Price list 2026 · Europe

Masonry work: cost per m² 2026 and the process

Your 2026 guide to masonry work. Compare partitions, load-bearing walls and plastering, see what makes a well-built wall, and work out the labour cost from a live price list.

Updated 09/2026·15 min read·25 price list items
Standard labour price
€19.00/ m²
Indicative range
€15.20 - €24.70
Partition, 20 m²
€610.00
The rate shown is for labour building a partition up to 12.5 cm thick without rendering. Blocks, mortar, lintels and render mixes are priced separately.
Price my renovation
Updated prices
On this page
Short answer

Building a partition up to 12.5 cm thick from brick or aircrete blocks costs €19.00 per m² of labour, based on the current price list. A load-bearing wall up to 30 cm comes to €25.00 per m², a fine lime-cement render to €9.50 per m², and a gypsum skim finish to €9.50 per m². What you pay in the end depends mostly on how thick the wall is and what it's built from, how many openings and corners there are, and how much rendering you need. Blocks, mortar and render are priced separately.

Types of work and their prices

€19.00
per m²

A common non-load-bearing dividing structure built from brick or aircrete blocks. Needs a level substrate and precise setting out.

€25.00
per m²
Load-Bearing or External Wall

Building thicker walls with proper bonding and plumb checks. Load-bearing structures follow the project documentation.

€11.50
per m²

A reinforcing mesh on the surface of the masonry reduces the risk of cracking along the joints between blocks before rendering.

€9.50
per m²

A smooth surface layer ready for painting or tiling. Applied in a thin coat over a cured substrate.

€9.50
per m²
Gypsum Skim Finish

A fine-grained finishing layer that leaves a smooth, even surface, which is normally painted afterwards. Requires a skilled hand to trowel and the right humidity conditions.

€25.00
per pcs
Lintels Over Openings

The load-bearing element over a door or window opening. The lintel type and bearing length follow the structural calculation and the width of the opening.

Bricklaying work price list 2026

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Bricklaying and plastering25 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Masonry cost

Partition walling up to 12.5 cm (brick/Ytong)m²€19.00 / m²m²enter quantity-
Walling up to 30 cm (Porotherm, Ytong)m²€25.00 / m²m²enter quantity-
Wall and floor primer applicationm²€1.90 / m²m²enter quantity-
Mesh reinforcement for internal blockworkm²€11.50 / m²m²enter quantity-
Wall repairs (Rimano, Rotband)m²m²-
Wall plastering (base coat)m²m²-
Fine lime-cement render (Feinputz)m²€9.50 / m²m²enter quantity-
Stucco renderm²€9.50 / m²m²enter quantity-
Machine-applied renders (lime-cement)m²m²-
Gypsum / skim plasterm²€12.00 / m²m²enter quantity-
External rendersm²€15.50 / m²m²enter quantity-
Lintel installationpcs€25.00 / pcspcsenter quantity-
Block up openingsm²€25.00 / m²m²enter quantity-
Chimney construction (chamotte + ceramic liner)lmlm-
Schiedel-type chimney constructionlmlm-

Bricklaying and blocklaying cost

External wall construction up to 30 cm thickm²€25.00 / m²m²enter quantity-
Load-bearing external wall constructionm³€65.00 / m³m³enter quantity-
Non-load bearing external wall constructionm²€25.00 / m²m²enter quantity-

Renders and facades cost

Application of external scratch coatm²€12.00 / m²m²enter quantity-
Application of silicone facade renderm²€15.00 / m²m²enter quantity-
Facade insulation with EPSm²€25.00 / m²m²enter quantity-

Tiling and cladding cost

Plinth cladding with manufactured stonem²m²-
Exterior natural stone claddingm²m²-
Split stone wall cladding (fences, plinths)m²m²-

Other works

Other unspecified works in tradehrhr-
Total labour
- enter quantity
Create quote from price list →

How much it costs by scope

Indicative Labour Cost for a 20 m² Partition
Masonry Partition without Render
Building a 20 m² partition and applying mesh reinforcement to one side (20 m², openings not deducted) before rendering.
€610.00
Partition with Priming and Fine Render
Masonry over 20 m², plus mesh reinforcement, priming and fine lime-cement render on one side of the wall (20 m², openings not deducted).
€838.00
Partition with a Door Opening and Gypsum Skim Finish
Masonry over 20 m², mesh reinforcement, priming and gypsum skim finish on one side of the wall (20 m², openings not deducted), and fitting a lintel above a door opening.
€863.00
The model totals use live prices and the stated quantities. Finishing (mesh, primer, render) is counted on one side of the wall, 20 m², with no deduction for openings. Rendering both sides roughly doubles the finishing area. Blocks, mortar, render mixes and lintels are not included.

