Building work price list: Installation and Bonding of Wooden Parquet Blocks
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Flooring cost | ||||
| Install parquet blocks | m² | €25.00 / m² | m² | enter quantity- |
| Remove old nailed/glued wood parquet flooring | m² | €12.00 / m² | m² | enter quantity- |
| Careful removal of old parquet to laying plan | m² | €5.10 / m² | m² | enter quantity- |
| Install laminate flooring | m² | €12.50 / m² | m² | enter quantity- |
| Install click vinyl flooring | m² | m² | - | |
| Install click/lock engineered wood flooring | m² | €12.50 / m² | m² | enter quantity- |
| Full-bond solid/engineered wood flooring | m² | €12.00 / m² | m² | enter quantity- |
| Install underfloor heating (electric mat) | m² | m² | - | |
| Install Chevron parquet flooring | m² | m² | - | |
| Install and bond original parquet blocks (reclaimed/repaired) | m² | m² | - | |
| Sand and 3x lacquer parquet flooring | m² | m² | - | |
| Sand, fill and 3x lacquer parquet flooring (complete) | m² | €30.00 / m² | m² | enter quantity- |
| Install skirting boards | lm | €4.00 / lm | lm | enter quantity- |
| Caulking around skirting boards | lm | €1.90 / lm | lm | enter quantity- |
| Install transition strips | pcs | €8.00 / pcs | pcs | enter quantity- |
What bonding parquet blocks involves and when it is needed
Parquet blocks are solid timber pieces with a tongue and groove. The floor layer bonds them with adhesive across the whole surface, not just in spots. This is one of the more demanding jobs in flooring work. The timber is firmly fixed to the subfloor, unlike a floating laminate floor or a floating click timber floor. A bonded floor does not sound hollow underfoot, has a solid feel and can be sanded several times over its life.
This work is typical in new builds, in a full floor renovation, or when the original parquet in an older flat or house is to be saved. Both new blocks and reclaimed original blocks can be bonded. Original blocks are first lifted and cleaned.
Bonding is only one step towards a finished floor. Sanding, filling and finishing with lacquer, oil or wax follow. These are often priced as separate items, so it is worth checking exactly what each quote includes.
New or original blocks: the difference
New blocks arrive from the supplier at a uniform thickness and moisture content. Solid parquet blocks are usually about 14 to 22 mm thick. A thicker block can be sanded more times over the life of the floor. A thinner block suits underfloor heating better, as it lets heat through more easily. Oak is the most common choice, followed by beech and ash. Hard tropical species are offered less often. Beech looks good but reacts more to changes in humidity and moves more, so it is less suitable for heated floors.
Original blocks are carefully lifted during restoration, cleaned of old adhesive or bitumen, sorted, and damaged pieces are replaced. Parts of the tongue or groove are often broken, and some blocks are already too thin after earlier sanding. The work is slower and the result depends on the condition of the timber. The benefit is that the original character of an older property is kept.
If old blocks are laid in black bitumen adhesive, have it tested before any work starts. Older black adhesives can contain harmful substances, including asbestos or coal tar, and removal is a job for specialists. Do not sand or strip it yourself.
Decisions to make before ordering the work
With a bonded floor, many things cannot be changed once it is laid. It pays to have them settled before the floor layer arrives.
- Species and block thickness: choose according to whether there is underfloor heating and how many sandings the floor should withstand. Block thickness plus adhesive also sets the floor height at doors and thresholds.
- Pattern: straight or brick bond in rows, herringbone, double herringbone or basket weave (chequerboard). The pattern decides the number of cuts, the amount of waste and the labour time.
- Laying direction: usually along the longer wall or in the direction of light from the window. If the floor runs through several rooms, agree in advance whether it will be continuous or divided.
- Underfloor heating: affects the choice of species, block thickness and adhesive, and lengthens subfloor preparation.
- Finish: lacquer forms a hard-wearing surface layer. Oil and wax give a more natural look but need more regular maintenance. The finish is applied after bonding, but it is worth knowing in advance who will sand and finish the floor and when.
- Restoration or new blocks: with an old floor, ask the floor layer to assess a few sample blocks, the wear layer above the tongue and the condition of the joints. Only then is it clear whether restoration is worthwhile.
Subfloor preparation and acclimatisation of the timber
A bonded floor is only as good as the screed beneath it. The screed must be sound, must not crumble or dust, and must be flat. A deviation of about 2 mm under a 2 m straightedge is commonly given as the maximum. Flatness matters even more with herringbone, as every unevenness shows at the joints.
