Building work price list: Wall Rendering (Cement-Lime Roughcast Plaster)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Masonry cost | ||||
| Wall plastering (base coat) | m² | €14.50 / m² | m² | enter quantity- |
| Partition walling up to 12.5 cm (brick/Ytong) | m² | €19.00 / m² | m² | enter quantity- |
| Walling up to 30 cm (Porotherm, Ytong) | m² | €25.00 / m² | m² | enter quantity- |
| Wall and floor primer application | m² | €1.90 / m² | m² | enter quantity- |
| Mesh reinforcement for internal blockwork | m² | €11.50 / m² | m² | enter quantity- |
| Wall repairs (Rimano, Rotband) | m² | m² | - | |
| Fine lime-cement render (Feinputz) | m² | €9.50 / m² | m² | enter quantity- |
| Stucco render | m² | €9.50 / m² | m² | enter quantity- |
| Machine-applied renders (lime-cement) | m² | m² | - | |
| Gypsum / skim plaster | m² | €12.00 / m² | m² | enter quantity- |
| External renders | m² | €15.50 / m² | m² | enter quantity- |
| Lintel installation | pcs | €25.00 / pcs | pcs | enter quantity- |
| Block up openings | m² | €25.00 / m² | m² | enter quantity- |
| Chimney construction (chamotte + ceramic liner) | lm | lm | - | |
| Schiedel-type chimney construction | lm | lm | - | |
What a base coat render is and when it is needed
Plasterers call it the base or backing coat because it forms the core of the whole wall finish. It is the first continuous layer. It levels uneven bricks, blocks or concrete, provides a firm background and prepares the wall for a skim coat, a finishing plaster or paint. It is usually made from a cement-lime mix. The cement gives strength, and the lime gives breathability and flexibility. After ruling off with a straightedge and rubbing up with a float, the surface stays rough, which is why it is also called roughcast plaster.
It is needed:
- in new builds, on bare masonry,
- after alterations, when new walls have been built or masonry has been made good, for example after constructing new partitions up to 12.5 cm thick,
- in the renovation of an older house, when the original plaster has been hacked off back to the masonry,
- in cellars, garages and workshops, where it often stays as the final surface.
Minor damage to old plaster does not always call for replastering the whole wall. Patch repairs to hollow and crumbling areas may be enough. A wall is replastered in full when the old plaster is in poor condition over a larger area or when the wall has been stripped back to the masonry.
What to decide before the plasterer starts
Some decisions are hard to change once the wall is rendered. It pays to settle them before asking for a quote.
- What goes on top of the render: in living spaces, a skim coat or finishing plaster is almost always applied over the base coat. In a garage or cellar, the render can stay as it is or just be painted. This decides how the surface is finished after ruling off.
- Method and mix: whether the work is done by hand or by machine, and which type of render suits the background. More detail follows in the next section.
- Corners and reveals: whether angle beads will be fixed to external corners and window edges to keep them straight and hard-wearing.
- Reinforcement: where mesh will be embedded in the render, mainly where different materials meet, for example brickwork and a concrete ring beam.
- Required flatness: the permitted deviation is set by the applicable standards or the contract. If a tighter tolerance is needed, for example under large-format tiles, say so in advance.
Work on load-bearing walls and on the common parts of a block of flats requires consent and a specialist. It is not part of rendering.
By hand or by machine, and which mix where
Hand application suits smaller areas, repairs, and walls broken up by many reveals and recesses, or places where a machine cannot easily be set up. It is slower, but the plasterer has full control over every spot.
Machine application pays off on whole houses and large continuous areas, especially in new builds. The render has a more even consistency and the work goes much faster. However, a water and power supply, space for the machine and thorough protection of windows, doors and floors are needed.
The choice of mix depends on the background and the location:
- Interior living spaces: a standard cement-lime base coat, later finished with a skim coat,
- aircrete and lightweight blocks: lightweight renders designed for these materials, so that the render is not harder than the masonry,
- damp cellars and old masonry: renovation (salt-resistant) plaster systems. Ordinary render on a damp wall soon falls off,
- exterior and plinth: weather-resistant and splash-resistant renders according to the facade manufacturer's system.
If the mortar is mixed on site from cement, lime and sand, the ratio is chosen to suit the purpose: more cement means higher strength but lower breathability. A pre-bagged mix has the advantage of a consistent composition, and the manufacturer states the coverage, coat thickness and drying time.
How the base coat is applied step by step
The usual sequence is as follows:
- Protection: windows, door frames, floors and services are covered with sheeting and taped so that mortar does not stick to them.
