Building work price list: Floating Timber Floor Installation (Click/Clack)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Flooring cost | ||||
| Install click/lock engineered wood flooring | m² | €12.50 / m² | m² | enter quantity- |
| Remove old nailed/glued wood parquet flooring | m² | €12.00 / m² | m² | enter quantity- |
| Careful removal of old parquet to laying plan | m² | €5.10 / m² | m² | enter quantity- |
| Install laminate flooring | m² | €12.50 / m² | m² | enter quantity- |
| Install click vinyl flooring | m² | m² | - | |
| Full-bond solid/engineered wood flooring | m² | €12.00 / m² | m² | enter quantity- |
| Install underfloor heating (electric mat) | m² | m² | - | |
| Install parquet blocks | m² | m² | - | |
| Install Chevron parquet flooring | m² | m² | - | |
| Install and bond original parquet blocks (reclaimed/repaired) | m² | m² | - | |
| Sand and 3x lacquer parquet flooring | m² | m² | - | |
| Sand, fill and 3x lacquer parquet flooring (complete) | m² | €30.00 / m² | m² | enter quantity- |
| Install skirting boards | lm | €4.00 / lm | lm | enter quantity- |
| Caulking around skirting boards | lm | €1.90 / lm | lm | enter quantity- |
| Install transition strips | pcs | €8.00 / pcs | pcs | enter quantity- |
What a floating timber floor is and when to choose one
Installing a timber floor with a locking joint, usually called click or click/clack, means laying wooden boards on an underlay without adhesive. The boards click together and the floor "floats". It is not fixed to the subfloor, so it can expand and contract freely as the humidity in the air changes. Within flooring work it is one of the most common ways to lay real wood.
In most cases these are engineered boards with a top layer of solid wood, known as the wear layer. Beneath it is a core layer that stabilises the board, so it moves less than solid timber. On the surface, however, you have real wood with all its qualities: it feels warm underfoot, it ages and it can be refinished.
People choose it when renovating a flat or a house, when they want real wood on the surface but do not want to wait for adhesive to cure or deal with a complicated installation. It suits living rooms, bedrooms, children's rooms and studies. Compared with a glued-down timber floor, it can be walked on straight after laying and it can be taken up if you move. Compared with laminate flooring laid as a floating system, it is more sensitive to moisture and sunlight and shows scratches more, but it is real wood and, with a thick enough wear layer, it can be sanded.
What to decide before placing the order
With a timber floor, many things cannot be changed once it is down. It pays to settle them before buying the materials.
- Thickness of the wear layer: this decides whether, and how many times, the floor can be sanded later. The figure is in the technical data sheet, and more detail is given in the questions at the end of this article.
- Surface finish: a lacquered surface resists dirt better and is easier to keep clean. An oiled finish looks more natural and minor damage can be repaired locally, but it needs regular maintenance with oil.
- Underfloor heating: if you have it, both the flooring and the underlay must be explicitly approved for it by the manufacturer. For some species and thicker boards, the manufacturer does not allow underfloor heating. For timber, the floor surface temperature is usually limited to about 27 to 29 °C, but the manufacturer's figure is the one that applies.
- Laying direction: usually in the direction of the light from the window. The joints are then less visible and the room looks longer. In a long hallway, boards are usually laid lengthways.
- Transitions between rooms: decide whether you want a threshold strip in every doorway or one continuous surface. A continuous surface is only possible where the manufacturer allows it and under its conditions.
- Floor height: the board plus underlay will raise the floor. You need to know how this will meet the tiles in the bathroom and hallway and whether doors will need to be trimmed.
- Fixed furniture: kitchen units and fitted wardrobes are installed before the floor is laid, or the floor is finished around them with a gap. They do not belong on a floating floor.
- Quantity of material: add an allowance for cutting waste to the room area, usually 5 to 10 % for standard laying in a rectangular room and more for an irregular layout. Buy all the material at once from a single batch so the colour matches, and keep a few boards for later repairs.
In a flat, it is worth asking the managing agent or freeholder in advance whether the lease or building rules cover impact noise or noisy work. Replacing a floor covering on its own is routine work. If you were to alter the floor or ceiling structure, however, check the requirements with building control first.
