Price list 2026 · Europe

Installation of a Schiedel Chimney System with Ceramic Liner

A Schiedel chimney system is built from factory-made chimney blocks, insulation and a ceramic flue liner. Labour alone costs approximately €45.00 per running metre, excluding materials. Height, the number of flues and roof penetrations affect the price most.

Updated 09/2026·13 min read·15 price list items
Standard labour price
€45.00/ lm
Indicative range
€36.00 - €58.50
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Installation of a Schiedel Chimney System with Ceramic Liner

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Bricklaying and plastering15 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Masonry cost

Schiedel-type chimney constructionlm€45.00 / lmlmenter quantity-
Partition walling up to 12.5 cm (brick/Ytong)m²€19.00 / m²m²enter quantity-
Walling up to 30 cm (Porotherm, Ytong)m²€25.00 / m²m²enter quantity-
Wall and floor primer applicationm²€1.90 / m²m²enter quantity-
Mesh reinforcement for internal blockworkm²€11.50 / m²m²enter quantity-
Wall repairs (Rimano, Rotband)m²m²-
Wall plastering (base coat)m²m²-
Fine lime-cement render (Feinputz)m²€9.50 / m²m²enter quantity-
Stucco renderm²€9.50 / m²m²enter quantity-
Machine-applied renders (lime-cement)m²m²-
Gypsum / skim plasterm²€12.00 / m²m²enter quantity-
External rendersm²€15.50 / m²m²enter quantity-
Lintel installationpcs€25.00 / pcspcsenter quantity-
Block up openingsm²€25.00 / m²m²enter quantity-
Chimney construction (chamotte + ceramic liner)lmlm-
Total labour
- enter quantity
Create quote from price list →

What a Schiedel chimney system is and when it is needed

A system chimney is not built from individual bricks. It is assembled from components made by one manufacturer that fit together precisely. It is usually chosen for a new build, a change of heating system or to replace an old, cracked brick chimney that no longer meets current requirements. Compared with a traditional chimney with clay liners set in brickwork, it is a kit with an exact procedure set by the manufacturer. The bricklayer assembles and checks more than he shapes. It sits within masonry work, but follows its own rules.

A Schiedel-type chimney usually has three functional layers:

  • an outer casing of chimney blocks, usually lightweight concrete, which carries the whole chimney and protects the surroundings from heat,
  • insulation, which keeps the flue gases warm so they do not cool unnecessarily and produce more condensate than necessary,
  • a ceramic flue liner, which resists high temperatures, moisture and the acids in flue gases.

The exact build-up depends on the specific system. In some, insulation boards are placed between the block and the liner as a separate layer. In others, the insulation is part of the block, or the system works with an air gap. The installation procedure therefore always follows the instructions for the system being purchased.

The system also includes special components: a base unit with a condensate trap and drain, a section with a cleaning opening and soot door, a connector for the flue pipe from the boiler or stove, and the termination above the roof, meaning the chimney stack with a capping slab. A ventilation shaft is often run alongside the flue.

The advantage of the system is that all components are designed to work together. When the manufacturer's procedure is followed, the chimney draws well, condensate can drain away and the liner withstands the thermal load. The disadvantage is that the system does not tolerate improvisation. A component from another manufacturer, a different mortar or an omitted expansion joint will later show up as cracks or poor draught.

What needs to be decided before building starts

Most important decisions have to be made before ordering materials. Once built, a chimney is difficult to alter.

Which appliance will be connected

The system is selected according to what will be connected to the chimney:

  • open fires, wood-burning stoves, and boilers burning wood, pellets or coal need a chimney rated for high flue gas temperatures and resistant to soot fires,
  • modern gas and condensing boilers produce cool, wet flue gases, often under positive pressure, so they need a liner rated for wet operation or another solution specified by the boiler manufacturer,
  • two appliances, for example a stove and a boiler, usually require two separate flues. Connecting both to one flue is only possible on the basis of a calculation.

If a specific boiler or stove has not yet been chosen, at least decide on the type of fuel. A chimney is built to last for decades and the appliance may be replaced during that time. Anyone considering adding a wood-burning stove later will save a lot of work by building a twin-flue chimney straight away.

Flue diameter and chimney height

The flue diameter and chimney height should be determined by a designer or a chimney specialist according to the appliance output. A flue that is too large draws poorly, just like one that is too small. The height of the stack above the roof is not a matter of guesswork. It depends on how far the chimney is from the ridge, the roof pitch and whether there are taller buildings or trees nearby. A chimney close to the ridge generally has to rise above it, while different rules apply further from the ridge and on flat roofs. The specific height should be stated in the design or by the specialist before the components are ordered.

