Building work price list: Parquet Sanding, Filling, and 3x Varnishing
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Flooring cost | ||||
| Sand, fill and 3x lacquer parquet flooring (complete) | m² | €30.00 / m² | m² | enter quantity- |
| Remove old nailed/glued wood parquet flooring | m² | €12.00 / m² | m² | enter quantity- |
| Careful removal of old parquet to laying plan | m² | €5.10 / m² | m² | enter quantity- |
| Install laminate flooring | m² | €12.50 / m² | m² | enter quantity- |
| Install click vinyl flooring | m² | m² | - | |
| Install click/lock engineered wood flooring | m² | €12.50 / m² | m² | enter quantity- |
| Full-bond solid/engineered wood flooring | m² | €12.00 / m² | m² | enter quantity- |
| Install underfloor heating (electric mat) | m² | m² | - | |
| Install parquet blocks | m² | m² | - | |
| Install Chevron parquet flooring | m² | m² | - | |
| Install and bond original parquet blocks (reclaimed/repaired) | m² | m² | - | |
| Sand and 3x lacquer parquet flooring | m² | m² | - | |
| Install skirting boards | lm | €4.00 / lm | lm | enter quantity- |
| Caulking around skirting boards | lm | €1.90 / lm | lm | enter quantity- |
| Install transition strips | pcs | €8.00 / pcs | pcs | enter quantity- |
What a full parquet restoration includes and when it is worth it
In a full restoration, the floor sander sands away the old varnish together with any surface damage, fills the gaps and applies three coats of varnish: a base coat and two top coats. The result is a floor that looks almost new while the original wood stays in place. This work is one of several jobs covered under flooring work.
The work is suitable when the parquet:
- is scratched, dull or yellowed,
- has gaps between the blocks where dirt collects,
- has varnish worn through in the busiest areas, for example by the door or in front of the sofa,
- but the wood is still sound and firmly fixed to the subfloor.
What to decide before booking the work
Full restoration or just sanding and varnishing?
The price list contains two related items. The full restoration includes sanding, filling of the whole surface and three coats of varnish. The item "Parquet sanding with varnishing" is mainly used when the parquet is in reasonable condition, has no significant gaps and only needs sanding and varnishing. The extent of filling and the number of coats vary between quotes, so ask exactly what is included before you book.
Which option you need depends on the condition of the floor:
- old solid parquet with gaps and deeper scratches almost always needs the full job with filling,
- a less worn floor without gaps can manage with sanding and varnishing,
- in a hallway, kitchen or office it is worth insisting on more coats of varnish even with the simpler option.
Can your floor be sanded at all?
The deciding factor is the thickness of wood above the tongue, which is the layer that can be sanded away. Traditional solid parquet usually withstands several restorations. Mosaic parquet is also solid wood, just made of thinner and smaller fingers, so it usually takes several sandings too, but it has to be sanded carefully. Engineered floors with a thin wear layer can only be sanded with care and sometimes not at all. Neither laminate nor vinyl can be sanded - for these surfaces the usual route is replacement, for example laminate flooring installation as a floating system or click vinyl flooring installation. The floor sander can check the thickness, for example after removing a skirting board or a threshold strip where the profile of the board is visible.
Which varnish to choose
Water-based varnishes (often called lacquers in the trade) are now the most common choice for homes. They have little odour, dry quickly and are also suitable for children's rooms. They come as one-component and two-component products. Two-component varnishes with a hardener resist wear better, so they are chosen for hallways, busy living rooms or offices. Solvent-based varnishes are hard-wearing but smell more and need thorough ventilation, and they are used less and less in homes.
Which sheen
- matt looks natural and shows scratches and dust the least,
- satin is an all-round compromise for most rooms,
- gloss brings out the grain of the wood, but every mark on it stands out.
Varnish or oil
Oil is an alternative to varnish. It keeps the natural feel of the wood and can be repaired locally, but it needs regular maintenance. Varnish forms a durable surface layer that is harder to repair when damaged, but it lasts longer without maintenance. With oil there is one important safety rule: oil-soaked rags can ignite spontaneously, so after work they should be laid flat outdoors to dry or stored in a sealed container of water. Fine sanding dust collected in the sander's dust bag can be equally dangerous and should not be left inside the home or near a heat source. If you have underfloor heating, ask the floor sander about a flexible filler and a varnish the manufacturer recommends for this purpose.
