Building work price list: Fitting Floor Skirting Boards
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Flooring cost | ||||
| Install skirting boards | lm | €4.00 / lm | lm | enter quantity- |
| Remove old nailed/glued wood parquet flooring | m² | €12.00 / m² | m² | enter quantity- |
| Careful removal of old parquet to laying plan | m² | €5.10 / m² | m² | enter quantity- |
| Install laminate flooring | m² | €12.50 / m² | m² | enter quantity- |
| Install click vinyl flooring | m² | m² | - | |
| Install click/lock engineered wood flooring | m² | €12.50 / m² | m² | enter quantity- |
| Full-bond solid/engineered wood flooring | m² | €12.00 / m² | m² | enter quantity- |
| Install underfloor heating (electric mat) | m² | m² | - | |
| Install parquet blocks | m² | m² | - | |
| Install Chevron parquet flooring | m² | m² | - | |
| Install and bond original parquet blocks (reclaimed/repaired) | m² | m² | - | |
| Sand and 3x lacquer parquet flooring | m² | m² | - | |
| Sand, fill and 3x lacquer parquet flooring (complete) | m² | €30.00 / m² | m² | enter quantity- |
| Caulking around skirting boards | lm | €1.90 / lm | lm | enter quantity- |
| Install transition strips | pcs | €8.00 / pcs | pcs | enter quantity- |
What skirting boards are for
Skirting boards close the joint between the floor and the wall. They are usually fitted as the last step after the floor is laid, most often after laminate flooring laid as a floating floor, click vinyl flooring or a floating timber floor with a click system. Without skirting, a gap stays visible along the wall, and the bottom of the plaster is exposed to knocks from the vacuum cleaner, furniture and shoes. Skirting is also replaced on its own, for example when the old boards are worn out or no longer suit a new wall colour. The wider context of this trade is covered in the overview of flooring work.
A floating floor needs a gap between the floor and the wall around the whole room, known as the expansion gap. The floor moves through it: it expands and contracts slightly as temperature and humidity change. The width of the gap is set by the floor manufacturer and is usually around 8 to 10 millimetres. On large areas, or where the manufacturer requires it, the gap can be wider. The skirting covers this gap, but it must not block it.
Skirting also protects the wall during cleaning and gives the room a finished look. It is a small item, but poor fitting can spoil even an expensive floor.
Choosing skirting boards: what to decide before booking the work
The choice depends on the type of floor, the conditions in the room and whether the skirting may need to come off later. It is worth settling these questions before buying the materials.
Material
- PVC skirting tolerates moisture and is easy to keep clean. It suits hallways, kitchens and vinyl floors. Many profiles have a cable channel.
- MDF skirting is available foil-wrapped to match laminate or with a white finish. It looks more substantial but does not like water, so it does not belong in a bathroom.
- Solid timber or veneered skirting suits timber floors. It can be sanded and refinished.
- Metal skirting is used mainly in modern and minimalist interiors. It is usually aluminium or stainless steel, withstands moisture and knocks, and is cut with a metal-cutting saw. Accurate cuts take more effort, because any gap on a metal surface cannot be filled with caulk.
Fixing method
- Adhesive is quick and clean, but it needs a flat, sound and clean wall. Bonded skirting is often damaged when removed.
- Clips are screwed to the wall and the skirting snaps onto them. The boards can then be removed easily for decorating or when the floor is replaced.
- Direct fixing with screws or nails holds most firmly. It is used mainly with timber skirting and in areas subject to heavier wear.
Other points worth settling
- Depth of the skirting: the bottom of the board must reach across the whole expansion gap and slightly onto the floor. Where the gap is wider, choose a deep enough profile, otherwise the gap will remain visible.
- Colour and height: skirting in the floor colour visually extends the floor, while white skirting links with door frames and walls. Taller skirting hides unevenness at the bottom of the wall better.
- Corners: whether they will be mitred or finished with plastic corner pieces. Mitred corners look cleaner, corner pieces are more forgiving of inaccuracy.
- Cables: if a data or aerial cable is to run along the wall, choose skirting with a cable channel.