Position in the house

  • a chimney inside the house, ideally near the ridge, stays warmer and draws better than one on an external wall,
  • the route should run vertically through all floors, without offsets and clear of roof timbers so that they do not have to be cut,
  • the cleaning opening must remain accessible and should not end up behind kitchen units or in a narrow corner,
  • plan where the condensate will drain to, usually into the foul drainage system.

Approvals and consents

Building a new chimney is normally building work subject to building regulations. Check with local authority building control, or with the installer if they are registered with a relevant competent person scheme, which procedure applies to the specific house. In England and Wales, any solid fuel installation must by law be notified to building control, either via a Competent Person Scheme such as HETAS or directly to the council, so use a HETAS registered installer for a new stove. In listed buildings and conservation areas, planning consent may also be needed for a new stack. In a block of flats, consent from the freeholder or management company is required, because the work affects shared parts of the building.

In an existing house, it is also worth calling in a structural engineer before work begins. A chimney is heavy and passes through floors and the roof structure. If joists, rafters or the floor structure need to be altered, this is work on load-bearing elements and belongs in the hands of a professional.

How a Schiedel chimney is built step by step

  1. Checking the base. A chimney is heavy, so it must stand on a solid foundation or on a floor designed for such a load. The base must be flat and level.
  2. Setting the base unit. The first block is bedded in mortar and set precisely level. Any deviation grows with height and the chimney would start to lean.
  3. Condensate trap and cleaning section. The condensate trap with its drain goes at the very bottom, with the section containing the cleaning opening above it. These are not fitted afterwards, but installed in sequence with the other components.
  4. Building the casing and inserting the liners. The blocks are laid in the mortar recommended by the manufacturer, and the ceramic liners are jointed with a special acid-resistant sealant. Excess sealant is wiped off immediately so that no ridges form inside the flue. Insulation is fitted according to the system so that the liner stays centred.
  5. Continuous plumb checks. After every few blocks, the chimney is checked with a spirit level or plumb line from several sides. A deviation found early can be corrected, but not once the stack is reached.
  6. Flue connector. The connector is fitted at a height that matches the boiler or stove. This height should be measured in advance, as drilling into a finished chimney is an unnecessary risk.
  7. Passing through floors and the roof. A clearance is left around the chimney from timber joists and other combustible materials as specified by the manufacturer for the system. With common systems this is a few centimetres, but the exact value must be taken from the instructions, not estimated. This gap is not filled with anything combustible.
  8. Chimney stack and finishing. Above the roof, the chimney is finished with a capping slab. The outer part is rendered with a durable external render, clad, or fitted with a prefabricated stack casing. The roof penetration is flashed and sealed.
  9. Inspection and testing. Once the mortar and sealant have dried, the chimney is inspected and tested by a competent specialist, and the result is recorded in writing. Only then is the appliance connected and lit.

Why must the liner not be rigidly built into the casing? Ceramic expands when heated. If it has no room to move, the casing cracks. The system therefore relies on loose bedding and expansion joints, particularly at the capping slab.

The building itself does not usually take long. A standard chimney through two storeys in a new build is typically completed by a bricklayer in one to two days. In an occupied house, where floors and the roof must be opened up, the work usually takes several days, plus time for the carpenter and roofer.

Price of building a Schiedel chimney per running metre

The approximate labour price is €45.00 per running metre. The running metre is measured along the height of the chimney, from the base unit to the stack. The final amount differs from the basic price depending on these factors:

  • Chimney height and number of storeys. More metres directly mean a higher total. Each storey also adds a floor penetration, where clearance from the structure must be maintained and the area around the opening carefully made good.
  • Number of flues and a ventilation shaft. A twin-flue chimney or one with a ventilation shaft has larger, heavier blocks and two liners to joint. Labour per running metre is noticeably higher than for a single flue.
  • New build or existing house. In a new build, the chimney goes up with the house and the floors have prepared openings. In an occupied house, floors and the roof must be opened up, the interior protected from dust and the roof structure altered. This work can cost considerably more than the chimney itself.
  • Condition of the base. If a new foundation or floor strengthening is needed, this is separate work added to the price per running metre.
  • Access and height above the roof. A stack on a steep or high roof is built from scaffolding or with fall protection. Scaffolding is often charged separately.
  • Moving materials. The blocks are heavy. If they have to be carried by hand into the loft or up a narrow staircase, the labour increases.
  • Stack finish. Render is the simplest, facing brick or stone cladding takes more work, and a prefabricated stack casing is quick but more expensive in materials.
  • Related work. Flashing, adjusting the roof covering around the chimney and connecting the appliance are usually done by other trades and are not normally included in the bricklaying price.