Skirting boards and thresholds
Skirting boards must be removed before sanding. Agree in advance who removes them, whether the original ones go back after the work or new ones are bought, and who fits them. Old skirting often breaks during removal.
How the work proceeds step by step
Before starting, the room has to be cleared: furniture, rugs and skirting boards. The floor sander then checks the condition of the floor, looking for loose blocks, creaking or signs of moisture. These areas need repairing before sanding, otherwise the problem is simply hidden under the new varnish.
- Repairs: loose blocks are glued down, missing ones replaced and protruding nails punched below the surface so they do not tear the abrasive paper.
- Coarse sanding: a large belt or drum sander removes the old varnish and levels out height differences between the blocks.
- Edges and corners: finished with a smaller edging sander where the large machine cannot reach.
- Filling: a binder is mixed with the sanding dust from your own floor and the mixture is spread over the whole surface with a trowel. This gives the filler almost the same shade as the wood.
- Fine sanding: once the filler is dry, the surface is sanded again, often with a rotary sander. Excess filler is removed and the surface evened out.
- Vacuuming: the floor is thoroughly vacuumed so that no dust particles end up in the varnish.
- Base coat: seals the pores of the wood and prepares it for the following coats.
- Denibbing: once dry, the surface is lightly sanded with a fine mesh to remove raised grain.
- Two top coats of varnish: the drying time between them follows the manufacturer's instructions.
- Finishing: once the varnish has cured, skirting boards and thresholds are fitted, if this was part of the agreement.
Sanding is done in several passes from coarse to fine grit. If the floor sander skips a grit, the scratches from the coarse paper stay in the wood and the varnish makes them even more visible.
What the price depends on
The guide price for the work is €30.00 per m². The actual amount can move up or down depending on the condition of the floor:
- Layers of old varnish: each additional layer of old, hard or yellowed varnish means another pass with coarse grit and more abrasive paper. Hard old varnishes clog the paper quickly, so it has to be changed more often.
- Gaps and blocks: wide gaps need more filler and sometimes repeated filling. Loose or missing blocks are usually charged separately, per piece.
- Water damage and uneven subfloor: such areas have to be repaired before sanding. If a larger part of the floor needs replacing, that becomes a separate job.
- Wood species: hardwoods such as oak or ash sand more slowly and use more abrasive paper than softer wood.
- Type of floor: with mosaic parquet the grain runs in different directions, so more fine sanding is needed to avoid cross-grain scratches. Thin engineered parquet is sanded slowly, removing very little material.
- Room shape: rooms with many corners, alcoves and doorways mean more work with the edging sander, which is slow.
- Floor area: on a small area, preparation and machine transport are spread over fewer square metres, so the price per m² tends to be higher. A larger continuous area brings the price per m² down.
- Varnish: two-component and premium heavy-duty varnishes cost more than standard one-component products. More than three coats also increases the price.
- Additional work: removing and refitting skirting, repairing thresholds, moving furniture or varnishing stairs are often charged separately.
When comparing quotes, ask how many coats of varnish are included, whether the whole surface is filled or just the gaps, which varnish will be used and whether skirting is included.
Preparing the home for parquet sanding
- Empty room: if the room is cleared and the skirting is off before the floor sander arrives, work can start straight away. Moving furniture on site delays the job, and when restoring room by room you need somewhere to put the furniture.
- Electricity: large sanders draw a lot of power. Check in advance whether the circuit breakers will cope and show the floor sander where the consumer unit is. Any changes to the electrical installation must only be made by a qualified electrician.
- Neighbours: in a block of flats, check the house rules or the terms of your lease and let the managing agent or residents' association and your neighbours know in advance, as sanders are noisy. Refinishing the surface of parquet does not normally need any approval. If the repair would change the floor build-up or affect the structure, check the requirements with local building control first.
- Timing: wood reacts to air humidity. In very dry or very humid air it behaves differently and the filler in the gaps may crack later. This is why restorations are often planned for spring or autumn.
- Conditions during drying: the room should not be heated at full power or left in a draught. Gentle ventilation without draughts helps drying, while cold and high humidity slow it down.
- Access to the room: nobody enters the room during varnishing, including children and pets. Every footprint in fresh varnish means a repair.
