Building work price list: Chevron Parquet Flooring Installation and Adhesion
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Flooring cost | ||||
| Install Chevron parquet flooring | m² | €29.00 / m² | m² | enter quantity- |
| Remove old nailed/glued wood parquet flooring | m² | €12.00 / m² | m² | enter quantity- |
| Careful removal of old parquet to laying plan | m² | €5.10 / m² | m² | enter quantity- |
| Install laminate flooring | m² | €12.50 / m² | m² | enter quantity- |
| Install click vinyl flooring | m² | m² | - | |
| Install click/lock engineered wood flooring | m² | €12.50 / m² | m² | enter quantity- |
| Full-bond solid/engineered wood flooring | m² | €12.00 / m² | m² | enter quantity- |
| Install underfloor heating (electric mat) | m² | m² | - | |
| Install parquet blocks | m² | m² | - | |
| Install and bond original parquet blocks (reclaimed/repaired) | m² | m² | - | |
| Sand and 3x lacquer parquet flooring | m² | m² | - | |
| Sand, fill and 3x lacquer parquet flooring (complete) | m² | €30.00 / m² | m² | enter quantity- |
| Install skirting boards | lm | €4.00 / lm | lm | enter quantity- |
| Caulking around skirting boards | lm | €1.90 / lm | lm | enter quantity- |
| Install transition strips | pcs | €8.00 / pcs | pcs | enter quantity- |
What chevron parquet is and when it suits
With a chevron pattern, the floor fitter bonds timber strips with angle-cut ends so that they meet and form continuous arrow points. Homeowners usually choose this pattern during a flat or house renovation when they want a timber floor with a striking but calm pattern. It suits living rooms, bedrooms, studies and hallways, as well as open spaces running through several rooms, where the arrows make the space look longer. Chevron is one of the more demanding tasks within flooring work.
A mistake in setting out the first row carries through the whole floor. The key decisions should therefore be clear before any material is ordered.
How chevron differs from herringbone
At first glance the two patterns look similar. The difference is in the ends of the strips. In herringbone, the blocks have square ends and are laid at right angles to each other with an offset, which creates a stepped, zigzag line. In chevron, the ends are cut at an angle and the strips meet exactly at one point. The result is a clean arrow line without steps.
For chevron, manufacturers state the cutting angle of the strip end. The most common is 45°, followed by 30° or 60°. Not all manufacturers state the angle the same way, though. Some measure it from the long edge of the strip, others from the perpendicular. The angle changes how sharp or flat the arrow looks, so it is more reliable to look at a laid sample or a photo of a finished floor than to rely on the number alone.
Chevron parquet is usually bought factory-cut in two versions: left-hand and right-hand strips. The fitter then alternates them according to the layout plan. Cutting on site mainly concerns the edges along walls, transitions into other rooms and cutting around door frames.
What to decide before ordering
Some decisions cannot be changed once bonding has started. Agree them with the floor fitter in advance.
- Direction of the arrows: usually in the direction of incoming light or along the longest axis of the room. Also consider where the arrows should "point", for example from the entrance towards the window.
- Connecting rooms: whether the pattern should run continuously through doorways and the hallway, or stop at a threshold strip in each doorway. A continuous pattern looks better but needs more planning and the expansion gaps required by the manufacturer must still be respected.
- Timber species: oak is the most common choice, as it is hard and fairly dimensionally stable. Ash, walnut or exotic species are possible but need more careful assessment.
- Solid or engineered parquet: solid wood can be sanded several times but reacts more to changes in humidity. Engineered parquet is more stable and better suited to underfloor heating. The number of possible refinishes depends on the thickness of the wear layer.
- Factory finish or finishing on site: prefinished parquet shortens the job and avoids sanding in the home. Finishing on site allows small height differences to be evened out and creates one continuous coat across the whole floor.
- Lacquer or oil: lacquer is more hard-wearing and easier to clean. Oil looks more natural and can be repaired locally, but needs regular maintenance.
- Floor height: parquet plus adhesive raises the floor level. Check that the doors will still clear, that no step will form at the transition to the bathroom or kitchen, and whether door frames need undercutting.
- Quantity of material: angled cuts produce more waste than straight laying. The allowance is usually higher than for an ordinary floor, often around 10 to 15 %, and more for irregular rooms. The fitter will confirm the exact quantity after measuring up. It is best to buy all the material at once from one batch and keep a few strips for later repairs.
Preparing the subfloor and the material
With an arrow pattern, the subfloor matters even more than with straight laying, because every unevenness shows up as an inaccurate joint at the point. The screed must be flat, sound, free of cracks and dry.
- Flatness: as a guide, a deviation of about 2 mm under a 2-metre straightedge is usually quoted. If the subfloor is worse, the fitter primes it and levels it with a self-levelling compound.