Subfloor and underlay: what everything rests on
A click joint is precise, so it needs a flat, firm and dry subfloor. Manufacturers usually allow a flatness deviation in the order of a few millimetres over a length of one to two metres. Larger irregularities are ground down or levelled with self-levelling compound. A primer is applied before the compound so that it bonds well to the subfloor. The levelling compound must then dry, which takes days to weeks depending on its thickness.
Old carpet, vinyl or lino is normally removed before laying timber, along with any adhesive residue. A soft covering under a floating floor causes bounce and strains the joints. Firm, flat old tiles can usually stay, with deep grout lines filled. An old timber floor that flexes underfoot must be stiffened first.
On concrete or another mineral subfloor, a vapour barrier is needed, usually polythene sheeting with overlaps and taped joints, or an underlay with a built-in vapour barrier. On a timber subfloor, a vapour barrier is not usually used, but the manufacturer's instructions decide.
A new screed must be dry enough. The floor fitter measures the moisture, most often by the carbide method (CM), and the flooring manufacturer sets the limits according to the type of screed. As a guide, a cement screed should be at most around 2.0 CM-%, or around 1.8 CM-% with underfloor heating. For an anhydrite (calcium sulphate) screed, it is around 0.5 CM-%, or around 0.3 CM-% with heating. A heated screed is also put through a heating-up cycle according to a commissioning record before laying.
Underlays differ mainly in how well they reduce impact noise and how they even out small irregularities:
- Foam underlays are common, light and suitable for most dry rooms.
- Cork underlays reduce noise well, but on their own they offer no protection against moisture.
- Combination underlays combine sound insulation and a vapour barrier in one roll.
A thicker, softer underlay is not automatically better. If it is too soft, the boards flex and the joints are damaged sooner, which is why manufacturers often limit underlay thickness. With underfloor heating, the underlay must be designed for it, as an underlay that is too thick would hold back the heat unnecessarily.
Why timber needs space and stable humidity
Timber reacts to the humidity of the air. In summer, when the air is more humid, the boards swell slightly. In winter, with the heating on and dry air, they shrink. The engineered construction reduces this movement but does not eliminate it. That is why an expansion gap is left around the whole perimeter, covered by skirting boards fixed to the wall.
Timber flooring manufacturers state the conditions the floor should be kept in before, during and after laying. Typically this is a relative humidity of about 40 to 60 % and a temperature of around 18 to 24 °C. If the air in the home dries out below this range in winter, small gaps may appear between the boards and close again in spring. A humidifier and an inexpensive hygrometer help. Conversely, a persistently damp environment causes the boards to cup.
How the installation works step by step
- Acclimatisation: the boards should lie for several days, usually at least 48 hours, in the room where they will be laid, so the wood adjusts to the temperature and humidity. They mostly stay in unopened packs, and the manufacturer specifies the exact procedure.
- Subfloor check and room preparation: the floor fitter checks flatness with a straightedge, firmness and, on screed, moisture. Old soft coverings are removed and the subfloor is vacuumed.
- Vapour barrier and underlay: on a mineral subfloor, the sheeting is rolled out with overlaps and taped joints, then the underlay is laid with butted joints, without overlapping.
- Setting out the rows: following the agreed direction, the floor fitter measures the room and adjusts the width of the first row so the last row does not end up too narrow.
- Door frames: timber door linings and architraves are undercut to the height of the board plus underlay, so the floor can slide underneath.
- First row: this is laid along a straight wall. Spacers are placed between the board and the wall to hold the expansion gap. This is usually around 10 mm, and the exact figure is given by the flooring manufacturer.
- Joining the boards: each new board is angled into the long-side joint and lowered until it locks. Depending on the joint type, the end joints either click down from above or are gently tapped home using an offcut or tapping block, never directly against the edge of the board.
- Staggering the joints: end joints in adjacent rows are staggered, usually by at least 30 cm, so the floor is stable and no regular "ladder" pattern forms. Boards are mixed from several packs so the colour and grain are spread evenly.
