Building work price list: Mastic and Caulking Around Skirting Boards
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Flooring cost | ||||
| Caulking around skirting boards | lm | €1.90 / lm | lm | enter quantity- |
| Remove old nailed/glued wood parquet flooring | m² | €12.00 / m² | m² | enter quantity- |
| Careful removal of old parquet to laying plan | m² | €5.10 / m² | m² | enter quantity- |
| Install laminate flooring | m² | €12.50 / m² | m² | enter quantity- |
| Install click vinyl flooring | m² | m² | - | |
| Install click/lock engineered wood flooring | m² | €12.50 / m² | m² | enter quantity- |
| Full-bond solid/engineered wood flooring | m² | €12.00 / m² | m² | enter quantity- |
| Install underfloor heating (electric mat) | m² | m² | - | |
| Install parquet blocks | m² | m² | - | |
| Install Chevron parquet flooring | m² | m² | - | |
| Install and bond original parquet blocks (reclaimed/repaired) | m² | m² | - | |
| Sand and 3x lacquer parquet flooring | m² | m² | - | |
| Sand, fill and 3x lacquer parquet flooring (complete) | m² | €30.00 / m² | m² | enter quantity- |
| Install skirting boards | lm | €4.00 / lm | lm | enter quantity- |
| Install transition strips | pcs | €8.00 / pcs | pcs | enter quantity- |
What caulking along skirting boards is and when it is done
After a new floor is laid and the skirting is fitted, a thin gap almost always remains between the skirting and the wall. Walls are never perfectly flat, so the board does not sit tight in places, which leaves a shadow line or a gap that collects dust. Caulking fills this gap with a flexible acrylic caulk. The joint is smoothed and painted over if required. It is done after new flooring, after skirting is replaced, or during redecoration when old joints have cracked. It is usually the finishing step of flooring work.
The main reason is appearance. Skirting with a filled top joint looks like part of the wall, uneven plaster disappears and the line around the room is clean. The second reason is practical. Dust, grit from shoes and small insects get into an open gap, and a vacuum cleaner struggles to get them out.
Which joint is caulked and which is left open
As a rule, only the top joint between the skirting and the wall is caulked. With a floating floor, such as laminate flooring laid as a floating system, click vinyl flooring or floating timber boards, the joint between the skirting and the floor is not sealed. The floor must move freely as temperature and humidity change, and caulk would tie it to the skirting. In practice this ends in torn caulk or a lifted skirting board.
With tiled floors and tiled skirting, or with bonded floors, the situation is different. The joint between the skirting tile and the floor tile is a perimeter movement joint that separates the floor from the wall and must stay flexible. That is why it is not filled with rigid grout like the other tile joints, but with silicone. In bathrooms, kitchens and anywhere water may splash, a sanitary silicone is used. Acrylic caulk does not belong here, because it is not flexible enough for a movement joint and does not tolerate water in the long term.
What to decide before work starts
The caulking itself is quick, but a few decisions determine how the joint will look.
- Whether to caulk the whole room or only where a gap is visible. With white skirting and a white wall, the whole perimeter is usually caulked so the line looks uniform. With timber skirting, often only the places with a visible gap are filled.
- Colour of the caulk. White caulk suits white skirting and light walls. Next to a coloured wall it is either painted with the wall colour or a tinted caulk is chosen. For wood-effect skirting, a caulk in a similar shade is used.
- Order with decorating. The cleanest result comes when the wall is painted, the joint is caulked and the dry caulk is finally painted with the wall colour. If painting is done after caulking, the caulk must be fully dry and the decorator has to cut in precisely along the skirting.
- Who paints over the joint. It is worth agreeing in advance whether the person caulking or the decorator does this. It is a separate step once the caulk has dried.
Acrylic caulk or silicone at skirting: what goes where
Acrylic caulk and silicone look similar in the tube, but each suits a different job.
- Acrylic caulk has only limited flexibility and copes with small joint movements. It can be painted, bonds well to plaster, plasterboard, timber and painted plastics, and smooths easily with water. It is intended for dry rooms: living rooms, bedrooms, hallways.
- Sanitary silicone is more flexible and handles water better, but normally cannot be painted. It belongs where the floor next to the skirting is mopped wet very often or where water can splash, for example in bathrooms, utility rooms or next to a shower.