In practice, the most time is often taken not by the building itself but by the penetrations through the roof structure and roof, where timbers have to be adapted and the roof covering remade around the chimney. When comparing quotes, check whether the price per running metre includes the stack, the special components and the penetrations, or only straight block laying.

What makes the work easier and what slows it down

A bricklayer saves time when everything is ready on site. The following helps most:

  • a complete chimney system delivered in one go, including special components, mortar and sealant from the manufacturer, so there is no waiting for a missing piece,
  • a measured connector height for the specific appliance and a marked position for the cleaning opening,
  • a design or a chimney specialist's recommendation on flue diameter and height before materials are delivered,
  • a carpenter and roofer booked to adapt the roof structure and covering as soon as the chimney passes through the roof, so the opening is not left open for long,
  • scaffolding erected or safe roof access arranged for the day the stack is built,
  • a clear space along the chimney route and a storage area for blocks nearby,
  • water and electricity on site for mixing mortar.

Where new walls are built up against the chimney, it helps to plan their sequence in advance. Constructing partitions up to 12.5 cm thick next to the chimney usually follows once the chimney is complete, and the joint between the two is often treated with mesh reinforcement for masonry partitions before plastering, so that cracks do not appear along it.

Frost and rain, on the other hand, slow the work down. Mortar and sealant need temperatures above freezing to cure, and outdoor work is generally carried out above +5 °C. The stack is not built in rain and fresh masonry must be protected from water ingress. If it turns out during the work that a roof timber is in the way of the route, work stops until the carpenter or structural engineer decides how to alter it.

Typical mistakes and how they show up later

The base unit is not level. The chimney gradually leans, the stack does not sit properly in the roof opening and the liner joints are put under stress. The repair means dismantling the chimney down to the point of the error.

Liners jointed with ordinary mortar instead of acid-resistant sealant. Acids in the flue gases gradually eat away the mortar, the joints leak and brown stains and odours appear on the casing or the adjacent wall.

Sealant squeezed into the flue. Ridges catch soot, the chimney clogs faster and the draught deteriorates. With solid fuels, this increases the risk of a chimney fire.

No expansion allowance for the liner. The liner expands when heated, presses on the casing and the capping slab cracks. Water gets into the cracks and frost makes the damage worse.

Timber joists or roof insulation directly against the chimney. Without the specified clearance, the timber overheats over time and there is a fire risk, often only after years of use. Such a chimney will not pass inspection.

Chimney too low above the roof. It draws poorly, smoke blows back into the room when the wind comes from a certain direction and the appliance burns unevenly. Raising the stack afterwards is laborious.

Poorly sealed roof penetration. Water gets into the loft, insulation and timbers get wet and ceiling stains often appear only during heavier rain or snowmelt.

Missing or unconnected condensate drain. Condensate collects at the base of the chimney, seeps through the masonry and damp patches and efflorescence appear on the wall.

Connector drilled in afterwards. Drilling into a finished chimney can damage the liner and the joint around the connection will leak.

How to check the finished chimney

  • the chimney is plumb, which can be checked with a spirit level or plumb line in several places,
  • the cleaning opening is accessible and the soot door seals well,
  • the condensate trap is fitted and the condensate drain is connected,
  • the flue connector is at a height that matches the appliance,
  • looking into the flue through the cleaning opening with a torch, no sealant ridges are visible,
  • no combustible materials around the chimney in the floors and roof structure are closer than the manufacturer allows,
  • the stack height above the roof matches the design or the specialist's recommendation, and the capping slab is intact, without cracks,
  • the roof penetration is flashed and watertight, so it is worth checking the loft after the first rain,
  • the render or cladding on the stack is continuous and free of cracks - for the render itself, see wall rendering with cement-lime roughcast,
  • documentation for the system used and the written record of the chimney inspection and testing are on hand.

Chimney specialist, gas engineer and safety

Before the first fire is lit, the finished chimney must be inspected and tested by a competent specialist and the work signed off as required. Without this, the chimney should not be used, and in the event of a fire, missing documentation may also cause problems with the insurer.

Connecting a gas boiler to the chimney may only be carried out by a Gas Safe registered engineer, so check the back of their ID card to see which work they are qualified for. If the boiler needs an electrical connection, for example a pellet boiler with a control unit or a condensing gas boiler, it must be connected by a qualified electrician. If gas can be smelled, leave the premises and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter.

Frequently asked questions

The approximate labour price is €45.00 per running metre. The total is mainly affected by the overall chimney height, the number of flues, whether penetrations are made in an existing house, roof access and the type of stack finish. Materials, scaffolding and roofing work are usually charged separately.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.