Building work price list: Plaster and Skim Finishes
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Masonry cost | ||||
| Gypsum / skim plaster | m² | €12.00 / m² | m² | enter quantity- |
| Partition walling up to 12.5 cm (brick/Ytong) | m² | €19.00 / m² | m² | enter quantity- |
| Walling up to 30 cm (Porotherm, Ytong) | m² | €25.00 / m² | m² | enter quantity- |
| Wall and floor primer application | m² | €1.90 / m² | m² | enter quantity- |
| Mesh reinforcement for internal blockwork | m² | €11.50 / m² | m² | enter quantity- |
| Wall repairs (Rimano, Rotband) | m² | m² | - | |
| Wall plastering (base coat) | m² | m² | - | |
| Fine lime-cement render (Feinputz) | m² | €9.50 / m² | m² | enter quantity- |
| Stucco render | m² | €9.50 / m² | m² | enter quantity- |
| Machine-applied renders (lime-cement) | m² | m² | - | |
| External renders | m² | €15.50 / m² | m² | enter quantity- |
| Lintel installation | pcs | €25.00 / pcs | pcs | enter quantity- |
| Block up openings | m² | €25.00 / m² | m² | enter quantity- |
| Chimney construction (chamotte + ceramic liner) | lm | lm | - | |
| Schiedel-type chimney construction | lm | lm | - | |
How the job is done, step by step
A good plaster finish starts with the background. Gypsum follows exactly what lies beneath it, so any flaw in the masonry will show through on the finished wall.
- Check the background: it must be firm, dry and free of dust, grease and old paint residue. On concrete, remove any traces of release oil from the formwork.
- Measure how flat the walls are, usually with a laser level, and work out how thick the plaster needs to be.
- Cover windows, floors, sockets and switches. Fix corner beads and plaster stop beads where needed.
- Prime the background. Smooth concrete gets a bonding agent so the plaster grips.
- Apply the plaster by machine or by hand, continuously across the whole wall, without long breaks.
- Rule the plaster off flat with an aluminium straightedge and fill any hollows.
- Once the plaster starts to set, dampen the surface and trowel it smooth with a stainless steel trowel.
- Let the plaster dry with gentle, steady ventilation.
- Depending on the finish required, apply a thin skim coat, or two coats on more demanding walls.
A typical gypsum plaster coat is roughly 10 to 15 mm thick, while a skim coat is only about a millimetre. The exact figures are in the manufacturer's technical data sheet.
Machine plaster, hand plaster and skim: which to choose
Machine-applied plaster is mixed and sprayed by a plastering machine. The mix stays the same consistency throughout and the work goes quickly, so it suits large areas in new builds and whole flats. It also reduces the risk of so-called cold joints, the visible lines where fresh plaster meets plaster that has already set.
Hand-applied plaster is mixed in smaller batches and laid on with a trowel. It suits repairs, small or narrow rooms, window reveals and places a machine cannot reach. It is slower, but the plasterer has better control over the details.
For skimming, two main groups of material are used:
- Gypsum finishing plasters, which naturally go well with a gypsum base coat
- Polymer finishing fillers, when a very smooth surface is needed, for example under paints with a sheen or where large windows throw light across the wall
Machine-applied gypsum plaster is often trowelled so smooth that a separate skim is not needed. If the wall will be lit from the side, or you want an almost glass-smooth surface, an extra skim coat is worth it. A fine lime finish is another option, but it gives a slightly textured, matt surface rather than a smooth one.
Where gypsum plaster belongs and where it does not
Gypsum plaster belongs in dry interior rooms: living rooms, bedrooms, children's rooms, hallways and offices. It can briefly take up moisture from the air and release it later, which makes rooms pleasant to live in.
Choose a different system if:
- The wall is external or the space is unheated, where gypsum is not used
- The room is permanently damp, such as a shower room, utility room or cellar
- The masonry suffers from rising damp or salts, typical in older houses without a damp-proof course
- The wall must withstand heavy knocks, for example in a garage or workshop
In these cases a lime-cement or renovation (salt-resistant) plaster is used, or plasterboard. In a domestic bathroom, manufacturers often allow gypsum plaster away from areas hit directly by water, but a shower enclosure needs waterproofing or a different plaster. Always check the technical data sheet for the specific product.