Preparation before building

01
Marking Out the Wall

The builder marks where the wall goes and how thick it is on the floor and ceiling, following the design. They also check how it meets door openings and the structures around it.

02
Checking the Base

The first course needs a level, clean and solid base. Any unevenness gets corrected with levelling mortar before the first blocks go down.

03
Getting Materials Ready

Enough blocks, mortar and lintels are brought to site up front, so the work runs smoothly and the bond doesn't get interrupted.

04
Priming Before Rendering

Once the wall has cured, the surface gets a primer that suits the substrate and the render mix you've chosen. Only then does rendering start.

€1.90/m²

Method of work

  1. 01The wall's position and line are marked out, and the first course of blocks goes down on a levelling bed of mortar.
  2. 02Each following course is laid in bond, with plumb, level and joint thickness checked all the way up.
  3. 03A lintel goes in above every door or window opening, chosen to suit the structural design and the width of the opening.
  4. 04Once the wall is up, it's left to cure for long enough to suit the material and the weather.
  5. 05Before rendering, reinforcing mesh goes on the surface, especially at joints and where the wall meets other structures.
  6. 06The surface is primed and left to dry, then a scratch coat of render goes on at the specified thickness.
  7. 07When the scratch coat has firmed up, a fine render or gypsum skim goes on top, gets levelled with a straightedge and smoothed off.
  8. 08Before the wall is handed over for painting or tiling, the finished surface is checked for flatness, moisture and overall quality.

5 common mistakes

01
Building on an Uneven Base

Skip the levelling layer under the first course and any unevenness carries right up the wall, so you end up using more render.

02
Ignoring the Bond Pattern

If the vertical joints don't overlap properly from course to course, the wall is weaker and more likely to crack.

03
Rendering Before the Wall Has Cured

Render put on a freshly built wall that hasn't had time to dry tends to crack and peel off.

04
Skipping Mesh Where It Matters

Leave out the mesh at joints, corners and where the wall meets another material, and cracks in the render show up sooner and keep coming back.

05
Wrong Lintel Over an Opening

A lintel of the wrong type, or one that doesn't bear far enough onto the wall, can let the structure sag or cause cracks in the masonry above the opening.

What walls and partitions are built from today

Before you choose a material, ask yourself a simple question: what does this wall have to do? One wall carries the floor above, another keeps the heat inside the house, a third keeps the neighbours' noise out, and a partition often just divides a room. Each material handles these jobs differently, and each one is laid in its own way.

  • Fired clay blocks: ceramic blocks with holes running through them. Most now have ground bed faces, meaning the top and bottom are ground flat, so they are laid on a thin layer of mortar. They are strong, hold heat well and are vapour permeable, which means water vapour can pass through the wall.
  • Aerated concrete: lightweight white blocks. They are easy to cut and can be laid very accurately. They insulate very well, but because they are light, they do less to stop sound. If you want to hang kitchen units or a heavy shelf on this kind of wall, buy fixings made for aerated concrete.
  • Calcium silicate blocks: heavy, strong and able to carry a lot of load. Their weight is what helps them block sound, so they are often used for party walls between flats and anywhere quiet matters. On their own, though, they do little to keep heat in.
  • Concrete blocks and hollow formwork blocks: these belong in foundations, cellars, retaining walls and garden walls. Formwork blocks are hollow. Reinforcement goes into the hollows, which are then filled with concrete.

Do not mix different materials in one wall without thinking it through. Each one expands and settles in its own way, and sooner or later a crack appears where they meet. If you cannot avoid a combination, reinforce the junction with mesh embedded in the plaster.

The first course decides the whole wall

Precision blocks are laid in thin-bed mortar or adhesive. That joint is only a few millimetres thick, so you cannot use it to even out an uneven base. This is why the first course goes into conventional mortar and is carefully levelled along the full length of the wall. Why so much care? Any error in the first course is carried into every course above it, and by the time you reach the ceiling, a small error has become a big one.

For external walls on foundations and walls that stand directly on the ground, a damp-proof course goes under the first course. It stops water rising from the foundations into the masonry. In practice this layer is often forgotten on extensions and garages. A few years later, damp patches show at the bottom of the wall and the plaster starts to fall off.

