has to withstand rain, frost and sun. Use only a mix that the manufacturer specifically states is suitable for external use. Work on an elevation is more demanding. It needs scaffolding and a close eye on the weather, and the details around windows, sills and the plinth must be dealt with properly.
What to decide before ordering the work
Many problems with fine render can be avoided when the job is agreed. It is worth being clear about the following points:
- Internal or external: the two use different mixes and different working conditions, and an elevation also needs scaffolding. The quote should state clearly which option is priced.
- Condition of the base coat: a fresh base coat must be left to cure first. On an old wall, agree who will hack off loose areas and repair cracks, and to what extent.
- Expected finish: fine render has a fine, slightly grainy texture. It is not a glass-smooth surface. If a completely smooth wall is wanted, say so in advance, because a skim coat is then added.
- Timing: the render needs several weeks to dry before it can be painted. If moving in is urgent, allow for this in the programme. For external work the season also matters, because rendering should not be done in frost or in hot weather.
- Paint for the finished render: vapour-permeable paints suit lime-cement render. Choose the paint in advance, so that a non-breathable coating does not cancel out the benefit of a breathable render.
- Surface tolerance: agree the flatness and appearance expected, for example a check with a long straightedge and side lighting. This gives a clear reference point at handover.
In a block of flats, discuss any work to the external walls with the managing agent, freeholder or residents' management company first. The external walls are usually a shared part of the building. If the appearance of the elevation is to change noticeably, check with the local planning authority whether permission is needed.
Suitable backgrounds and when extra preparation is needed
Feinputz belongs on mineral base coats, either lime-cement or lime. Brickwork with a base coat is the simplest case. Aerated concrete blocks are very absorbent, so a primer is essential. Where different materials meet, for example brick and a concrete ring beam, glass-fibre reinforcing mesh is embedded in the base coat to prevent a crack later. More on this is in the article on mesh reinforcement for masonry partitions. Smooth concrete needs a bonding primer first, otherwise the render will not adhere well.
Lime-cement finish render must not be applied over gypsum plaster. The materials are not compatible, the render adheres poorly to gypsum and can come away and fall off over time. If a wall is finished in gypsum plaster, use a skim product designed for gypsum backgrounds.
How the work is done step by step
- Checking the background: the base coat must be sound, dry, free of dust and fully cured. A rough rule of thumb is about one day per millimetre of base coat thickness. The exact time is given by the manufacturer.
- Protection and scaffolding: before the wall is prepared, windows, floors and services are covered. For external work, scaffolding is erected and secured. Hacking off and priming already create mess.
- Repairing old render: on an old wall, loose areas are hacked off and removed, old coatings and grease are cleaned off and cracks are repaired. In homes built before 2000, have suspect materials tested before you drill or demolish; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
- Damping down or priming: the background is damped down or primed, so that it does not draw water out of the fresh render too quickly.
- Mixing: the mix is prepared according to the instructions on the bag, always with the same amount of water per bag. This keeps the colour and texture of the surface consistent.
- Application: by hand, the mix is applied directly with a steel trowel in a thin coat. By machine, a rendering pump sprays it onto the wall and the plasterer immediately rules it off and spreads it with a trowel or straightedge into an even, thin coat.
- Finishing: once the surface has stiffened, it is rubbed up with a sponge or felt float to an even appearance.
- Curing: fresh render is protected from sun, draughts, frost and rain until it has cured. In warm, dry weather it is sometimes lightly misted so that it does not dry too fast.
Hand application suits smaller areas, older houses and areas with many corners and openings. Machine application is faster and more economical on large, flat areas in new builds. In both cases, the final finish is always done by hand.
Price of fine render per m² and what it depends on
The guide price for the work is €9.50 per m². The actual cost of a specific job may differ depending on these factors:
- Condition of the background: a flat, clean and cured base coat means quick work without extra charges for preparation. An old, friable or cracked surface means hacking off, repairs, priming and sometimes mesh. This can raise the cost significantly, by tens of per cent if the condition is very poor, and these steps are often charged as separate items.
- Size and shape of the area: a large flat wall is quicker than small rooms with many corners. On a small area the price per m² is usually higher, because preparation, mixing and cleaning up take almost as long as on a larger one.
- Height: ceilings and tall rooms need a mobile scaffold tower. Rendering a ceiling is more physically demanding and slower than a wall.
- Openings and edges: the number of windows, doors, reveals and corner beads. Reveals are slow work, so some tradespeople price them separately per running metre.
- Internal or external: an elevation adds scaffolding, protective netting, an external-grade mix and waiting for suitable weather. Scaffolding is often charged separately.
- Method of application: machine application on large flat areas is usually cheaper per m², while hand work in complex spaces takes more labour.
- Furnished property: if furniture and floors must be carefully covered and the rooms cleaned afterwards, the job takes longer.
When comparing quotes, check whether the price includes materials, primer, scaffolding and waste removal. Before you hand over renovation rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note. Also check how the area is measured, that is, whether windows and doors are deducted.
What makes the work easier and what slows it down
Much of the organisation is in the client's hands. It helps to:
- have all work that involves chasing walls finished, including electrics, plumbing and heating, with the chases made good, and any new walls such as partitions up to 12.5 cm thick completed and rendered,
- have the windows fitted, so ventilation can be controlled and the rooms gently heated in colder weather,
- provide water and power on site for the mixer or rendering pump,
- clear the rooms, or at least move furniture to the middle, so the walls can be reached,
- provide a dry place, protected from rain, to store the bags of mix,
- for an elevation, arrange access around the house and space for scaffolding, and in a block of flats obtain consent and inform the neighbours.