- Old skirting: who removes and disposes of it, and who repairs any plaster pulled off with it.
- Flats: replacing skirting is a routine job inside a flat. If it is part of wider alterations, for example work on walls, check the terms of the lease and inform the managing agent or freeholder where required.
How much skirting to buy
Skirting is measured in running metres. Measure the perimeter of the room, meaning the length of every wall including alcoves and returns around chimney breasts, and deduct the width of door openings. Add an allowance for cuts and offcuts, roughly 10 % for an ordinary room and more for an irregular hallway. Skirting is sold in lengths, commonly around 2 to 2.5 m, and the supplier states the exact length. Count corners, joiners, end caps and, for a clip system, the clips as well.
How skirting is fitted step by step
- Checking the gap: the fitter checks that the expansion gap is clear around the whole perimeter and that no spacers or pieces of underlay are left in it.
- Preparing the wall: the bottom of the wall is cleaned of dust and plaster, and a straightedge shows where the wall bulges or dips.
- Measuring: individual runs are measured and the positions of corners and joints are planned, ideally in less visible places, such as behind doors or furniture.
- Cutting: internal and external corners are usually mitred at 45 degrees. Where walls are not square, the angle is adjusted to suit. The alternative is plastic corner and joining pieces, which hide a less accurate cut.
- Ends: at door frames and transitions to another floor, the skirting is finished with an end cap or meets a threshold strip.
- Fixing: skirting is always fixed to the wall, never to the floor. The bottom edge should only rest lightly on the floor so that it does not press it down.
- Caulking: on white or painted skirting, the top joint between the board and the wall is filled with paintable acrylic caulk. On decor skirting, caulk is used only where the appearance requires it, in a colour matching the skirting.
- Finishing: the boards are wiped down and any traces of caulk or adhesive are removed.
An experienced fitter usually finishes a simple room in a few hours. A whole flat is often done in one working day. An irregular hallway, removal of old skirting, plaster repairs or painting timber skirting add time.
Cost of fitting skirting boards: what affects it
The indicative labour price is €4.00 per running metre. This applies to standard fitting. The final price rises mainly because of the following:
- Room shape: a rectangular room with one door is straightforward. A hallway with many doors, alcoves, chimney breasts and radiator pipes means many short pieces and precise cuts, so the same number of metres takes considerably more work.
- Condition of the wall: uneven old plaster makes bonding harder and often requires closer fixings or more caulking.
- Wall material: hard concrete is slower to drill. Plasterboard, aircrete blocks and hollow bricks need special wall plugs designed for them, as standard plugs do not hold.
- Fixing method: adhesive is usually quickest, while clips and direct screw fixing involve drilling and therefore more time.
- Skirting material: timber, metal and tall skirting take more effort to cut and fit than PVC. Unfinished timber skirting also has to be painted or varnished, which is extra work.
- Mitred corners instead of corner pieces: an accurate mitre, especially on out-of-square walls, takes longer than fitting a plastic corner.
- Removing old skirting: old bonded skirting can pull off plaster that then needs repairing. Removal and repairs are usually charged separately.
- Caulking the top joint: this is standard on white skirting, but takes more time on uneven walls.
When comparing quotes, ask whether materials, corners and end caps, caulking and disposal of old skirting are included, and how the length is measured, in particular whether door openings are deducted.
How to prepare the home so the work goes quickly
- Finished walls: painting or wallpapering should be complete and dry.
- Finished floor: the whole floor should be laid, including threshold strips, so the skirting can meet them.
- Clear access to the walls: an empty room is quicker than a furnished one. Moving furniture away from the walls and clearing the bottom shelves of wardrobes shortens the job.
- Materials on site: skirting, corners, end caps and clips bought in advance with an allowance. If materials run out halfway, the work stops.
- Acclimatising the skirting: it is sensible to leave timber and MDF skirting in the home for a few days so it adjusts to the temperature and humidity.
Common fitting mistakes and how they show up later
Skirting pressed onto or screwed into the floor. This happens often in practice. The floor cannot move and begins to lift and ripple in warm or humid weather. Hard filler or silicone pushed into the expansion gap, or a forgotten spacer, causes the same problem.