- Obstacles: at radiator pipes, holes larger than the pipe are drilled, the cut-out piece is glued back in and the area is covered with pipe roses.
- Last row: this is cut to width while keeping the gap at the wall, and pulled tight.
- Finishing: the spacers are removed and skirting boards are fixed to the wall, with threshold strips at doorways and where the floor meets another covering.
On a prepared subfloor in a regular room, an experienced floor fitter lays roughly 20 to 40 m² a day. A flat with four rooms and a hallway therefore usually takes several days. Levelling the subfloor and its drying time come on top of that.
Price of laying a click timber floor per m²
The guide price for the labour is €12.50 per m². It applies to standard laying on a prepared, flat subfloor in a regular room. The actual price is mainly affected by these factors:
- Condition of the subfloor: an uneven or damp subfloor that first needs grinding, priming, levelling with self-levelling compound and drying is a separate job. With significant unevenness, preparation can cost about as much as the laying itself.
- Removing the old covering: taking up carpet, vinyl or lino and scraping off adhesive residue is charged separately, as is waste removal.
- Irregular layout: alcoves, chimney breasts, pillars and angled walls mean many cuts and more waste. The price per m² in such a room is noticeably higher than in a rectangular one.
- Radiator pipes: each pipe position is drilled, finished and covered with pipe roses, so it is often priced per piece.
- Number of doorways: at each doorway the door lining has to be undercut and a threshold strip fitted. Metal door frames cannot be undercut. The floor is cut up to them so that an expansion gap remains here too, filled with flexible sealant or covered with a profile. This is slower.
- Stairs and transitions to tiles at a different height need special profiles and precise work.
- Large areas: if the manufacturer requires them to be divided by an expansion profile, fitting it is added.
- Laying pattern: diagonal laying or a pattern means slower work and more cutting waste, so it costs more than straight laying.
- Small area: for a single small room, the floor fitter may charge a minimum call-out fee.
- Skirting boards: fitting them is usually a separate item priced per running metre.
When comparing quotes, check whether the price includes the vapour barrier and underlay, undercutting the door linings, trims and waste removal, or only the laying of the boards.
What makes the work easier and what slows it down
- Material delivered on time: the packs need to arrive several days in advance so they can acclimatise. If they arrive on the day of laying, the floor fitter has to wait or risk the wood moving after it is laid.
- Cleared rooms: laying in an occupied home, where furniture is moved from one half of the room to the other, makes the job much longer.
- Wet trades finished: plastering, skimming and screeding should be complete and dry, and ideally decorating is done too. Moisture from fresh plaster also gets into the wood.
- Stable temperature: in winter the room must be heated before the material is delivered, and with underfloor heating according to the manufacturer's instructions.
- Doors taken off: doors in the rooms should be removed beforehand so they are not in the way.
- Details decided: when the direction or transitions are only decided on site, work stops.
- Access and power: a working socket for the saw, space for cutting and somewhere to park while unloading the material.
Typical mistakes and how they show up later
No expansion gap. Timber moves. If it hits a wall, door frame or pipe, the floor lifts. In practice, the gap is often "eaten up" by a heavy wardrobe or a skirting board screwed down tight onto the floor.
A floating floor pinned down. Kitchen units or a fitted wardrobe placed on the boards weigh the floor down and stop it moving. The stress is then released elsewhere, joints open or the floor lifts.
An uneven subfloor. Boards over a dip flex, the joints are strained, and creaking and gaps appear.
Joints not fully engaged. A joint that has not fully locked will open over time. Tapping directly against the edge of the board damages the joint.
No vapour barrier on concrete. Moisture from the subfloor reaches the wood and the boards start to cup.
Laying on wet screed or without acclimatisation. The wood changes size after laying, gaps appear in the joints or the floor lifts. This often only shows after several weeks.
End joints too close together. The floor is less stable and the pattern looks like a regular ladder.
A last row that is too narrow. A narrow strip holds poorly in the joint, comes loose easily and looks wrong.
Timber in wet rooms. A floating timber floor is not normally laid in a bathroom or sauna. For such areas, click/clack floating vinyl flooring is often considered, within the limits set by its manufacturer.