- Preparing the background: the wall must be sound, clean and free of dust, grease and loose material. On old walls, anything that is not well bonded is hacked off, and larger holes are filled beforehand. In homes built before 2000, have suspect materials tested before you drill or demolish; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor. Chases for services are made good with mortar.
- Spatterdash or primer: a thin cement spatterdash coat is thrown onto smooth concrete to create a rough key. On very absorbent backgrounds such as aircrete, a primer or spatterdash is used as recommended by the render manufacturer. This stops the background drawing water out of the mortar too quickly.
- Fixing beads: plaster screed beads or dots are fixed to the wall to set the plane and thickness of the render. Angle beads go on the corners so that the arrises are straight and hard-wearing.
- Reinforcement at risk points: where different materials meet, such as brickwork and a concrete ring beam, mesh is embedded in the render to limit cracking. More on this is covered under mesh reinforcement for masonry partitions.
- Mixing: the dry bagged mix is combined with water exactly according to the instructions, and only as much as can be used in time.
- Application: the render is thrown on by hand with a trowel or sprayed with a plastering machine. One coat is usually around 10 to 20 mm. Thicker build-ups are done in two coats, and the second goes on only once the first has firmed up.
- Ruling off and levelling: a straightedge run along the beads removes excess mortar, and hollows are filled in. Once the render has firmed up, the surface is rubbed up with a float or sponge, depending on whether it is to stay rough or receive another coat.
- Reveals and details: window and door reveals are finished, along with the areas around back boxes, pipes and frames.
- Curing and drying: the render should dry naturally, away from direct sun, frost and strong draughts. In hot weather it is lightly dampened as needed. In cold weather it is fine to heat the room gently so the temperature does not drop below about +5 °C. Rapid drying with heaters or strong heating does harm, however: the surface dries before the inside of the coat and the render cracks.
The skim coat or finishing plaster goes on only once the render is fully dry. How long this takes is covered in the frequently asked questions below.
What the price of rendering depends on
The guide labour price is €14.50 per m². The difficulty, and therefore the cost, can still vary considerably between two jobs of the same area. The main factors are:
- Flatness of the masonry: straight masonry built from precision blocks needs only a thinner coat. Old, uneven masonry has to be levelled with a thick coat, often in two passes, which adds material and waiting time between coats.
- Condition of the background: hacking off old plaster, repairing the background and filling larger holes are extra work, usually charged separately.
- Damp masonry: a damp wall needs a renovation plaster system rather than ordinary render. This is more expensive and more labour-intensive.
- Type of background: smooth concrete needs a spatterdash coat, absorbent masonry needs priming. Each extra step adds to the price.
- Wall layout: large continuous walls without many windows and corners go quickly. Lots of reveals, corners and electricians' chases slow the work considerably, and reveals are sometimes charged separately per running metre.
- Height and access: high ceilings or stairwells that need scaffolding make the job more expensive.
- Application method: machine application is faster on large areas, but on a small area setting up the machine is not worthwhile.
- Accessories: angle beads, mesh at material junctions and their fixing are usually separate items.
- Occupied home: when everything has to be covered, moved and cleaned up as the work goes on, there is more work than in an empty new build.
When comparing quotes, check whether the price includes materials, spatterdash, beads and reveals, how the area is measured and whether windows and doors are deducted.
How to prepare for rendering
Good site organisation makes a big difference. The work goes more smoothly when:
- services in the walls are installed and tested, chases are cut and back boxes are fixed. Electrical work is done only by a qualified electrician, and the plasterer simply makes good the chases afterwards,
- windows and door frames are fitted so that the reveals can be finished up to them,
- built-in elements such as an installed Schiedel chimney system with ceramic liner are complete, so the render can be finished around them,
- water and power are available on site, and for machine application also space for the machine and access for delivering the mix,
- rooms are cleared and floors are free,
- it is clear where materials can be stored and where rubble is taken. Before you hand over renovation rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note,
- rooms can be kept above about +5 °C and ventilated without strong draughts.
The work takes longer when the plasterer has to wait for the electrician or plumber, when the weather rules out rendering in an unheated building, or when chases are cut after rendering and the render has to be repaired.
When rendering in a block of flats, agree the working hours, rubble removal and protection of common areas with the managing agent or management company in advance. Rendering an interior on its own does not usually require any approval. For work on the facade, changes to load-bearing walls or a larger renovation, check the Planning Portal before you start: planning permission and building regulations approval are separate, and flats, listed buildings and conservation areas have stricter rules. In Scotland, structural alterations, extensions and loft conversions need a building warrant from the council before work starts.
Mistakes that cause problems later
Rendering onto a dusty or dry background. The render does not bond, and in time it sounds hollow or falls off.