Acrylic caulk is therefore not a waterproof barrier. It withstands normal mopping, but standing water will soften it over time. If the skirting is oiled timber or wood-effect plastic, white caulk will show. In that case a caulk in a suitable shade is chosen, or only genuinely visible gaps are filled.
Neither acrylic caulk nor paint will stick to silicone, even once it has fully cured. If the joint was previously sealed with silicone, it must be removed thoroughly before caulking, including the thin film left on the wall and the skirting.
How to fill a wide gap at the skirting
Acrylic caulk should not be applied in a thick bead. It shrinks slightly as it dries, so a thick "sausage" of caulk often sinks or cracks. Narrow gaps up to about 5 mm are filled directly with caulk. For wider and deeper gaps, a foam backer rod is pushed into the gap first.
The backer rod is chosen slightly thicker than the gap so that it holds firmly once pressed in and does not fall out. It has a second job: caulk does not stick to it, so the caulk bonds only to the wall and the skirting, not to the back of the joint. Caulk bonded this way can stretch freely with small movements. If it bonded on three sides, it would tear at the first movement of the skirting or the wall.
How caulking is done step by step
- Check the skirting: make sure the skirting is firmly fixed and does not move when pressed. Loose sections, often with clip-on skirting, are refixed or glued.
- Remove old caulk: cracked or detached caulk, silicone residue and flaking paint are cut out with a knife.
- Clean: the joint is vacuumed and wiped with a slightly damp cloth. It must be dry and dust-free before caulking.
- Mask: with dark skirting, a coloured wall or where a very sharp line is required, masking tape is applied to the wall and the skirting right next to the joint.
- Fill wide gaps: foam backer rod is pressed into gaps wider than about 5 mm.
- Apply the caulk: caulk is run from the gun in a steady bead over shorter sections.
- Smooth: the joint is tooled straight away to a slightly concave profile and the excess is wiped off with a damp sponge.
- Remove the tape: the tape is pulled off while the caulk is still wet, so it does not tear the dried edge.
- Drying: the caulk dries according to the manufacturer's data, usually from a few hours to a day.
- Painting: if agreed, the dry joint is painted with the wall or skirting colour.
Price of skirting caulking per running metre: what it depends on
Caulking is priced per running metre, that is by the length of skirting, not by floor area. Work out the length as the room perimeter minus the width of the doors. A 3 × 4 m room has a perimeter of 14 m, so after deducting the door about 13 m of joint remains. For a whole flat or house, add the lengths of the individual rooms, including hallways and landings, where there tend to be many short runs.
The guide price for labour is €1.90 per running metre. The final figure may differ depending on these factors:
- Condition of the old joint: new skirting against a new wall is the quickest case. Cutting out old caulk, silicone or flaking paint can double the time on that section.
- Flatness of the wall: on an uneven wall the gap is several millimetres wide in places. The caulk is applied in two passes or with backer rod, which increases time and material.
- Room layout: every corner, door frame, recess and heating pipe means breaking the bead and joining it neatly. A hallway with many doors costs more per metre than a large living room with straight walls.
- Colour contrast and precision: dark skirting against a light wall, or a coloured wall against white skirting, requires masking tape and slower work.
- Type of sealant: wood-tone caulk or sanitary silicone for wet areas is usually more expensive than standard white caulk.
- Painting over: this is an extra step with another visit or waiting for drying, so it is often charged separately.
- Small jobs: for a single room or a few metres, a tradesperson may charge a minimum call-out fee, because travel and setup take the same time as for a larger job.
When comparing quotes, it is worth asking whether the price includes cutting out old caulk, materials, masking tape and painting over.
What to prepare before the tradesperson arrives
- Move furniture away from the walls. If the tradesperson has to move wardrobes and sofas, the work takes longer and a section behind furniture may be left unfilled.
- Vacuum along the skirting. Dust and grit near the skirting will get into the joint and onto the wet caulk.
- Keep the heating on. In a cold, damp room the caulk dries more slowly and the wait before painting is longer.
- Agree timing with the decorator. If the decorator comes after the caulking, they need to know when the caulk will be dry.
- Leave the joints alone afterwards. Until the caulk has dried, do not mop near the skirting and keep pets and children away from it.
Common mistakes and how they show up later
- Caulking onto dust or damp. The caulk only bonds to the surface dirt and comes away after a few weeks.
- Too much caulk at once. A thick bead dries slowly, cracks, and the joint looks like squeezed paste rather than a clean transition.