The key factor is the residual moisture of the screed, measured with the CM (calcium carbide) method. For sand and cement screed, a limit of about 2 CM % is usually given, and about 0.5 CM % for calcium sulphate (anhydrite) screed. With underfloor heating, adhesive manufacturers often require even lower values. In the UK, moisture is also commonly checked with a hygrometer (relative humidity) test. The adhesive manufacturer states which method and limit apply. If the screed is damp, the timber absorbs the moisture and the floor can lift or debond. A screed that looks dry can still be damp inside, so "it has been long enough" is not a reliable test.
Unevenness is corrected with a self-levelling compound. The subfloor is primed before and after levelling, as recommended by the adhesive manufacturer. Primer strengthens the surface and improves adhesion. Finally, the subfloor is thoroughly vacuumed.
With underfloor heating, the screed must go through a commissioning (heating-up) cycle before laying, which dries and tests it. Ask for the written record of this cycle. Without it, the floor layer should not start. After laying, the heating is brought up gradually, a few degrees a day. The floor surface should not exceed about 27 °C. The exact values are set by the parquet and heating manufacturers.
The blocks should be left in the room for at least 48 hours, ideally several days, at about 18 to 22 °C and a relative humidity of about 45 to 60 %. The room should no longer hold construction moisture from plastering or screeding.
How parquet blocks are bonded step by step
Before bonding, the floor layer prepares a setting-out plan: the laying direction, the starting line and how the pattern continues between rooms.
- Subfloor check: the floor layer checks the screed strength, measures flatness with a straightedge and moisture with a meter.
- Subfloor preparation: old adhesive residues and dirt are removed, the subfloor is primed, levelled with compound if needed and primed again. It is then vacuumed.
- Setting out and starting line: a centre line is marked on the subfloor, from which the pattern starts, so it is symmetrical and no narrow slivers are left at the walls.
- Undercutting door linings: timber door linings and architraves are undercut so the blocks slide beneath them and do not need to be scribed tightly around them.
- Spreading the adhesive with the notched trowel specified by the adhesive manufacturer, only over the area that can be covered while the adhesive is workable.
- Laying the blocks into fresh adhesive according to the setting-out plan, tapping them home with a tapping block so the edges are not damaged.
- Expansion gap: a gap of usually about 10 to 15 mm is left at the walls using spacers.
- Ongoing checks of flatness, straightness of rows and tightness of joints.
- Cutting in the edge pieces at walls, door linings and pipes.
- Adhesive curing: the floor is left undisturbed. Light foot traffic is usually possible after 12 to 24 hours, and sanding normally starts after 48 to 72 hours, depending on the adhesive.
Solid parquet blocks are mainly bonded with polyurethane adhesives, often two-part (2K PU), as well as MS polymer and silane-modified adhesives. More flexible types cope better with timber movement and suit underfloor heating. Dispersion (water-based) adhesives contain water that can swell the timber. They are used for solid blocks only where the manufacturer expressly approves them for that format and species.
After curing, the floor is sanded in several stages, the joints are filled with a filler mixed with sanding dust, and the surface is finished with lacquer, oil or wax.
When restoring original blocks, bonding is preceded by careful lifting, cleaning the tongue, groove and underside of old adhesive or bitumen, sorting by thickness and condition, and making up missing pieces. Bonding can only start on a cleaned and prepared subfloor.
Price of laying parquet blocks per m²: what affects it
The guide labour price is €25.00 per m². The actual price may differ depending on how demanding the particular floor is.
- Pattern: laying in straight rows is the simplest. Herringbone, double herringbone or basket weave need precise setting out, more cuts and more time, so they cost considerably more than straight rows.
- New or original blocks: restoration adds lifting, cleaning, sorting and making up pieces. Re-bonding original blocks is therefore usually more labour-intensive than bonding new ones, especially where tongues are broken or bitumen residue remains.
- Subfloor condition: a flat, dry screed needs only priming. An uneven subfloor that needs levelling, or old adhesive that must be removed, will raise the price. Levelling and priming are often separate items.
- Room layout: alcoves, columns, many door linings, pipes and thresholds mean more cutting. In a small, awkward room the labour per m² works out higher than in a large rectangular one.
- Species: hard tropical timbers are harder to cut and blunt tools faster, which lengthens the job.
- Underfloor heating: stricter screed moisture limits, a suitable flexible adhesive and more thorough preparation can raise the price slightly.
- Size of the job: on a very small area, preparation and travel weigh more heavily in the price, so some floor layers charge a minimum call-out fee.
The bonding price usually excludes materials, i.e. the blocks and adhesive, as well as sanding, filling and finishing. When comparing quotes, ask for an itemised breakdown of what each item includes.