Skirting too shallow for a wide gap. The board does not cover the whole gap, and the edge of the flooring shows when viewed from above or when the floor moves.
Inaccurate corner cuts. They leave a visible gap that caulk only partly hides.
Too few clips or too little adhesive. Over time the skirting comes away from the wall, most often where the wall bulges and at the ends.
Wrong wall plugs. In plasterboard, aircrete or hollow brick a standard plug spins and the clip gradually works loose.
Bonding to a dusty or greasy wall. The adhesive does not hold and the skirting comes away after a few weeks.
Randomly placed joints in the middle of a wall. They are distracting and should be in less visible places.
MDF skirting in damp conditions. It absorbs water, swells and the foil starts to peel.
How to check the finished work at handover
- the skirting is firmly fixed and does not move or spring away when pressed lightly,
- the bottom edge only rests on the floor and does not press it down,
- the expansion gap is not filled with caulk or silicone and no spacers are left in it,
- the skirting covers the gap around the whole perimeter and the floor edge does not show anywhere,
- corners and joints meet without visible gaps,
- joints are in less visible places,
- ends at door frames and transitions are finished with end caps or neatly cut,
- the top joint at the wall is evenly caulked without smears,
- there are no scratches, adhesive residue or dust on the skirting or the wall,
- the floor does not knock or lift when walked on near the wall.
DIY guide: fitting skirting boards on clips
A competent DIYer can fit skirting on clips. Before drilling, check where electrical cables and pipes run, especially below sockets and near radiators. A cable and pipe detector greatly reduces the risk of damage. You will need a drill, wall plugs and screws suited to the wall material, a tape measure and a mitre box or mitre saw.
- Prepare the gap and the wall and plan corners and joints as described above.
- Mark the clip positions according to the manufacturer's instructions, usually about every 40 to 60 centimetres and always close to corners and ends.
- Drill the holes, insert the wall plugs and screw on the clips so that they do not sit on the floor.
- Test the mitre angle on an offcut first, and only then cut the final pieces.
- Snap the skirting onto the clips, working from the corner towards the middle of the wall.
- Fit the corner pieces, joiners and end caps.
- Wipe the skirting down and caulk the top joint if needed.
Frequently asked questions
The indicative labour price is €4.00 per running metre. Expect to pay more for an irregular hallway with many doors and corners, for uneven walls, for timber skirting that still needs painting, and for removing old bonded skirting.
A fitter usually finishes a simple room in a few hours and a whole flat often in one working day. It takes longer with many corners and doors, when old skirting is removed and plaster repaired, and when timber skirting is painted on site.
It is possible, but not worth it. The skirting then has to be masked, paint can run onto it and the paint line is often uneven. If the skirting is already in place on clips, it can simply be taken off before decorating.
On a flat, sound wall, adhesive is quick and clean. If redecorating or a later floor replacement is expected, clips are more practical, because the skirting comes off without damage.
Yes, if the plasterboard is sound, clean and painted. The adhesive holds on the surface, so the paint must be well bonded and free of dust. For clips or screws, use wall plugs designed for plasterboard.
Many PVC and some MDF skirting profiles have a channel at the back for a thin cable, for example a data or aerial cable. Mains power cables do not belong in skirting, and any changes to them should be made by an electrician.
The most common cause is a blocked expansion gap. Either the skirting presses into the floor, or the gap is filled with caulk or a forgotten spacer. The solution is to release the skirting and clear the gap.
Related work
How laminate and other floating floors are laid, what the subfloor needs, which underlay to choose and how to check the finished floor.
How a floating click timber floor is laid: subfloor preparation, underlay, the method, common mistakes and checking the finished floor.
How click vinyl flooring is laid: subfloor preparation, underlay, expansion gaps and trims. Common mistakes and how to check the finished floor.
How to fill the gap between skirting board and wall, when to use acrylic caulk or silicone, and what to check in the finished job.
How nailed and bitumen-bonded parquet is lifted, what makes the job harder, and how to clear bitumen residue and prepare the subfloor.
How to lift old parquet without damage, mark every block to a laying plan, then clean and store it so it can be relaid later.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.