How to check the finished floor
- the joints are closed along their full length and the boards do not spring up,
- the floor does not flex or creak when walked on,
- an expansion gap is kept along all walls, door frames and pipes, and at metal door frames it is filled with flexible sealant or covered,
- the skirting boards are fixed to the wall and do not press down on the floor,
- the threshold strips sit firmly and do not create a trip hazard,
- the end joints are staggered and do not form a regular pattern,
- the last row is not noticeably narrower than the others,
- the surface is free of scratches, chipped edges and marks from tapping,
- the pipe roses are fitted and the area around the pipes is neatly finished,
- the doors open freely and do not catch on the floor,
- you have received the leftover boards and the manufacturer's maintenance information.
DIY guide: what to watch for in a single room
A competent DIYer can lay a click floor in a dry, regular room. The procedure is the same as the floor fitter's work described above. You need a saw, a tape measure, a square, spacers, a rubber mallet and a tapping block, and a pull bar helps with the last row. Always read the manufacturer's instructions, as joint systems differ. Leave moving radiators and any work on pipework or wiring to professionals.
- Before laying, check flatness with a long straightedge in several places and level any irregularities rather than "hiding" them with a thicker underlay.
- To undercut a door lining, place an offcut of board on the underlay and saw along it as a guide, so the height is exactly right.
- Lay the first row facing the wall as the manufacturer's instructions specify. With most systems the tongue faces the wall, but some joints are laid the other way round.
- Assemble the first three rows, push them against the spacers and check they are straight. A crooked start cannot be corrected later.
- Use the piece cut off at the end of a row to start the next one, provided it is longer than the manufacturer's minimum length.
- Cut so that the face side does not splinter with the saw you are using. With a hand saw and a jigsaw the face usually needs to be oriented differently, so test it on an offcut.
- After each row, run your fingers along the joints and fix any joint that is not fully engaged straight away, not at the end.
- Fix the skirting boards to the wall, not to the floor, and remove the spacers before fitting them. Where the skirting meets the wall, the finishing details are covered under mastic and caulking around skirting boards.
Frequently asked questions
As a guide, €12.50 per m² for the laying alone on a prepared subfloor. The price rises with subfloor levelling, removal of the old covering, an irregular layout, pipes, many doorways and diagonal laying. Trims and materials are usually charged separately.
It depends on the thickness of the wear layer, which is commonly around 2.5 to 4 mm. With a layer of about 2.5 mm or more, the floor can generally be sanded at least once and re-lacquered or re-oiled, and with 3.5 to 4 mm several times. With a thinner layer, the surface is only refreshed without sanding. The exact figure is in the floor's technical data sheet.
Yes, if the flooring manufacturer explicitly allows it. What matters is a suitable underlay, a screed that has been dried and put through its heating-up cycle according to the commissioning record, and keeping to the maximum surface temperature mentioned in the section on decisions before ordering.
Yes, a floating floor is not glued, so there is no need to wait for anything to cure. Do not drag heavy furniture across it, though - lift and carry it.
With a click joint, the floor can be taken up from the wall to the damaged area and the board replaced. It helps to have a few spare boards from the same batch so the colour matches.
Regular vacuuming and wiping with a well wrung-out cloth and a cleaner designed for wood is enough. Put felt pads under furniture legs and do not leave larger amounts of water standing on the floor.
Related work
How laminate and other floating floors are laid, what the subfloor needs, which underlay to choose and how to check the finished floor.
How click vinyl flooring is laid: subfloor preparation, underlay, expansion gaps and trims. Common mistakes and how to check the finished floor.
How to fill the gap between skirting board and wall, when to use acrylic caulk or silicone, and what to check in the finished job.
How skirting boards are fitted, which material and fixing method to choose, and how to handle the expansion gap, corners and uneven walls.
How nailed and bitumen-bonded parquet is lifted, what makes the job harder, and how to clear bitumen residue and prepare the subfloor.
How to lift old parquet without damage, mark every block to a laying plan, then clean and store it so it can be relaid later.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.