Blocks are laid in a bond, which simply means the vertical joints must not line up one above the other. The block manufacturer states how far each block should overlap the one below. For standard blocks it is at least a few centimetres. If the blocks have a tongue and groove on their ends, leave the vertical joints without mortar: the blocks just slot into each other.

A partition in a flat: joining it to the walls and ceiling

When a flat is renovated, new partitions are usually built from aerated concrete or clay partition blocks. You normally cannot bond a new partition into the existing wall, so it is connected with wall ties or steel straps. These are set into the bed joints as the partition goes up.

Leave a gap between the top of the partition and the ceiling and fill it with something flexible, such as expanding foam or a resilient strip. The reason is that a floor slab bends slightly under load. If you wedged the partition tight under it, the slab would press down on the partition and crack it. Later, cover the joint with mesh-reinforced plaster or acrylic sealant.

A masonry partition is heavy. In a concrete panel block of flats, and in older houses with timber joist floors, check first whether the floor can carry the extra weight. On a timber floor, a plasterboard partition is often the more sensible choice.

Openings and lintels

Above every door and window there is a lintel. It carries the masonry above the opening and passes the load into the wall on each side. It has to be long enough to sit firmly on the masonry at both ends. In a partition a light lintel is enough. An opening in a load-bearing wall needs a structural lintel, sized by a structural engineer.

When you want to alter a load-bearing wall

Cutting a new opening in a load-bearing wall, or widening an existing one, is structural work. A load-bearing wall holds up the floors and storeys above it. If the opening is made without temporary support and without the right lintel, cracks can appear, and sometimes more serious damage. Before any such work, you need a structural engineer. They assess the wall and specify the lintel, the temporary support and the order in which the work is done.

In concrete panel blocks of flats, the load-bearing panels are altered only in exceptional cases, and always with a structural engineer's approval. In any block of flats you also need consent from the building management or the owners' association. Structural alterations come under local building regulations, and the rules differ from country to country and sometimes between regions. Check with your local building authority what your plans require before you start. Do not assume a quick notification is enough. Sorting out approval for work that is already finished is usually far harder and costs a lot more time and nerves.

Plasters: base coat, finish coat, lime and gypsum

Traditional plaster goes on in two coats. The base coat levels out the masonry and the finish coat gives a fine surface. Today, single-coat plasters applied by machine are common: they are sprayed on and smoothed in one go. Before plastering, plaster beads are fixed to the wall to set a flat plane, and angle beads go on the external corners so they come out straight and resist knocks.

  • Lime and lime-cement plaster: lets vapour pass through and stands up well to wear. It suits living rooms, bathrooms and façades. Lime naturally discourages mould and helps to even out humidity in the room.
  • Gypsum plaster: gives a very smooth surface without a separate finish coat and dries quickly. It belongs in dry living spaces. Keep it out of showers and other wet areas.
  • Renovation plaster: made for damp, salt-laden masonry. It has large pores, and the salts settle in them instead of breaking the plaster apart.

Plaster needs time to cure. For base coats, a common rule of thumb is roughly one day per millimetre of thickness, but the exact time is given by the manufacturer on the bag. If you paint or tile too early, expect stains, peeling paint and cracks.

Old plaster: repair, skim or strip it

Sooner or later, every flat renovation raises the question of what to do with the old plaster. If it is sound and well stuck to the masonry, it is enough to repair the damaged spots and skim the wall. A skim coat evens out small irregularities and leaves a smooth surface ready for paint. You avoid demolition and you do not wait weeks for the wall to dry.

How do you know whether plaster is sound? Tap it. Spots that sound hollow, different from the area around them, should be knocked off and filled. If a large part of the wall sounds hollow, or the plaster crumbles or is soaked with damp, it makes more sense to strip it all and replaster. A skim coat on a weak background will eventually come away, taking the old plaster with it.

In old houses, layers of paint often hide limewash and clay plasters. A modern skim coat will not necessarily stick to them, so try a small test area first. For historic buildings, ask a conservation specialist for advice. In buildings from the middle decades of the last century, some textured wall and ceiling coatings may contain asbestos. If you are unsure, have a sample tested before you sand or scrape, and leave any removal to a licensed professional.

Damp walls in an old house

Older houses often have no working damp-proof course, so moisture from the ground rises into the walls. The signs are damp patches just above the floor, white salt deposits and plaster falling off. New plaster on its own will not fix this. First you have to stop the water getting in, for example by inserting a new damp-proof course after cutting through the wall, by chemical injection, or by improving drainage around the house.