Simply replastering a home usually needs no permission. If you are also removing or moving partition walls or altering load-bearing structures, check with your local building authority first. In a block of flats, let the building management or owners' association know in advance, mainly because of noise, dust and carrying materials through shared areas.
What makes the job easier or harder
The effort, and so the scope of the work, depends mainly on:
- The state of the background: new, straight masonry is simple, while old walls with loose plaster must first be scraped or hacked off
- Unevenness: the more crooked the wall, the thicker the coat and the more material
- The shape of the room: alcoves, sloping ceilings, reveals and lots of corners mean more handwork
- The number of skim coats and how smooth the finish must be
- Machine or hand application
- Access to the site: an upper floor without a lift, or no water or power on site
In older houses, plastering often comes with demolition work and wall straightening, so the full scope can only be judged on site.
Common mistakes that only show after painting
In practice it often happens that a wall looks fine before painting and the faults only appear under the paint. The usual causes:
- Plastering onto damp or not yet cured masonry
- No primer, so areas with different suction dry unevenly and leave patches
- Stopping and starting, which leaves cold joints
- Working in the cold: manufacturers usually advise against working below about 5 °C
- Speeding up drying with heaters or draughts, which causes cracking
- Plastering while floor screeds are being laid and the air is full of moisture
- Skimming over plaster that is not yet dry
A rough rule often quoted is about a day of drying per millimetre of thickness, with good ventilation and at room temperature. Give the walls time before painting and always use a suitable primer or mist coat first.
DIY guide: skimming a small wall
Leave full plastering to a tradesperson, but you can skim a small wall by hand yourself. For ceilings and anything at height, it is better to call in a professional.
- Remove loose material, dust and grease from the wall.
- Fill larger holes and cracks with filler and let it dry.
- Prime the wall as the skim manufacturer recommends.
- Mix the finishing plaster with water exactly as instructed, only as much as you can use in time.
- Apply a thin coat with a stainless steel trowel using diagonal strokes.
- Once the surface firms up, trowel it smooth with another pass.
- When dry, check the wall with side lighting and lightly sand any high spots.
- Apply a second coat if needed and let it dry again.
How to check the finished walls
When you take over the work, look at each wall in side lighting, for example with a lamp held close to the surface, and check:
- Flatness with a long straightedge, with no noticeable hollows or bulges
- Straight, crisp corners and edges around windows and doors
- A surface free of cracks, pinholes, scratches and trowel marks
- Even colour with no darker damp patches
- Clean junctions at ceilings, floors and door frames
- Sockets, windows and floors still covered and undamaged
- Advice from the plasterer on when you can paint and which primer to use
Frequently asked questions
Not always. Well-trowelled machine gypsum plaster can often be painted directly. A skim is worth it if you want a very smooth finish or if light falls across the wall and shows up every imperfection.
Only once the plaster is completely dry and evenly pale. It depends on the thickness, temperature and ventilation, and the manufacturer gives a guide time. Prime before painting.
Many manufacturers allow it in an ordinary domestic bathroom away from the shower. It is not suitable for areas hit directly by water or permanently damp spots, which need waterproofing or a lime-cement plaster.
Yes, if the old plaster is firm, dry and well bonded. Loose and hollow areas must be removed, and the surface cleaned and primed. On damp or salt-affected masonry, a renovation plaster is the better choice.
The usual causes are drying too fast, draughts, heaters, too thick a coat or movement in the background. Fine hairline cracks can be dealt with during skimming. Larger cracks should be checked to see whether they are linked to the structure.
Related work
How thin partitions are built from brick or aerated concrete blocks, which material to choose, what to watch out for and how to check the finished wall.
How mesh reinforcement of masonry partitions is done, when it makes sense, which mistakes to avoid and how to check the finished wall.
How a cement-lime base coat is applied by hand or by machine, what makes the job easier or harder and how to check the finished wall.
How a Schiedel-type chimney with a ceramic liner is built, what makes the job harder, common mistakes and how to check the finished chimney.
How a chimney is built with fireclay bricks and a ceramic liner, what makes the job harder, typical mistakes and how to check the finished chimney.
When a gypsum patch is enough and when a wall needs heavy repair with lime-cement mortar. Method, common mistakes and checks.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.