The work takes longer if there is a wait for a base coat that should have been finished earlier, if a reasonable temperature cannot be kept in the room, or if rain or frost interrupts work on an elevation. It also drags on when other trades work at the same time and damage the wall again.
Typical mistakes and how they show up later
Fine render on an uncured base coat. This is the most common mistake in practice. The base coat is still shrinking, and after a few weeks fine hairline cracks appear on the surface and show through the paint.
Drying too fast. Direct sun, draughts or heating turned up high straight after rendering. The cement does not cure properly and the surface dusts or cracks. The mix usually needs to be used at temperatures of roughly +5 to +25 °C. The exact values are given by the manufacturer.
No primer on an absorbent background. The background draws out the water, the render adheres poorly, cracks and may sound hollow when tapped.
Coat too thick or too thin. A thick coat cracks as it dries. A coat that is too thin does not cover the grain of the base coat, and irregularities show through, especially after painting and in side light.
Inconsistent amount of water in the mix. Individual batches differ in colour and texture, and the wall then looks patchy.
Painting too early. Damp patches appear on a wet wall, or the paint later peels off.
Rendering an elevation before rain or frost. Rain washes the binder out of fresh render and leaves marks, and frost damages the uncured coat. The damage shows as crumbling, staining and detachment, often only after the winter.
How to check the finished work
Inspect the wall in daylight and also with a lamp shining at a low angle along the surface. This reveals every undulation.
- the surface is uniform, without patches, scratches or clusters of grain,
- there are no cracks on the wall or in the corners,
- the surface does not dust or crumble when a hand is run over it,
- the render does not sound hollow when tapped,
- a long straightedge shows no noticeable hollows or waves beyond the agreed tolerance,
- corners and reveals are straight and sharp,
- junctions with ceilings, windows, doors and switches are clean,
- on external work, the details at sills and the plinth are properly finished,
- windows, floors and frames are free of render splashes.
Ask for the manufacturer and type of mix used to be recorded in the handover document, together with a snagging list of all defects to be put right and a date for the repairs. This is useful for any later complaint and when choosing paint.
DIY guide: fine render on a small internal wall
A small internal area, such as a repaired wall in one room, can be done as a DIY job with a little patience. Leave elevations and work at height to a plasterer or renderer with proper scaffolding. If larger repairs are needed first, a base coat such as cement-lime roughcast plaster has to be applied and cured before the finish coat.
- Clear the room and cover the floor and windows with polythene sheeting.
- Hack off loose areas and brush the dust off the wall.
- Fill larger holes and cracks with base coat render in advance and let it cure.
- Apply primer or dampen the wall evenly.
- Mix a small amount strictly according to the instructions.
- Apply a thin coat with a steel trowel, working from top to bottom.
- Wait until the surface stiffens, then rub it up with a sponge float in a circular motion.
- Close the windows to avoid draughts, keep the heating low and let the wall dry slowly.
- Paint only once the wall is completely dry.
Safety: lime and cement are corrosive when wet. Wear safety goggles, gloves and long sleeves while mixing and applying. If the mix gets into an eye, rinse it immediately with plenty of clean water for a long time and seek medical help, as there is a risk of serious eye damage. Wash any affected skin with water as soon as possible.
Frequently asked questions
The guide price for the work is €9.50 per m². The final cost depends mainly on the condition of the base coat, the height of the rooms, the number of windows and reveals, and whether it is internal work or an elevation with scaffolding.
In everyday use, yes. Both names refer to a fine finish coat over a base coat render. It is not decorative ornamental plasterwork, which is a specialist trade.
Yes, with good ventilation it is suitable for walls away from direct water. The render itself is not waterproof, so around a shower or bath the wall needs a tanking system and tiles.
Only once the render is completely dry, usually after several weeks depending on the thickness, temperature and ventilation.
No. Feinputz is thin, it does not fill joints or level differences between bricks, and once dry it would follow the outline of the masonry. A base coat is needed first, and the finish coat only after it has cured.
Usually not for ordinary paint, as fine render is a finished surface with a fine texture. A skim coat is added if a completely smooth wall without grain is wanted, for example under strong side lighting or under wallpaper.
It requires a mix designed for external use, work from scaffolding and only in suitable weather without rain, frost or strong sun. In addition, all details where water could get in must be dealt with properly.
Related work
How thin partitions are built from brick or aerated concrete blocks, which material to choose, what to watch out for and how to check the finished wall.
How mesh reinforcement of masonry partitions is done, when it makes sense, which mistakes to avoid and how to check the finished wall.
How a cement-lime base coat is applied by hand or by machine, what makes the job easier or harder and how to check the finished wall.
How a Schiedel-type chimney with a ceramic liner is built, what makes the job harder, common mistakes and how to check the finished chimney.
How a chimney is built with fireclay bricks and a ceramic liner, what makes the job harder, typical mistakes and how to check the finished chimney.
When a gypsum patch is enough and when a wall needs heavy repair with lime-cement mortar. Method, common mistakes and checks.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.