A common mistake is to repair a damp wall with cement plaster or a paint that does not breathe. The moisture cannot dry out through them, so it climbs even higher up the wall. Damp old masonry needs lime or renovation plasters that let vapour through and allow the moisture to escape.

Building walls in cold weather

Mortar and adhesive need water to harden. When that water freezes, it damages their structure and the joint loses strength. So do not lay blocks below the temperature the manufacturer states, usually around +5 °C, and never on frozen blocks. Cover fresh masonry overnight and whenever rain is coming. Rain would wash out the mortar and soak the top of the wall.

DIY guide: repairing a small patch of fallen plaster

If plaster has come off in just one small spot, for example where a wall plug was pulled out or next to a door frame, you can repair it yourself. You need a small hammer, a brush, repair mortar, a trowel and a little patience.

  1. Tap off all loose plaster around the damaged spot with a small hammer until the edge is firm.
  2. Brush the dust off the masonry and dampen it so the new plaster does not dry too fast.
  3. For a deeper hole, apply the repair mortar in layers and let each layer stiffen before the next.
  4. Rule off the final layer with a straightedge or trowel so it sits flush with the surrounding wall.
  5. Once it has started to set, smooth the surface with a damp trowel or sponge float so the texture matches the rest of the wall.
  6. For a crack where different materials meet or above a door, press a strip of glass-fibre mesh into the wet mortar.
  7. Let the repair cure for the time given on the packaging, then prime and paint.
  8. If plaster keeps falling off near the bottom of the wall, look for damp in the masonry as the cause.

What to check when you take over walls and plaster

  • The walls are plumb and flat, checked with a spirit level and a long straightedge
  • The masonry is bonded and the vertical joints do not line up above each other
  • Every opening has a lintel that sits firmly on the masonry at both ends
  • The gap between the partition and the ceiling is filled with a flexible material
  • The plaster is flat, with no cracks, hollow spots or straightedge marks, and the corners are straight
  • For any work on a load-bearing wall, you have the structural engineer's assessment and the documents from the building authority

Frequently asked questions

Building a partition up to 12.5 cm thick from brick or aircrete blocks costs €19.00 per m² of labour, based on the current price list. Blocks, mortar and finishing the surface are priced separately.

Related work

Masonry
Constructing Partitions up to 12.5 cm Thick

How thin partitions are built from brick or aerated concrete blocks, which material to choose, what to watch out for and how to check the finished wall.

Masonry
Mesh Reinforcement for Masonry Partitions

How mesh reinforcement of masonry partitions is done, when it makes sense, which mistakes to avoid and how to check the finished wall.

Masonry
Wall Rendering (Cement-Lime Roughcast Plaster)

How a cement-lime base coat is applied by hand or by machine, what makes the job easier or harder and how to check the finished wall.

Bricklaying and blocklaying
External Wall Masonry - Carcass Construction up to 30 cm Thickness (Brick, Porotherm, Ytong)

How external walls up to 30 cm thick are built in brick, Porotherm or Ytong, what makes the job easier or harder, and how to check the finished masonry.

Masonry
Installation of a Schiedel Chimney System with Ceramic Liner

How a Schiedel-type chimney with a ceramic liner is built, what makes the job harder, common mistakes and how to check the finished chimney.

Masonry
Building a Chimney with Fireclay Bricks and Ceramic Liner

How a chimney is built with fireclay bricks and a ceramic liner, what makes the job harder, typical mistakes and how to check the finished chimney.

Masonry
Wall Repairs, Heavy-Duty Patching (Rimano, Rotband, MVR Uni)

When a gypsum patch is enough and when a wall needs heavy repair with lime-cement mortar. Method, common mistakes and checks.

Masonry
Fine Lime-Cement Render (Feinputz)

How fine lime-cement render (Feinputz) is applied indoors and outdoors, which substrates suit it, common mistakes and how to check the finished work.

Masonry
Machine Applied Plaster - Cement-Lime Plaster

How machine-applied cement-lime plaster is done, how to prepare the walls, when another plaster suits better and how to check the finished work.

Masonry
Plaster and Skim Finishes

How gypsum plastering and skim coating are done, where they suit and where not, what spoils the result and how to check walls before painting.

Masonry
External Renders

How external render is applied to a facade, which type suits a new build, an old house or wall insulation, and how to check the finished work.

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.