- Order of works: parquet restoration belongs at the end of a renovation, after decorating and other dusty work. Dust from other trades would end up sealed in the varnish.
Typical mistakes and how they show up later
Most mistakes are not visible straight after handover. They appear in side light, after the first heating season or after several months of foot traffic.
A DIY sander in inexperienced hands. It creates waves and dips that cannot be undone. On thin parquet it can sand right through to the tongue.
Skipped denibbing. Raised wood fibres remain sealed under the top coats. The surface feels rough and the top coat bonds less well to the base coat.
Sanding without dust extraction. Dust spreads through the whole home and particles then get trapped in the varnish. The surface is rough and looks dirty.
Not keeping to drying times between coats. This causes peeling, bubbles or patchy areas in the varnish.
Loose blocks left unrepaired. Over time they move again, creak and the varnish cracks along the joints.
Wrong timing and conditions. Restoring in an extremely dry or humid period, or turning the heating up sharply straight after varnishing, leads to the filler cracking and the gaps opening again.
Loading the floor too early. Rugs laid too soon and furniture without pads damage fresh varnish. Under a rug the varnish may stay dull or take an imprint.
How to check the finished floor
Inspect the finished work in daylight and with side lighting, for example with a torch held close to the floor. Check that:
- the surface is smooth and even, without waves or swirl marks from the sander,
- there are no darker or rougher strips along the edges and in the corners,
- the gaps are filled and the filler matches the colour of the wood,
- there are no hairs, dust or bubbles trapped in the varnish,
- the sheen is the same across the whole floor, without dull patches,
- the blocks do not creak or move when walked on,
- the areas around thresholds, door frames and radiator pipes are sanded and varnished like the rest of the floor,
- walls, door frames and doors are not damaged by the sander or marked with varnish,
- you have been told which varnish was used and when the floor can take full load,
- you know which products to clean the floor with and how often to renew the protective layer.
Frequently asked questions
The guide price is €30.00 per m². The final amount depends mainly on the condition of the wood, the width of the gaps, the number of old varnish layers, the wood species, the shape of the room, the floor area and the chosen varnish.
In a typical flat, usually two to four days. The first day is for sanding and filling, the following days for varnishing and waiting for the coats to dry. Careful walking is usually possible about one day after the last coat, furniture goes back after a few days, and the varnish generally takes full load and rugs after about a week, depending on the manufacturer.
Often yes, especially if the sanding machines have dust extraction and a water-based varnish is used. It is more practical, however, to restore the rooms one at a time and keep out of them during varnishing.
One sanding removes only a thin layer of wood, so both traditional solid and mosaic parquet usually withstand several restorations. Engineered parquet has a small reserve that is often enough for one, at most a few, sandings. If you do not know what type of floor you have, the floor sander will assess it on site.
When the wood is ruined by moisture, attacked by pests, the parquet is coming away from the subfloor over large areas or there is nothing left to sand. In that case replacement is usually more sensible, for example with a floating click timber floor. As long as the wood is healthy and firm, restoration is almost always worth it.
A sander can be hired, but the large machine is hard to control and mistakes in the wood cannot be undone, as described in the section on typical mistakes. A full restoration with filling of the whole surface and three coats of varnish is better left to a professional floor sander. You can handle the preparation yourself: clearing the room, carefully removing the skirting and caring for the floor properly afterwards.
Stick felt pads under furniture, put a doormat at the entrance and clean only with a slightly damp cloth and a product intended for varnished wood. Avoid large amounts of water and harsh chemicals. Under heavier use, it is worth renewing just the top coat of varnish after some years, before the varnish wears through to the wood.
Related work
How laminate and other floating floors are laid, what the subfloor needs, which underlay to choose and how to check the finished floor.
How a floating click timber floor is laid: subfloor preparation, underlay, the method, common mistakes and checking the finished floor.
How click vinyl flooring is laid: subfloor preparation, underlay, expansion gaps and trims. Common mistakes and how to check the finished floor.
How to fill the gap between skirting board and wall, when to use acrylic caulk or silicone, and what to check in the finished job.
How skirting boards are fitted, which material and fixing method to choose, and how to handle the expansion gap, corners and uneven walls.
How nailed and bitumen-bonded parquet is lifted, what makes the job harder, and how to clear bitumen residue and prepare the subfloor.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.