- A wide gap without backer rod. The caulk sticks to the back of the joint, sinks and cracks down the middle at the first movement.
- Caulk not smoothed. Lumps, stop marks from the gun and a rough surface that holds dirt remain.
- Caulking loose skirting. The caulk tears off at the first knock from a vacuum cleaner or chair leg, leaving a gap bigger than before.
- Acrylic caulk in wet areas. Near a shower or bath it softens, turns black and falls away.
- Acrylic caulk over old silicone. The new caulk does not bond to silicone residue and peels off in strips over time.
- Rigid grout at tiled skirting. The perimeter joint loses its flexibility and cracks appear over time.
- Painting before the caulk is dry. Paint on fresh caulk cracks and leaves blotches on the joint.
- Tape removed after drying. It tears the edge of the caulk and leaves a ragged, uneven line.
How to check the finished work
Inspect the finished joint in side lighting, for example with a torch placed on the floor. This shows every irregularity. At handover, check these points:
- The joint is filled along its full length with no breaks or holes.
- The surface of the caulk is smooth, of even width and free of lumps.
- There are no dried smears of caulk on the skirting or the wall.
- In corners and at door frames the beads join neatly.
- The caulk is bonded on both sides and does not lift when pressed with a finger.
- The bottom joint at a floating floor has been left open.
- Silicone has been used in the bathroom and at tiled skirting.
- The painted joint has an even colour without cracks.
- The floor and surroundings are free of caulk and paint.
DIY guide: caulking the joint along skirting
This job can be done yourself following the steps above. You need a caulking gun, a tube of decorator's caulk, a knife, masking tape, a damp sponge, a container of water and, for wide gaps, foam backer rod. For DIY work, these details make the difference:
- Work in a warm room. Acrylic caulk is generally applied at temperatures from +5 °C, some products need more, and the exact figure is on the tube. The caulk must not freeze until it has dried.
- Practise the bead first in a less visible place, for example behind a door.
- Cut the nozzle at an angle, and cut less rather than more. The opening can always be enlarged, but not reduced.
- Hold the gun at a constant angle and draw it evenly without stopping, over a section of about one to two metres.
- Smooth with a wet finger or a plastic tool in a single pass, not by going back and forth repeatedly.
- Wipe off excess with a damp sponge straight away, as dried caulk can only be scraped off.
- In corners, join onto the previous bead while it is still wet.
- Paint only once the caulk is fully dry according to the manufacturer's data.
Frequently asked questions
The guide price for labour is €1.90 per running metre. Expect to pay more where old caulk must be cut out, on uneven walls with wide gaps, in rooms with many corners and door frames, and if the joints are also to be painted.
With a floating floor, no - the floor must move freely under the skirting. With tiled skirting, it is a movement joint filled with silicone, and in wet rooms with sanitary silicone.
It depends on the manufacturer, the thickness of the bead and the room temperature. The surface usually skins within minutes, but painting normally has to wait from a few hours to a day. The exact time is stated on the tube.
Most often the bead was too thick, the surface was not clean, or the joint moves significantly, for example with new plaster. Cracked caulk should be cut out and replaced, with backer rod in a wide gap.
Yes, but white caulk shows on natural wood. A caulk in a similar shade is chosen and the bead is kept very narrow, often with masking tape. If the gap is minimal, it is sometimes better not to caulk it at all.
Fresh caulk can be wiped off with a damp sponge and the bead repeated. Dried caulk has to be cut out with a knife, the joint cleaned and caulked again.
Along the skirting, mop with a damp, well wrung-out mop and do not leave water standing there. When vacuuming, avoid knocking the nozzle directly into the joint. If the caulk comes away somewhere, only that section needs repairing.
Related work
How laminate and other floating floors are laid, what the subfloor needs, which underlay to choose and how to check the finished floor.
How a floating click timber floor is laid: subfloor preparation, underlay, the method, common mistakes and checking the finished floor.
How click vinyl flooring is laid: subfloor preparation, underlay, expansion gaps and trims. Common mistakes and how to check the finished floor.
How skirting boards are fitted, which material and fixing method to choose, and how to handle the expansion gap, corners and uneven walls.
How nailed and bitumen-bonded parquet is lifted, what makes the job harder, and how to clear bitumen residue and prepare the subfloor.
How to lift old parquet without damage, mark every block to a laying plan, then clean and store it so it can be relaid later.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.