Preparing the site so the start date does not slip
A floor layer who arrives at a damp or inaccessible site has to leave and come back later. Before arrival, the following should be in place:
- Wet trades are finished and dry: plastering, skimming and screed. Decorating is usually done before bonding, or at least the first coat.
- Windows and external doors are fitted, so a steady temperature and humidity can be kept in the room.
- The room is cleared and the blocks can be stored for several days without getting in the way of other trades.
- Power and water are available for tools and for mixing the levelling compound.
- It is clear which door linings and doors will stay and what the height of the other floors will be, so thresholds can be resolved straight away.
- Nobody walks on the floor after bonding and other trades wait until the adhesive has cured.
In a flat, check the building rules and your lease. Many leases require the freeholder's or managing agent's consent for hard floors, often with sound insulation conditions. Sanding and cutting are noisy, so agree suitable working hours with the managing agent or neighbours. Replacing a floor covering does not usually need approval, but for changes to the floor structure, check the approach with local authority building control.
Recurring mistakes and how they show later
- Bonding to screed without measuring moisture: the timber absorbs moisture from below, the blocks cup, edges lift or the floor debonds in places. This often shows only after weeks.
- Skipping the primer: a dusty screed surface weakens adhesion. The blocks later come loose, taking a thin layer of screed with them.
- Missing or filled expansion gap at the walls: timber expands in more humid air, and if it has nowhere to move, the floor lifts.
- Uneven adhesive coverage: hollow spots remain under the blocks, which knock or creak underfoot.
- Skipping acclimatisation: the timber keeps adjusting to the room after laying and gaps open at the joints.
- Bridging movement joints in the screed: if blocks are bonded continuously across a joint in the subfloor, screed movement can tear them apart. On large areas and between rooms, movement joints and trims are handled according to the adhesive and parquet manufacturers' instructions.
- Bringing underfloor heating up too fast: rapidly heated timber dries quickly, cracks and wider gaps open between blocks.
- Sanding before the adhesive has cured: the blocks still move under the sander, the surface is not flat and joints can loosen.
Checking the finished work at handover
Before sanding and after completion, walk the floor and check that:
- the blocks do not move underfoot and do not sound hollow when tapped,
- edges are not lifted and joints are tight,
- the pattern is regular and rows are straight, also when viewed at an angle against the light,
- the pattern continues between rooms and there are no very narrow pieces at the walls,
- the perimeter expansion gap is clear, free of adhesive and debris,
- blocks are neatly cut around pipes and door linings,
- thresholds between rooms are finished with a trim or movement joint,
- no adhesive residue is left on the surface of the blocks,
- the contractor has given you a record of the measured subfloor moisture and the adhesive used,
- with underfloor heating, the heating start-up procedure is written down,
- you know when the floor can be walked on and when it can be sanded.
Where a solid bonded floor is not practical, alternatives include floating click vinyl flooring, which needs less subfloor preparation but cannot be sanded.
Frequently asked questions
The guide price is €25.00 per m². A complex pattern such as herringbone or basket weave, restoration of original blocks, an uneven subfloor and an awkward room layout will raise the price. Materials, sanding and finishing are usually separate items.
Yes, if it is sound, dry, flat and clean. An old screed must be checked, old adhesive residues removed, and it may need levelling and priming.
Yes, with a suitable species, most often oak, thinner blocks, a flexible adhesive and a thoroughly dried screed. After laying, the heating is brought up slowly and gradually.
Bonding a typical room usually takes one to two days. Add the acclimatisation of the timber beforehand and the curing of the adhesive before sanding.
Sanding normally starts 48 to 72 hours after bonding, depending on the adhesive. Joint filling and finishing with lacquer, oil or wax follow.
If most blocks are thick enough and undamaged, it often is, especially in older properties with an attractive pattern. If the blocks are thin after many sandings or ruined by damp, new blocks are the more sensible choice.
It is demanding work where screed moisture testing, the right adhesive and precise laying are decisive. A bonding fault cannot be put right later without tearing up the floor. Complex patterns, underfloor heating and old blocks in bitumen adhesive are jobs for professionals.
Related work
How laminate and other floating floors are laid, what the subfloor needs, which underlay to choose and how to check the finished floor.
How a floating click timber floor is laid: subfloor preparation, underlay, the method, common mistakes and checking the finished floor.
How click vinyl flooring is laid: subfloor preparation, underlay, expansion gaps and trims. Common mistakes and how to check the finished floor.
How to fill the gap between skirting board and wall, when to use acrylic caulk or silicone, and what to check in the finished job.
How skirting boards are fitted, which material and fixing method to choose, and how to handle the expansion gap, corners and uneven walls.
How nailed and bitumen-bonded parquet is lifted, what makes the job harder, and how to clear bitumen residue and prepare the subfloor.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.