- Moisture: it is measured with an instrument, often using the carbide (CM) method, or as relative humidity with a hygrometer. For a cement screed, around 2 CM % is usually required, considerably less for an anhydrite (calcium sulphate) screed, and stricter values apply with underfloor heating. The figures given by the adhesive and parquet manufacturers are decisive.
- Strength and cleanliness: if the surface has a weak top layer (laitance), it is ground off and then thoroughly vacuumed. Dust under the adhesive is one of the common causes of strips coming loose.
Before laying, the parquet must be left in the room where it will be fitted so that it adjusts to the temperature and humidity. For engineered parquet, at least two days is usually quoted. For solid wood, manufacturers often ask for longer, frequently around a week. The exact time and conditions are in the manufacturer's instructions. The room should be at normal room temperature with relative humidity of roughly 40 to 60 %. Wet trades, such as plastering and screeding, should already be finished and dry.
With underfloor heating, the screed must be heated up before laying according to a commissioning record prepared by the heating engineer, and after laying the heating should be switched on gradually.
How the installation works step by step
- Measure the room, check whether the walls are square and set the main axis of the pattern according to the agreed arrow direction.
- Mark the axis on the subfloor with a laser or chalk line and plan how the pattern will connect to neighbouring rooms.
- Dry-lay the first row so that the edges along the walls come out symmetrical with no narrow offcuts.
- Spread adhesive with a notched trowel over a small area that can be covered within the open time of the adhesive.
- Lay the left-hand and right-hand strips so that the points sit exactly on the axis, pressing each one down firmly.
- After each row, check the arrow direction, the tightness of the joints and the flatness, because a small deviation grows with every further row.
- Cut the edges with a mitre saw and leave an expansion gap at the walls as recommended by the manufacturer.
- Let the adhesive cure, sand the floor if needed and finish it with lacquer or oil, unless it is a prefinished product.
- Fit the skirting boards and threshold profiles.
Adhesive and fixing method
Chevron is almost always fully bonded. Solvent-free, water-free elastic adhesives are used, most often silane-modified (MS polymer) or polyurethane. A water-based adhesive can make the wood swell and distort. Elastic silane adhesives cope well with the natural movement of timber and are a common choice over underfloor heating too. Two-component polyurethanes give a very strong bond but require accurate mixing. Coverage is set by the manufacturer according to the trowel notch size and the flatness of the subfloor.
Chevron floors with a click joint for floating installation also exist. In this pattern, however, they are less stable and move more over larger areas, so floor fitters prefer bonding. If a floating floor is the priority, a straight-laid option such as floating laminate flooring, a floating click timber floor or click vinyl flooring is usually the more reliable choice.
How long chevron parquet installation takes
The time depends on the floor area, the condition of the subfloor and whether the surface is finished on site. The bonding itself is slower than with straight laying, because each point has to be aligned precisely and the edges cut at an angle. In a typical flat, bonding usually takes several days.
- Subfloor preparation: grinding, priming and levelling add one to two days, plus drying time for the levelling compound according to the manufacturer.
- Adhesive curing: before sanding, there is usually a wait of one to two days, exactly as stated in the technical data sheet.
- Sanding and finishing on site: several coats of lacquer or oil with drying time in between add further days.
With a factory-finished product, the floor is usually ready much sooner. With finishing on site and subfloor levelling, the whole process in a flat often stretches to one or two weeks. If the screed still has to dry, the schedule moves out further.
What affects the price
The guide labour price is €29.00 per m². This covers the laying and bonding only. The actual price will move away from it depending on these factors:
- Subfloor condition: a flat, dry screed in a single rectangular room is the simplest case for the fitter. An uneven, cracked or damp screed has to be ground, primed and levelled. These are charged as separate items and can noticeably raise the total per m².
- Room layout: alcoves, columns, many door frames and short walls mean many angled cuts. The labour increases considerably, in very irregular spaces by tens of percent compared with a simple room.
- Walls out of square: the edges must be cut irregularly and it is harder to set out the pattern so that it looks symmetrical.
- Continuous pattern through several rooms: without a threshold break, the axis has to be carried accurately through doorways and the hallway, which takes more time and precision.
- Floor area: in small rooms, setting out the axis and cutting the edges make up a larger share of the work, so the price per m² is higher than in a large living room.
- Sanding and finishing on site: unfinished parquet adds sanding, lacquering or oiling.
- Removing the old floor: taking up old floor coverings, removing old adhesive and disposing of waste are charged separately.
- Materials: the parquet and adhesive are added to the labour cost. Solid wood, exotic species and two-component adhesives cost more, and a higher cutting allowance also increases the amount of timber bought.
When comparing quotes, check whether the price includes moisture testing, priming, adhesive, edge cuts at the walls, skirting boards and threshold profiles, or whether these are separate items.