Skipping the spatterdash on concrete. Smooth concrete gives the mortar nothing to key into. The render sounds hollow when tapped and can come away in large pieces.
Too thick a coat in one go. The render slumps and cracks as it dries.
Rendering in frost or direct sun. Below about +5 °C the mortar does not set properly, while in heat it dries too quickly. The result is weak, crumbly or cracked render.
Skimming or painting too early. In practice, another coat is often applied to render that is still damp, and a few weeks later patches or cracks appear.
No reinforcement where different materials meet. For example, brickwork next to a concrete ring beam. Without mesh in the render, a crack almost always appears there, often as straight as a ruler.
Ordinary render on damp masonry. Moisture and salts break it down, efflorescence appears and the render falls off.
Render that is too hard on aircrete. Render stronger than the masonry delaminates and cracks with movement.
DIY guide: a base coat in a cellar or garage
A smaller area in a utility room can be done as a DIY job with a little patience. For a whole living floor or a facade, it is more sensible to call a plasterer. Leave work at height and on scaffolding to professionals. Do not interfere with electrics in the wall - back boxes and cables are a job for a qualified electrician.
- Hack off loose material and brush the wall free of dust.
- Apply a cement spatterdash to concrete, or a primer to absorbent masonry, following the instructions.
- Fix the screed beads level and plumb with a spirit level and let them set.
- Mix the dry render with water exactly as stated on the bag, only as much as can be used within its working time.
- Throw the mortar on with a trowel, working upwards from the bottom in small areas.
- Rule off the excess with a straightedge resting on the beads and fill any hollows.
- Once it has firmed up, rub the surface up with a float.
- Protect the render from draughts and frost and let it dry.
Wear goggles and gloves when mixing and applying mortar. Cement mortar irritates skin and eyes.
How to check the finished render
- a long straightedge held against the wall should not reveal noticeable hollows or bumps - the permitted deviation is set by the applicable standards or the contract,
- corners and reveal edges are straight and plumb,
- the render does not sound hollow anywhere when tapped, which would mean it is coming away from the background,
- there are no cracks, crumbling areas or patchy marks from uneven drying on the surface,
- the render is reinforced with mesh at junctions of different materials, if this was agreed,
- the render is neatly finished and clean around back boxes, pipes and frames,
- windows, floors and services are cleaned of mortar after the work.
Check flatness and hollow areas at handover. Later, once a skim coat or paint is on the wall, repairs are more work and it is harder to prove who caused the defect. Further related trades are described in the overview of masonry work.
Frequently asked questions
Roughly €14.50 per m². The final price depends on the condition and flatness of the masonry, coat thickness, the need for spatterdash, the number of reveals and corners, the room height and whether the work is done by hand or by machine.
Application itself depends on the area, the wall layout and the method. On large areas, machine application is much faster than hand work. With thicker build-ups there is a wait for the first coat to firm up. The total time must also allow for drying before skimming, which for a normal thickness takes weeks rather than days.
It depends on coat thickness, temperature and ventilation. As a rough guide, allow about one day of drying for every millimetre of thickness, but always follow the manufacturer's data and check that the render is dry to the touch and evenly light in colour.
In a garage, cellar, workshop or boiler room, yes, possibly just with a coat of paint. In living spaces a skim coat or finishing plaster is almost always applied so the surface is smooth and easy to decorate.
Yes, if the old plaster is sound, dry and well bonded. Hollow, crumbling or damp areas must be removed and the background treated with primer. Damp masonry needs a renovation plaster system, not ordinary render.
The most common causes are drying too quickly, too thick a coat in one go, or a junction of different materials without reinforcing mesh. A poorly prepared background that drew water out of the mortar can also contribute.
Only if both the room and the wall stay above about +5 °C during application and drying. In an unheated building in frost the mortar does not set properly, so in winter rooms are heated gently rather than dried out rapidly.
Related work
How thin partitions are built from brick or aerated concrete blocks, which material to choose, what to watch out for and how to check the finished wall.
How mesh reinforcement of masonry partitions is done, when it makes sense, which mistakes to avoid and how to check the finished wall.
How a Schiedel-type chimney with a ceramic liner is built, what makes the job harder, common mistakes and how to check the finished chimney.
How a chimney is built with fireclay bricks and a ceramic liner, what makes the job harder, typical mistakes and how to check the finished chimney.
When a gypsum patch is enough and when a wall needs heavy repair with lime-cement mortar. Method, common mistakes and checks.
How fine lime-cement render (Feinputz) is applied indoors and outdoors, which substrates suit it, common mistakes and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.