How to prepare the home before the floor fitter arrives
How well the site is prepared also affects the pace of work. The fitter works faster and more accurately when:
- the rooms are completely cleared and no other trades are working in them during bonding,
- wall decorating is finished so that no plaster or paint gets onto the new floor,
- the parquet is delivered in good time to acclimatise according to the manufacturer's instructions,
- there is power for tools and water available for cleaning,
- the pattern direction, room connections and floor height at the doors have been decided, so there is no waiting,
- with underfloor heating, the screed heating-up record is available,
- access to upper floors, for example a lift, and a place for waste are arranged.
Work is held up when plastering is still going on, a window is left open in winter, material arrives at the last minute or the pattern direction is changed during bonding. In a block of flats, check in advance with the managing agent or freeholder which hours are allowed for noisy work and whether the lease or building rules set requirements for impact sound insulation.
This is a difficult job for a DIYer. Without a mitre saw, a laser and experience of angled laying, the risk of a skewed pattern is high, and a repair usually means lifting part of the floor.
Typical mistakes and how they show later
Badly set-out axis. The arrows gradually drift away from the wall or are off-centre in the room. Across the whole floor it looks like a crooked floor, and it can only be fixed by lifting rows.
Bonding onto a damp or uneven subfloor. Voids form, strips sound hollow and work loose over time. Moisture from the screed can make the wood swell and the strip edges lift.
Unsuitable adhesive. A water-based or overly rigid adhesive cannot cope with timber movement. After the first heating season, gaps or loose strips appear.
Missing expansion gap. At walls and fixed obstacles, the floor can lift, especially in summer when humidity is higher.
No acclimatisation. The wood changes size after fitting and gaps open at the joints.
Adhesive open time exceeded. A strip is laid on adhesive that has skinned over and does not bond across its full surface. It then sounds hollow when tapped and may come loose over time.
Dust under the adhesive. The adhesive sticks to the dust, not to the screed. This shows as loose strips, often only after months.
Switching underfloor heating on too fast. The wood dries quickly, gaps open at the joints and cracks can appear.
Checking the finished floor at handover
At handover, walk the floor in daylight and also look at it from a distance, for example from the doorway. Check:
- that the arrows run straight in the agreed direction and the points sit on one line,
- that the joints at the points are tight, without visible gaps or height differences,
- that the strips do not sound hollow when tapped, which would indicate a void underneath,
- that the edges along the walls are symmetrical and free of narrow offcuts,
- that the expansion gap is covered by skirting and the skirting is fixed to the wall, not to the floor,
- that transitions to other floors are level and the profiles are firmly fixed,
- that the doors open without catching on the floor,
- that the finish has no marks, dust in the lacquer or missed areas,
- that you have received the subfloor moisture record, the type of adhesive used and care instructions,
- that you have a few spare strips from the same batch for any future repairs.
Frequently asked questions
Roughly €29.00 per m² for laying and bonding only. The price rises with subfloor levelling, an irregular layout, a continuous pattern through several rooms, removing the old floor, and sanding and finishing on site. Materials are charged separately.
Yes, if the parquet manufacturer explicitly states that it is suitable for underfloor heating. Engineered parquet is used most often, but thinner solid wood of a suitable species, typically oak, is also laid. Solid beech and maple react strongly to changes in humidity and are risky with underfloor heating. The whole floor build-up should have low thermal resistance - the figure is in the technical data sheet and the heating engineer should assess it. An elastic adhesive suitable for underfloor heating, a screed heated up according to a commissioning record and a gradual start-up of the heating after laying are also needed.
Careful walking is usually possible after one to two days. Full loading and furniture should wait until the adhesive and the finish have fully cured. The exact times are given by the manufacturer of the adhesive and of the lacquer or oil.
Not onto carpet, vinyl, linoleum or a floating floor - these must be removed. It can be bonded onto firmly fixed old tiles only if the adhesive manufacturer allows it and the fitter assesses, grinds and prepares the surface according to their instructions. Expect the floor level to be higher as well.
Yes, it can be sanded and re-lacquered or re-oiled. How many times depends on the thickness of the wear layer - solid wood allows the most refinishes.
Vacuum with a soft brush head, clean only with a lightly damp mop and a cleaner made for wooden floors, and put felt pads under furniture. A stable indoor humidity and mats at entrances also help.
Related work
How laminate and other floating floors are laid, what the subfloor needs, which underlay to choose and how to check the finished floor.
How a floating click timber floor is laid: subfloor preparation, underlay, the method, common mistakes and checking the finished floor.
How click vinyl flooring is laid: subfloor preparation, underlay, expansion gaps and trims. Common mistakes and how to check the finished floor.
How to fill the gap between skirting board and wall, when to use acrylic caulk or silicone, and what to check in the finished job.
How skirting boards are fitted, which material and fixing method to choose, and how to handle the expansion gap, corners and uneven walls.
How nailed and bitumen-bonded parquet is lifted, what makes the job harder, and how to clear bitumen residue and prepare the subfloor.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.